LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D0902838-v5 |
Advanced LIGO Optical Layout |
Peter Fritschel et al. |
Detector
System Engineering
|
03 Jan 2017 |
M0900136-v2 |
Restricted Work Alone Policy |
Charles Taylor et al. |
Safety
Policies
|
23 Jun 2018 |
E1200392-v9 |
Initial Alignment Procedure - LBSC2 As Built |
Jason Oberling et al. |
Installation
|
10 Mar 2014 |
T1600486-x0 |
The Coating RIng-down MEasurement system (CRiMe) Document Tree |
Eric Gustafson et al. |
Basic R&D
|
03 Jan 2022 |
T1800133-v4 |
Instrument Science White Paper 2018 |
Brian Lantz et al. |
Basic R&D
Detector
|
26 Jun 2018 |
T1700336-v3 |
Squeezing Quantum Noise with Waveguides |
Dhruva Ganapathy et al. |
Basic R&D
|
19 Feb 2018 |
G1701526-v1 |
SURF Final Presentation: Measuring Scatter In Silicon for Future LIGO Devices |
Amani Garvin et al. |
Basic R&D
|
19 Feb 2018 |
G1702201-v2 |
Advanced LIGO coating history |
GariLynn Billingsley et al. |
Core Optics
|
15 Nov 2017 |
G1700998-v2 |
Optical properties of silicon for cryogenic interferferometric gravitational wave detectors |
Zeno Tornasi et al. |
Basic R&D
Core Optics
|
12 Jul 2017 |
G1701225-v3 |
Shear and Bulk Mechanical Loss in Titania-Doped Tantala |
Gregg Harry et al. |
Public Talk / Colloquium
|
11 Jul 2017 |
E1700016-v9 |
Specification : 40m dichroic RC folding mirrors |
Gautam Venugopalan et al. |
Basic R&D
Upgrades
|
28 Jun 2017 |
T1400160-v8 |
Optical Lever Inspection and Hanford |
Thomas Vo et al. |
Auxiliary Optics
Installation
|
16 May 2017 |
E1600262-v4 |
aLIGO OMC: Spare OMC production plan |
Koji Arai et al. |
Assembly
Sensing and Control
|
09 Dec 2016 |
E1200481-x0 |
aLIGO, AOS |
Dennis Coyne et al. |
Auxiliary Optics
|
25 Oct 2016 |
T1500327-v5 |
Scaling of Thermal Noise Measurements |
Matthew Abernathy et al. |
Basic R&D
|
20 Jul 2016 |
G1601461-v3 |
LIGO Voyager: a 3G interferometer in a 1G facility |
Rana Adhikari et al. |
Upgrades
|
07 Jul 2016 |
T1500346-v2 |
Excess Current Noise in High current photo-detection |
Arjun Iyer et al. |
Basic R&D
Reports
|
29 Oct 2015 |
G1300115-v34 |
aLIGO Fabrication Acceptance Review Tracking |
Dennis Coyne et al. |
Reviews
Detector
Subsystem Test
|
03 Jun 2015 |
L1400006-x0 |
Fabrication Acceptance Review Documents and Status |
David Shoemaker et al. |
Detector
Reviews
|
06 May 2015 |
E1300806-v38 |
Stray Light Control and Viewport Fabrication Acceptance Punch List |
Robert Schofield et al. |
Auxiliary Optics
|
17 Apr 2015 |
T1100490-v1 |
Forward scatter comparison CP06 and CP03 |
GariLynn Billingsley et al. |
Subsystem Test
Core Optics
|
31 Mar 2015 |
T1000230-v7 |
Initial Alignment Subsystem (IAS), Final Design Document |
Scott Shankle et al. |
Reviews
Final Design
|
26 Mar 2015 |
T1400712-v1 |
aLIGO OpLev BOM Spreadsheets OBSOLETE |
Jodi Fauver et al. |
System Engineering
|
18 Mar 2015 |
T1500081-v2 |
3IFO OpLev Inventory Spreadsheets |
Douglas Cook et al. |
Auxiliary Optics
|
18 Mar 2015 |
E1300769-v4 |
Core Optics Fabrication Acceptance Documentation |
GariLynn Billingsley et al. |
Core Optics
|
12 Mar 2015 |
E1500123-v2 |
Fabrication Acceptance Review Status of Input Optics EOM Testing, Modeling and Discussion of need for Waivers from Systems |
Christopher Guido et al. |
Reviews
Input Optics
|
11 Mar 2015 |
L1200291-v5 |
TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions |
Calum Torrie et al. |
Installation
System Engineering
|
11 Mar 2015 |
E1100734-x0 |
Advanced LIGO Initial Alignment Procedures |
Douglas Cook et al. |
Installation
|
10 Mar 2015 |
M1300468-v10 |
Acceptance Process for the Advanced LIGO Project |
Dennis Coyne et al. |
Policies
Project Controls
|
23 Feb 2015 |
P1400214-v2 |
A Fiber Optic System for Automatic System Identification of the Frequency Response of the Photodetectors in an Interferometric Gravitational Wave Detector |
Nichin Sreekantaswamy et al. |
Basic R&D
|
08 Nov 2014 |
P1400190-v1 |
Searching for Higher Order Cladding Modes in Fiber Optic Based Optical Levers |
Brian Charous et al. |
Auxiliary Optics
|
29 Sep 2014 |
G1400396-v5 |
Plenary Lecture for SPIE Laser Damage 2014 |
Calum Torrie et al. |
System Engineering
|
18 Sep 2014 |
G990022-x0 |
End to End Model - Presentation for LSC Meeting 4, University of Florida |
Hiro Yamamoto et al. |
Document Migration
|
03 Sep 2014 |
T1400225-v1 |
Modeling mirror shape to reduce substrate Brownian Noise in interferometric gravitational wave detectors |
Emory Brown et al. |
Core Optics
|
31 Aug 2014 |
T1400229-v1 |
Automated Photodetector Frequency Response Measurement System - Final Report |
Alexander Cole et al. |
Operations
|
31 Aug 2014 |
E1100690-v10 |
Initial Alignment Procedure - WBSC8 As Built |
Jason Oberling et al. |
Installation
|
11 Jun 2014 |
T1400398-v1 |
Proposal: Automatic System Identication of Photodetectors in a Gravitational Wave Detector |
Nichin Sreekantaswamy et al. |
Basic R&D
|
10 Jun 2014 |
E1101071-v5 |
Initial Alignment Procedure - WBSC6 As Built |
Douglas Cook et al. |
Installation
Auxiliary Optics
|
05 Jun 2014 |
E1300457-v3 |
Acceptance Document Template |
Eric Gustafson et al. |
Subsystem Test
|
05 Jun 2014 |
G990079-x0 |
Detector Characterization: Simulated Data Sets - LSC Meeting 5 Presentation, 19 July 1999, Stanford University |
Lee Samuel Finn et al. |
Document Migration
|
23 May 2014 |
E1100784-v8 |
Initial Alignment Procedure - LHAM4 and LHAM5 As Built |
Ken Mason et al. |
Installation
|
23 May 2014 |
E1100783-v9 |
Initial Alignment Procedure - LHAM2 and LHAM3 As Built |
Douglas Cook et al. |
Installation
|
22 May 2014 |
G990058-x0 |
A Path to LIGO II - PAC6 Meeting Presentation, 20-21 May 1999 |
Eric Gustafson |
Document Migration
|
16 May 2014 |
E1200393-v6 |
Initial Alignment Procedure - LBSC3 As Built |
Jason Oberling et al. |
Installation
|
05 May 2014 |
T1200031-v3 |
LIGO III Strawman Design Workshop Report |
Rana Adhikari et al. |
Basic R&D
Conceptual Design
Upgrades
Detector
|
07 Apr 2014 |
E1200495-x0 |
aLIGO, AOS, Optical Levers |
Eric James et al. |
Auxiliary Optics
|
25 Mar 2014 |
G960287-x0 |
Development of a Ring Mode Cleaner and Efrficient Mode-Matching for Initial LIGO 10 Watt Laser |
Robert L Byer et al. |
Document Migration
|
14 Mar 2014 |
|
|
|
None
|
|
E1101072-x0 |
Initial Alignment Procedure -LHAM6 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1100782-x0 |
Initial Alignment Procedure -LHAM1 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
T1000334-v2 |
Review Report Interferometer Sensing and Control Final Design |
Robert Schofield et al. |
Sensing and Control
|
17 Feb 2013 |
G1200154-v8 |
AOS SLC Stray Light Control and Viewports |
Lisa Austin et al. |
NSF
Auxiliary Optics
|
09 Apr 2012 |
G1200138-v1 |
Cavity Ringdown Spectroscopy |
Eric Gustafson et al. |
Basic R&D
|
06 Mar 2012 |
G1100444-v2 |
AOS OpLev Technical Talk aLIGO NSF Review 25-27 April 2011 |
Eric Gustafson et al. |
Auxiliary Optics
NSF
Reviews
|
05 May 2011 |
G1100439-v4 |
AOS TMS Technical Presentation for aLIGO NSF Review April 2011 |
Eric Gustafson |
Auxiliary Optics
Management
System Test
|
05 May 2011 |
T080333-v1 |
Report from the Thermal Noise Interferometer Advisory Board Meeting of November 2008 |
Gregg Harry et al. |
Basic R&D
|
19 Aug 2010 |
T1000006-v6 |
Notes on Making Electrical Connections to Metalized Crystals & Test Outline for ESD Samples |
Margot Hennig et al. |
Suspensions
|
23 Mar 2010 |
L1000094-v1 |
Design Review for ISC demodulator and in-vacuum quad detector |
Robert Schofield et al. |
Sensing and Control
|
05 Mar 2010 |
T0900327-v1 |
Review Report Interferometer Sensing and Control Preliminary Design |
Robert Schofield et al. |
Sensing and Control
Preliminary Design
|
12 Aug 2009 |
P0900042-v1 |
Technology Development toward Third Generation Ground-based Gravitational Wave Detectors |
Vuk Mandic et al. |
Basic R&D
Proposals
|
31 Mar 2009 |
T080171-x0 |
LIGO Laboratory Activities for LSC MOU Planning - July 2008 |
Eric Gustafson et al. |
Document Migration
|
25 Jul 2008 |
T080140-x0 |
Next Generation Coating Research: Whitepaper for Coating Vendors |
Martin Fejer et al. |
Document Migration
|
24 Jun 2008 |
T080146-x0 |
Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review |
GariLynn Billingsley et al. |
Document Migration
|
11 Jun 2008 |
T080090-x0 |
Report from the Thermal Noise Interferometer Advisory Board Meeting of March 2008 |
Andri M Gretarsson et al. |
Document Migration
|
21 May 2008 |
T080092-x0 |
Review Report Interferometer Sensing and Control Conceptual Design |
Hartmut Grote et al. |
Document Migration
|
09 May 2008 |
T070248-x0 |
Advanced LIGO Input Optics Preliminary Design Review Report |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
G070610-x0 |
LIGO Laboratory R&D for the Period Fall 2007 to Fall 2008 - MIT MOU Review |
Eric Gustafson |
Document Migration
|
14 Sep 2007 |
T070099-x0 |
Report from the Thermal Noise Interferometer Technical Advisory Board Meeting - March 2007 |
Eric Black et al. |
Document Migration
|
16 Aug 2007 |
T000148-x0 |
Core Optics II |
Jordan Camp et al. |
Document Migration
|
03 Sep 2002 |
G010306-x0 |
Thermal Noise from Coatings - LSC Meeting August 13 - 16, Hanford WA |
Gianpietro Cagnoli et al. |
Document Migration
|
15 Aug 2001 |
G010067-x0 |
Report on E2 Lock Losses - LSC Meeting March 14 -17 2001 Livingston, LA |
Bill Butler et al. |
Document Migration
|
26 Mar 2001 |
G010113-x0 |
Adaptive Optics for Wavefront Correction of High Average Power Lasers - LSC Meeting March 14 -17 2001 Livingston, LA |
Robert L Byer et al. |
Document Migration
|
20 Mar 2001 |
G010097-x0 |
Excess Mechanical Loss from Dielectric Mirror Coatings on Interferometer Test Masses - LSC Meeting March 14 -17 2001 Livingston, LA |
Gianpietro Cagnoli et al. |
Document Migration
|
19 Mar 2001 |
T000143-x0 |
Optical Absorption Measurements in Sapphire - LIGO II System Requirements Meeting, MIT, May 18-19 2000 |
Alex Alexandrovski et al. |
Document Migration
|
05 Mar 2001 |
G990108-x0 |
LIGO Lasers and Optics Working Group |
Eric Gustafson |
Document Migration
|
05 Mar 2001 |
G000251-x0 |
Optics and Lasers Opening Talk: Six-Month Report to the LSC --LSC presentation/plenary session |
Eric Gustafson |
Document Migration
|
20 Sep 2000 |
G000238-x0 |
Status of High-Power Laser Dev. at Stanford - LSC Meeting at Hanford, August 15-17, 2000 |
Robert L Byer et al. |
Document Migration
|
15 Sep 2000 |
G000270-x0 |
Excess Loss Due to Coatings On Mirror Substrates - LSC Meeting at Hanford, August 15-17, 2000 |
Gianpietro Cagnoli et al. |
Document Migration
|
15 Sep 2000 |
G000146-x0 |
Modulators and Faraday Isolators - What We Learnt from LIGO I |
Alexandre Gorlenko et al. |
Document Migration
|
18 May 2000 |
T990080-x0 |
LSC White Paper on Detector Research and Development |
Eric Gustafson et al. |
Document Migration
|
27 Sep 1999 |
G980113-x0 |
LIGO Scientific Collaboration (LSC) Meeting 3 Presentation: Detector Confidence and Statistical Analysis Working Group Summary |
Sam Finn et al. |
Document Migration
|
15 Sep 1998 |
T960173-x0 |
DRAFT, High-Power Laser Development |
Robert L Byer et al. |
Document Migration
|
31 Oct 1996 |