LIGO-Number Title Author(s) Topic(s) Last Updated
D1001895-v7 aLIGO TCS Ring Heater Assembly, Lower Segment Giacomo Ciani et al. Fabrication
Vacuum
Auxiliary Optics
19 Jun 2013
D1001838-v6 aLIGO TCS Ring Heater Assembly, Upper Segment Mindy Jacobson et al. Auxiliary Optics
Vacuum
Fabrication
04 Jan 2013
D0901318-v4 GS-13, Flexure, Bottom Sam Barnum et al. Final Design
Seismic Isolation
08 Oct 2024
D0901319-v4 GS-13, Flexure, Top Sam Barnum et al. Final Design
Seismic Isolation
08 Oct 2024
E0900027-v1 LIGO Project Modifications to the GS-13 Brian Lantz Seismic Isolation
Final Design
08 Oct 2024
D0902705-v2 Test Oscillator Source Assembly Daniel Sigg Basic R&D
20 Sep 2024
M1500263-v1 Guidelines for Advanced LIGO Detector Upgrade Development Review Dennis Coyne Policies
Preliminary Design
Upgrades
Conceptual Design
Final Design
System Engineering
Requirements
Fabrication
05 Oct 2016
E960050-v13 LIGO Vacuum Compatible Materials List Dennis Coyne Vacuum
Fabrication
Final Design
11 Sep 2024
P2300422-v4 Interferometric Precision Measurement with Macroscopic Silicon Optomechanics Aaron Markowitz Thesis/Dissertation
04 Sep 2024
D1001425-v9 ISC R2 Rich Abbott et al. Conceptual Design
Sensing and Control
28 Aug 2024
D1001427-v24 ISC C1-C4 (CER Rack Layout) Rich Abbott et al. Conceptual Design
Sensing and Control
28 Aug 2024
E1100530-v10 PSL/IO/TCS Beckhoff (Slow Controls) Chassis Cabling/Wiring Diagram Jose Puente et al. Installation
State Control and Monitoring
Laser Systems
16 Aug 2024
G2401190-v14 AlGaAs Mirror Noise Scalings Andri M Gretarsson A#
13 Aug 2024
P1500087-v1 [Thesis] Lock Acquisition and Sensitivity Analysis of Advanced LIGO Interferometers Denis Martynov Thesis/Dissertation
06 Aug 2024
D0900623-v16 Output Faraday Isolator Suspended Bench (OFI, OFIS, Table) Assembly Eduardo Sanchez Auxiliary Optics
Basic R&D
17 Jul 2024
D060218-v2 BOSEM Betsy Weaver et al. Suspensions
Preliminary Design
28 Jul 2020
T020205-v1 Models of the Advanced LIGO Suspensions in Mathematicaâ„¢ Mark Barton Modelling
Suspensions
30 Apr 2012
E0900023-v14 PROCESS FOR MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO Douglas Cook et al. Basic R&D
System Engineering
27 Oct 2021
D0900506-v6 aLIGO Systems BSC5-L1, Top Level Chamber Assembly Ignacio Romero System Engineering
Final Design
11 Jun 2018
G2400740-v3 Suspending a 100kg mass Edgard Bonilla A#
07 May 2024
T1400660-v2 LIGO Docent Survey Results - Key Findings William Katzman Education, Outreach
07 May 2024
T2200287-v3 Report of the LSC Post-O5 Study Group Peter Fritschel et al. A#
Upgrades
Reports
07 May 2024
D071165-v2 Sensor Target Andy Stein et al. Final Design
Seismic Isolation
11 May 2009
G2400888-v2 Tutorial on continuous gravitational wave searches in Open Data Workshop 7 TakahiroS Yamamoto et al. Continuous Wave
Activity
16 Apr 2024
D0900492-v5 aLIGO Systems, BSC3-L1 Top Level Chamber Assembly Ignacio Romero Final Design
System Engineering
12 Jul 2012
D0900471-v5 aLIGO Systems, BSC4-L1 Top Level Chamber Assembly Ignacio Romero System Engineering
Final Design
23 Jan 2014
P2300166-v10 LSC White Paper on NGGW: Dovetailing with Next Generation Faciltiies Patrick Brady et al. A#
Data Analysis
Astrophysics / Multi-messenger
A+
25 Mar 2024
E0900041-v6 Advanced LIGO Input Test Mass Coating Specification Gregg Harry Final Design
Core Optics
Requirements
12 Mar 2024
E0900068-v5 Advanced LIGO End Test Mass (ETM) Coating Specification Rand Dannenberg Core Optics
Final Design
12 Mar 2024
E080031-v1 MIRROR BLANK MATERIAL, AdLIGO ITM MIRROR GariLynn Billingsley et al. Final Design
Fabrication
Core Optics
11 Mar 2024
E080047-v1 Mirror Blank Material, AdLIGO ETM Mirror Specification GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
11 Mar 2024
E1100187-v6 LIGO Music Wire Specification. Calum Torrie et al. Suspensions
Requirements
System Engineering
15 Feb 2024
G2301738-v3 LIGO A# - Post O5 upgrade and step toward Cosmic Explorer Brian Lantz Detector
Upgrades
A#
05 Feb 2024
T2300163-v2 Summary of BHQS workshop parameters Edgard Bonilla et al. A#
Suspensions
07 Jun 2023
D070441-v6 HLTS Prism Breakoff, Lower Wire, Optic Calum Torrie et al. Final Design
Suspensions
14 Nov 2023
D0810033-v4 HSTS LOWER MASS PRIMARY PRISM Calum Torrie Final Design
Suspensions
14 Nov 2023
T0900450-v5 Sensor Noise Estimates for Advanced LIGO Seismic Isolation Systems (SEI_sensor_noise.m) Brian Lantz et al. Requirements
Basic R&D
Final Design
Seismic Isolation
Preliminary Design
03 Nov 2023
D1800027-v26 Top Level Conceptual Layout of A+ Calum Torrie et al. A+
Operations
System Engineering
02 Dec 2021
P2200287-v1 [Thesis] Catching the Waves in the Sea of Noise: Squeezed Light in Advanced LIGO and Beyond Nutsinee Kijbunchoo et al. Thesis/Dissertation
02 Nov 2023
D1003029-v1 Work Platform Example Drawing Sam Barnum et al. Requirements
Observatory Facilities
26 Oct 2023
T0900457-v1 LT1012 is the best op-amp for the GS13 preamp Brian Lantz Final Design
Seismic Isolation
Requirements
24 Oct 2023
E1300945-x0 aLIGO, System Requirements Dennis Coyne System Engineering
Requirements
20 Oct 2023
T2300137-v2 Report from the Heavy Suspension Workshop @ MIT Brian Lantz et al. A#
Suspensions
19 Oct 2023
E1000654-v5 Specification for LIGO BSC Work Platforms John Worden et al. Installation
19 Oct 2023
E080138-v2 Coated Substrate, ALIGO PRE-MODE MATCHING TELESCOPE MIRROR #2 Rodica Martin et al. Preliminary Design
Input Optics
05 Oct 2023
G2301746-v4 Heavy Test Mass suspension for A# Brian Lantz A#
Suspensions
13 Sep 2023
T040111-v1 Galling Tendencies and Particles Produced by Ultra Clean Screw Threads Michael Gerfen et al. Basic R&D
System Engineering
07 Sep 2023
G2201909-v3 A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update Jeffrey Kissel et al. Sensing and Control
Incoming Inspection
Subsystem Test
Commissioning
05 Sep 2023
D071462-v2 Asm, Position Sensor Target Face Andy Stein et al. Final Design
Seismic Isolation
03 Aug 2023
P2300230-v2 Improving our ability to distinguish gravitational-wave signals from detector transient noise for the fourth LIGO-Virgo-KAGRA observing run Sofia Alvarez Thesis/Dissertation
Machine Learning
Detector Characterization
15 Jul 2023
D1003013-v3 SLC ACB PHOTODETECTOR ASSY Niem Nguyen Auxiliary Optics
Modelling
06 Jul 2023
D1000227-v10 CUSTOM CABLE V25M Benjamin Abbott et al. Fabrication
Seismic Isolation
23 Jul 2012
D1000234-v11 CUSTOM CABLE V25X-TBD (Assembly) Jay Heefner et al. Suspensions
Fabrication
01 Jun 2023
E960022-v25 LIGO Clean and Bake Methods and Procedures Betsy Weaver et al. Vacuum
Cleaning
Fabrication
03 May 2023
T952011-v1 Optical Pathlength Noise in Sensitive Interferometers Due to Residual Gas Rainer Weiss et al. Requirements
Document Migration
Vacuum
24 Apr 2023
T840003-v1 Optical Pathlength Fluctuations in an Interferometer Due To Residual Gas Stan Whitcomb Requirements
Vacuum
18 Apr 2023
D060546-v1 Impact Absorber for Glass Stops, Earthquake Stop Derek Bridges Suspensions
Preliminary Design
15 May 2009
D000442-x0 Staging Building for Livingston, Issued for Construction - Second Level Mechanical Plan John Desmond Document Migration
12 Dec 2000
T2000002-v2 A+ Filter Cavity Tube, Expansion Joints and Tube Supports: Conceptual Design and Requirements. Dennis Coyne Vacuum
System Engineering
Requirements
A+
Conceptual Design
15 Mar 2023
D0901749-v4 3/4" Diameter Optics Post Richard Savage Conceptual Design
Sensing and Control
Operations
Fabrication
Input Optics
27 Feb 2023
T0900449-v1 Changing the op-amp for the L-4C seismometer preamp Brian Lantz Seismic Isolation
Final Design
Basic R&D
Requirements
12 Feb 2023
T2300041-v1 A♯ Strain Sensitivity Kevin Kuns et al. Conceptual Design
Upgrades
27 Jan 2023
D2200215-v1 OMC DCPD Whitening Filter Chassis Assembly (2x Channel, 1x OMC Version) Dean Schaetzl Upgrades
Sensing and Control
20 Jan 2023
D1000220-v7 CUSTOM CABLE V25A-40 Emery Brown et al. Seismic Isolation
Sensing and Control
Fabrication
01 May 2012
G1300394-v24 LSC Logo Slide Marco Cavaglia et al. Public Talk / Colloquium
11 Dec 2022
E2100222-v10 Specification: Silicon Test Mass HR/AR Coatings, 40m Mariner phase I (ITM & ETM) Francisco Carcoba et al. Core Optics
Activity
23 Aug 2021
D070447-v2 HLTS Overall Assembly Derek Bridges Suspensions
Final Design
31 Oct 2022
E2100086-v1 Class A Fluoroelastomers Processing Procedure Jordan Vanosky et al. Cleaning
Vacuum
18 Oct 2022
T1100232-x0 aLIGO Damping Loop Design and Performance (Level 2.0 Design) Jeffrey Kissel Integration
Commissioning
Requirements
Subsystem Test
Suspensions
19 Sep 2022
E2200368-v2 FTIR: Novamet 760 Pre-Bake Calum Torrie et al. Cleaning
Vacuum
07 Sep 2022
P2200268-v1 [Thesis] Environmental Noise in Gravitational Wave Detectors and the Search for Gravitational Wave Signals Associated with Gamma-Ray Bursts During LIGO's Third Observing Run Philippe Nguyen Thesis/Dissertation
Data analysis software
Detector Characterization
GW Bursts
Astrophysics / Multi-messenger
Data quality / vetoes
29 Aug 2022
M2100169-v2 Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 Sheila Rowan et al. Memorandum
Upgrades
A+
Core Optics
Technical Review Board
Basic R&D
04 Aug 2022
M2100135-v3 LIGO A+ and Virgo AdV+ selection process for O5 Test Mass Coating Michael Zucker et al. Basic R&D
Technical Review Board
Core Optics
A+
Upgrades
Memorandum
04 Aug 2022
M2100225-v1 Record of Agreement: O5 coating selection for LIGO A+ and Virgo AdV+ Michael Zucker et al. Collaboration
Upgrades
A+
Advisory Boards (e.g., PAC, PAP, ...)
Memorandum
Basic R&D
Technical Review Board
Core Optics
04 Aug 2022
E080512-v6 E080512_ETM_Polishing_Specification Mick Flanigan Core Optics
Final Design
01 Aug 2022
E1200519-x0 aLIGO, AOS, TCS Mindy Jacobson System Test
Auxiliary Optics
System Engineering
Vacuum
Installation
Subsystem Test
16 Nov 2012
T2200264-v1 Detector Improvements and Optimization to Advance Gravitational-wave Astronomy Varun Srivastava Commissioning
Basic R&D
Thesis/Dissertation
Conceptual Design
Modelling
A+
15 Jul 2022
E1900159-v2 OSEM Satellite Box Noise Analysis Rich Abbott et al. A+
30 Jun 2022
E1000369-x0 aLIGO Testing and Commissioning Documentation Dennis Coyne System Engineering
Subsystem Test
System Test
24 Jun 2022
E0900347-v9 ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith et al. Final Design
Auxiliary Optics
08 Feb 2012
E0900480-v6 FTIR Testing to Qualify Parts for LIGO UHV Service Dennis Coyne Fabrication
Vacuum
10 Jun 2022
T2000526-v1 Damage test Ink and First Contact GariLynn Billingsley et al. Cleaning
Core Optics
24 May 2022
E1100439-v7 General Optics Cleaning Procedure Margot Hennig Core Optics
System Engineering
Cleaning
Input Optics
Auxiliary Optics
29 Apr 2022
T2200028-v2 LLO FC Tube cleaning Michael Fyffe Cleaning
Vacuum
A+
06 Apr 2022
D1000221-v6 CUSTOM CABLE V25A-100 Emery Brown et al. Fabrication
Seismic Isolation
12 Oct 2011
T1300645-v6 Re-assessing HAM-ISI Noise Budget Performance Model for aLIGO Jeffrey Kissel Modelling
Seismic Isolation
14 Mar 2022
G2100331-v1 G1 Calibrated Sensitivity Spectra Apr 11 2020 (Representative best of O3GK -- C02) Nikhil Mukund et al. Cleaning
Calibration
Commissioning
03 Mar 2022
T1800447-v7 Design Requirement Document of the A+ filter cavity (HSTS) and relay optics (HDS, HXDS) for frequency dependent squeezing Lee McCuller et al. A+
09 Feb 2022
D071100-v3 Spring Andy Stein et al. Final Design
Seismic Isolation
03 Feb 2022
D070483-v6 PUM Driver Board Circuit Diagrams Ron Cutler Final Design
10 Oct 2018
G1300086-v2 HAM6 Coordinate System Definitions Jeffrey Kissel Seismic Isolation
Modelling
Final Design
Sensing and Control
Commissioning
Suspensions
Integration
System Engineering
08 Mar 2015
D071120-v2 Actuator Magnet Mount Andy Stein Final Design
Seismic Isolation
11 May 2009
Q2000005-v1 TMS shroud Post-coating Inspection Kyle Baric et al. Incoming Inspection
30 Nov 2021
D071463-v2 Asm, Position Sensor Target Andy Stein et al. Seismic Isolation
Final Design
26 Oct 2021
D071497-v2 Asm, Fixture, Actuator Set-Up Andy Stein et al. Seismic Isolation
Final Design
26 Oct 2021
D071424-v2 Asm, Keel Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D071470-v2 Asm, GS-13 with Fixtures Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D071464-v2 Asm, Position Sensor Andy Stein et al. Seismic Isolation
Final Design
26 Oct 2021
D071431-v2 Asm, Flexure Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D071430-v2 Asm, Spring and Flexure Andy Stein et al. Seismic Isolation
Final Design
26 Oct 2021
D071427-v2 Asm, Outer Wall, Small Panel Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D071412-v2 Asm, Stage 0 Stiffener Andy Stein et al. Seismic Isolation
Final Design
26 Oct 2021
D071442-v2 Asm, Actuator Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D071450-v2 Asm, HAM-ISI Locker Andy Stein et al. Final Design
Seismic Isolation
26 Oct 2021
D080177-v4 Compensation Plate ESD Pattern Drawing Kurt Buckland et al. Core Optics
Sensing and Control
Preliminary Design
08 Oct 2021
D972610-v1 HAM Support Tube Stephany Foley Seismic Isolation
Final Design
10 Sep 2009
M2100065-v1 More Testing Melody Araya Temporary Test Document
06 Oct 2021
G2101278-v1 Mariner: LIGO Voyager Prototype at the Caltech 40 m Lab (GWADW June-2021) Christopher Wipf et al. Basic R&D
Upgrades
15 Sep 2021
D080658-v6 aLIGO, COC End Test Mass (ETM) Substrate (D080658_ALIGO COC_ETM_SUBSTRATE) Calum Torrie Core Optics
Final Design
14 Jul 2021
D080657-v7 aLIGO, COC Input Test Mass (ITM) Substrate (D080657 ALIGO COC ITM SUBSTRATE) Calum Torrie Final Design
Core Optics
14 Jul 2021
E080511-v6 ITM Polish Specification Mick Flanigan Core Optics
Final Design
14 Jul 2021
T1100068-v23 Photon Calibrator Preliminary/Final Design Document Jonathan Berliner et al. Auxiliary Optics
Calibration
Requirements
Basic R&D
Assembly
Laser Systems
Upgrades
Preliminary Design
Detector Characterization
Conceptual Design
06 Jul 2021
T0900023-v2 (OMC) DC (DCPD) readout (Power) Normalization (Linearization) Sam Waldman Commissioning
Sensing and Control
25 Jun 2021
D972611-v1 LIGO HAM Expansion Bellows Stephany Foley Seismic Isolation
Final Design
01 Sep 2009
T0900140-v1 AdL Triple Acquisition Driver Board Prototype Test Plan Jay Heefner System Test
Suspensions
19 Aug 2009
E1700309-v3 Procedure for handling, cleaning and baking DLC coated stray light baffles Alena Ananyeva et al. System Engineering
Cleaning
29 Aug 2018
D0902791-v1 Viewport Guard Dust Cover Michael Meyer Preliminary Design
Vacuum
19 Jan 2010
E1000309-v13 aLIGO HAM-ISI Testing Procedure, Phase I: Assembly Validation Fabrice Matichard et al. Subsystem Test
Seismic Isolation
27 Feb 2013
E010613-v2 Generic Requirements & Standards for Detector Subsystems Dennis Coyne Final Design
Fabrication
System Engineering
24 Feb 2021
D080276-v2 aLIGO (US, ISC) 4 Channel Satellite Amplifier Circuit Board (Amp, SatAmp) Jay Heefner Final Design
Suspensions
04 Feb 2021
D1000669-v5 TCS Hartmann Sensor Plate Jesper Munch et al. Auxiliary Optics
Fabrication
Preliminary Design
Final Design
Conceptual Design
01 Feb 2021
D0901075-v3 AdLIGO SEI Bulk Trim Masses Stephany Foley et al. Seismic Isolation
Final Design
20 Nov 2009
D1000920-v2 CUSTOM CABLE V3A-135 Emery Brown et al. Fabrication
Seismic Isolation
13 Jul 2012
D1000919-v2 CUSTOM CABLE V3A-95 Emery Brown et al. Seismic Isolation
Fabrication
13 Jul 2012
D1000918-v3 CUSTOM CABLE V3A-70 Benjamin Abbott et al. Fabrication
Suspensions
13 Jul 2012
D1000218-v6 CUSTOM CABLE V3A -25 Benjamin Abbott et al. Fabrication
Seismic Isolation
05 Jul 2012
D1000222-v7 CUSTOM CABLE V25A-120 Benjamin Abbott et al. Seismic Isolation
Fabrication
31 May 2012
D1900281-v9 Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 Lee McCuller et al. A+
Preliminary Design
Squeezer
03 Nov 2020
T1300642-v1 Sapphire Prism bond test: Results GariLynn Billingsley et al. System Engineering
Suspensions
Activity
23 Sep 2020
E1000828-v2 Prism bonding jig settings calculation sheet for the ERM and TCP Marielle van Veggel Suspensions
Installation
13 Sep 2011
E0900047-v23 LIGO Contamination Control Plan Betsy Weaver et al. Observatory Facilities
Risk Management
Cleaning
17 Sep 2020
D970412-v1 BSC Overall Assembly, LIGO Vacuum Equipment Dennis Coyne Vacuum
Fabrication
16 Sep 2020
E1200266-v2 Ground Glass Freon Wipe Cleaning Procedure Margot Hennig et al. Core Optics
Input Optics
Cleaning
Auxiliary Optics
20 Feb 2013
E2000429-v2 Specification: Filter Cavity Tube Supports Dennis Coyne et al. Final Design
System Engineering
Vacuum
Requirements
10 Sep 2020
P2000352-v1 [Thesis] Search for Gravitational Waves Associated With Gamma-ray Bursts During LIGO's Second Observing Run Jordan Palamos Thesis/Dissertation
Data quality / vetoes
GW Bursts
Astrophysics / Multi-messenger
Detector Characterization
02 Sep 2020
T2000407-v3 Instrument Science White Paper 2020 Peter Fritschel et al. Basic R&D
Detector
Integration
Upgrades
31 Aug 2020
E1000006-v24 Advanced LIGO Quad Suspension Metal-Build Assembly Procedure Joe ODell et al. Installation
Suspensions
Assembly
06 Aug 2020
E1900149-v3 MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY END MIRROR GariLynn Billingsley Auxiliary Optics
A+
04 Aug 2020
D1001530-v7 aLIGO ISC Whitening Board Rich Abbott Conceptual Design
Sensing and Control
03 Aug 2020
T1900279-v2 Filter Cavity Optics Substrates Lee McCuller et al. A+
Core Optics
03 Aug 2020
D1900066-v3 A+ HAM8 84in Cover Don Griffith A+
16 Aug 2019
D1900059-v3 A+ HAM7 84in Cover Don Griffith A+
16 Aug 2019
P2000198-v1 Precision Mechanical Rotation Sensors for Terrestrial Gravitational Wave Observatories Michael Ross Thesis/Dissertation
10 Jul 2020
T1200518-v1 Leak localization of the Y arm beamtube at LLO Michael Meyer et al. Vacuum
System Test
06 Jul 2020
E1900237-v4 In vacuum active elements and electronics for frequency-dependent squeezing Lee McCuller et al. A+
Squeezer
14 Nov 2019
E1700080-x0 AERM08 Characterization GariLynn Billingsley Core Optics
Incoming Inspection
16 Jun 2020
E1700079-x0 AERM07 Characterization GariLynn Billingsley Core Optics
Incoming Inspection
16 Jun 2020
E1700078-x0 AERM06 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700077-x0 AERM05 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
P2000185-v3 A Data Mining Approach to Signal Processing in Laser Interferometer Gravitational-Wave Observatory (LIGO) Fscan Data Thomas Harris et al. Detector Characterization
Thesis/Dissertation
08 Jun 2020
E080177-v2 RGA Test Qualification of components for the LIGO UHV Dennis Coyne Vacuum
System Engineering
Fabrication
15 Apr 2020
P2000141-v1 [Thesis] High-Power Operation of Interferometric Gravitational-Wave Detectors Aaron Buikema Basic R&D
Thesis/Dissertation
12 Apr 2020
P1800233-v2 [Thesis] Characterization and Reduction of Noise in Gravitational Wave Detectors Nikhil Mukund Thesis/Dissertation
07 Apr 2020
D080117-v1 Penultimate Mass, ETM Quad Russell Jones Fabrication
Suspensions
Final Design
14 Feb 2020
P1600161-v16 The basic physics of the binary black hole merger GW150914 Alan Wiseman et al. Education, Outreach
Compact Binaries
Data Analysis
Astrophysics / Multi-messenger
19 Jan 2020
D1001036-v3 64 Channel Binary Input Printed Circuit Board Rich Abbott Fabrication
18 Mar 2011
D1001266-v3 64 Channel Binary Output Printed Circuit Board Rich Abbott Fabrication
System Engineering
18 Feb 2015
D1002062-v2 Front Panel for 64 Channel Binary Output Module Charles Osthelder Fabrication
27 Sep 2010
D1002055-v2 Front Panel for 64 Channel Binary Input Module Charles Osthelder Fabrication
27 Sep 2010
T1900391-v1 Measuring mechanical loss in cryogenic gentle nodal suspension resonator Anna Roche et al. Core Optics
Basic R&D
Suspensions
Upgrades
03 Dec 2019
E1100159-v2 aLIGO Music Wire Specification Jeffrey Lewis Requirements
02 Mar 2011
P1800271-v2 Multimessenger Astronomy with Gravitational Waves from Core-Collapse Supernovae Marek Szczepanczyk Astrophysics / Multi-messenger
Thesis/Dissertation
02 Nov 2019
E1900148-v2 MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR GariLynn Billingsley A+
Auxiliary Optics
21 Oct 2019
P1900316-v1 Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO David Reitze et al. Detector
Basic R&D
Activity
11 Oct 2019
D1000895-v3 Plate 2 for SEI Vibration absorber - 5 Lb version Sebastien Biscans Seismic Isolation
Basic R&D
03 Oct 2019
D0900906-v1 Earthquake Stop Adjuster and Mount, 2 Inch Derek Bridges Suspensions
Preliminary Design
03 Oct 2019
E1900300-v1 FTIR - aLIGO, PCAL-VIDEO CAM, PERISCOPE SHIELD (OUTER PANEL) Adam Branch et al. Cleaning
System Engineering
25 Sep 2019
P1700451-v1 [Thesis] Extending the scientific reach of Advanced LIGO by compensating for temporal variations in the calibration of the detectors Darkhan Tuyenbayev Thesis/Dissertation
Calibration
16 Sep 2019
G1901510-v1 A+ Beamsplitter material long lead review GariLynn Billingsley A+
Requirements
Core Optics
20 Aug 2019
G1901469-v1 A+ ISC review: DRD and conceptual design Lee McCuller et al. A+
15 Aug 2019
T1900395-v1 Incoming Test of Spare SQZ Mephisto 1000NE Laser System Jason Oberling Laser Systems
Incoming Inspection
06 Aug 2019
G0900436-v1 eLIGO: So how's it turning out? Michael Zucker et al. System Test
Meeting
Upgrades
Integration
Installation
Commissioning
Detector
30 Jul 2019
G0900460-v1 Near Term Upgrades after Advanced LIGO Rana Adhikari Core Optics
Observatory Facilities
Sensing and Control
Upgrades
30 Jul 2019
G1600932-v3 Introduction to Gravitational-Wave Astronomy - LIGO and the Emerging Gravitational Wave Detector Network Fred Raab Public Talk / Colloquium
15 Jul 2019
E1100860-v4 AOSEM Electronic Noise Test Procedure Mark Barton Suspensions
Subsystem Test
10 Jul 2019
G1900970-v1 Cosmic Explorer status and update (for Dawn V) Evan Hall Upgrades
09 Jul 2019
E1900147-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR GariLynn Billingsley et al. Auxiliary Optics
A+
07 Jun 2019
E1900146-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
D1900146-v1 MIRROR BLANK DRAWING, A+ FILTER CAVITY, END MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
D1900147-v1 MIRROR BLANK DRAWING, A+ FILTER CAVITY, INPUT MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
E0900007-v1 Air Bake Oven John Worden et al. Requirements
22 May 2019
E0900089-v4 Substrate, ALIGO Signal Recycling Mirror (SRM) for L1 and H1 interferometers - unfolded Rodica Martin Final Design
Input Optics
Core Optics
17 May 2019
E0900087-v4 Substrate, ALIGO Power Recycling Mirror (PRM) for L1 and H1 interferometers - unfolded Rodica Martin Core Optics
Input Optics
Final Design
17 May 2019
E0900093-v4 Substrate, ALIGO Signal Recycling Mirror 2 (SR2) for L1 and H1 interferometers - unfolded Rodica Martin Final Design
Input Optics
Core Optics
17 May 2019
E0900091-v4 Substrate, ALIGO Power Recycling Mirror 2 (PR2) for L1 and H1 interferometers - unfolded Rodica Martin Final Design
Input Optics
Core Optics
17 May 2019
D1900133-v2 A+, LAND USE PERMIT BOUNDARY MAP Eduardo Sanchez A+
System Engineering
08 May 2019
E950083-x0 Science Requirements for the LIGO Beam Tube Baffles Albert Lazzarini Requirements
Vacuum
Modelling
30 Apr 2019
G1900137-v2 LIGO Vacuum System Design, Construction, Features and Faults Michael Zucker et al. NSF
Upgrades
Vacuum
30 Apr 2019
G1900136-v2 Vacuum Requirements for Future Gravitational Wave Interferometers Michael Zucker et al. Vacuum
NSF
Upgrades
30 Apr 2019
G1900803-v1 Visualizing BNS and BBH detections for 2G and 3G detectors Evan Hall et al. Upgrades
Astrophysics / Multi-messenger
Conceptual Design
Public Talk / Colloquium
Compact Binaries
17 Apr 2019
D047813-v3 D047813-- Baseplate, GS-13 Horizontal & Vertical Andy Stein Final Design
Seismic Isolation
11 Apr 2019
D1900069-v6 A+, GENERAL ARRANGEMENT DRAWING (H1) Eduardo Sanchez A+
10 Apr 2019
G1900666-v1 A+ for LIGO GariLynn Billingsley Meeting
A+
Core Optics
06 Apr 2019
T1100083-v4 Test Procedure for Low Noise VCO Daniel Sigg et al. Subsystem Test
21 Mar 2019
P1900072-v1 Proceedings: NSF Workshop on Large Ultrahigh-Vacuum Systems for Frontier Scientific Research Fred Dylla et al. Vacuum
Proposals
Basic R&D
Collaboration
NSF
Advisory Boards (e.g., PAC, PAP, ...)
Upgrades
20 Mar 2019
P1500068-v1 [Thesis] Gravitational-wave Science with the Laser Interferometer Gravitational-wave Observatory Madeline Wade Thesis/Dissertation
Data Analysis
18 Mar 2019
P1000103-v1 [Thesis] Calibrating and Improving the Sensitivity of the LIGO Detectors Jeffrey Kissel Final Design
Seismic Isolation
Modelling
Upgrades
Commissioning
Calibration
16 Mar 2019
T0810012-v3 High Reliability Electronics for LIGO Rich Abbott Requirements
Risk Management
System Engineering
14 Mar 2019
T040027-v2 Conceptual Design of Beamsplitter Suspension for aLIGO Norna Robertson et al. Suspensions
Conceptual Design
14 Mar 2019
G1800953-v1 [GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network Jeffrey Kissel Basic R&D
Calibration
System Engineering
Integration
Preliminary Design
Astrophysics / Multi-messenger
Upgrades
GW source predictions
External Collaboration
Modelling
Sensing and Control
Observatory Facilities
12 Mar 2019
D080373-v3 Clamp Asm, HAM Support Tube Andy Stein Final Design
Seismic Isolation
11 Jan 2011
P1800304-v1 Metrics for next-generation gravitational-wave detectors Evan Hall et al. Conceptual Design
GW Bursts
Upgrades
Observatory Facilities
Compact Binaries
Basic R&D
05 Oct 2018
D0901154-v4 aLIGO Systems, WBSC10-H1 Top Level Chamber Assembly Jose Eduardo Chavez System Engineering
Final Design
11 Apr 2013
T1800084-v6 Horizon plots and noise curves for second- and third-generation detectors Evan Hall Basic R&D
Compact Binaries
Astrophysics / Multi-messenger
Upgrades
GW source predictions
Modelling
21 Jan 2019
T1000543-v2 Effect of the end mirror curvature error to the contrast of a Fabry-Perot based Michelson interferometer Koji Arai Core Optics
Modelling
09 Jan 2019
T1500188-v5 Active Wavefront Control Roadmap Aidan Brooks et al. State Control and Monitoring
Sensing and Control
Conceptual Design
Preliminary Design
Core Optics
Auxiliary Optics
Requirements
Basic R&D
30 Nov 2018
E1800107-v2 Particle Count Procedure for Compression Packs Regina Lee Cleaning
13 Nov 2018
S1800574-v4 Compression Pack Inspection Regina Lee Quality Assurance
Cleaning
Public relations
13 Nov 2018
S1800596-v2 Mini Compression Pack ADE Regina Lee Cleaning
13 Nov 2018
E1800096-v1 CVD Silicon Carbide Beam Dump Inspection Regina Lee Incoming Inspection
08 Nov 2018
E1800039-v3 Baffle Inspection D1003301-v9 Regina Lee Incoming Inspection
System Engineering
08 Nov 2018
T0900144-v7 Adv. LIGO Arm Length Stabilization Design Sam Waldman et al. Final Design
Sensing and Control
08 Nov 2018
E1600165-v1 VOPO Suspension - Conceptual Design Study Alvaro Fernandez-Galiana et al. Squeezer
Thesis/Dissertation
24 Oct 2018
T0900083-v1 Modeling Cable Noise in LIGO Julian Earl Freed-Brown et al. Suspensions
Final Design
Modelling
16 Oct 2018
T0900291-v1 PUM Driver Board Test Plan Ron Cutler System Test
12 Oct 2018
T1800042-v5 The A+ design curve Lisa Barsotti et al. A+
Conceptual Design
11 Oct 2018
D070270-v2 Locker Sleeve Andy Stein Seismic Isolation
Final Design
11 May 2009
P1800001-v2 [Thesis] Gravitational-wave detection beyond the quantum shot-noise limit: The integration of squeezed light in GEO 600 Emil Schreiber Thesis/Dissertation
Squeezer
08 Oct 2018
G1801629-v2 Poster on Optic Cooling Cryo System Prototype Summer Project at Stanford Jaimi Salone et al. Basic R&D
Preliminary Design
Upgrades
Public Talk / Colloquium
31 Aug 2018
G1801680-v1 Can you get there from here? David McClelland et al. A+
Upgrades
Proposals
31 Aug 2018
G1801597-v1 Gravitational-wave Detectors: The US Landscape 2020–2030 and Beyond (A Personal Perspective) David Reitze Detector
Public Talk / Colloquium
Upgrades
30 Aug 2018
G1801657-v1 Towards 3G - an Australian update David McClelland Upgrades
29 Aug 2018
G1601435-v3 Getting an A+: Enhancing Advanced LIGO Michael Zucker et al. Basic R&D
Suspensions
Proposals
Vacuum
Core Optics
System Engineering
A+
Conceptual Design
Seismic Isolation
Collaboration
Squeezer
Sensing and Control
Observatory Facilities
24 Aug 2018
T1000489-v9 Specification for LIGO Installation Cleanrooms John Worden et al. Procurements
Installation
01 Aug 2018
G1801310-v1 Experimental Search for Avalanches of Entangled Dislocations as a Source of Dissipation and Mechanical Noise Morgan Shaner Suspensions
Thesis/Dissertation
19 Jul 2018
T1300756-v2 Status of UF Ring Heater Prototype development and testing Giacomo Ciani et al. Upgrades
Basic R&D
Auxiliary Optics
28 Jun 2018
T070082-v1 LIGO I mirror scattering loss by microroughness Hiro Yamamoto Commissioning
Core Optics
06 Apr 2009
P1800114-v1 Experimental Search for Avalanches of Entangled Dislocations as a Source of Dissipation and Mechanical Noise Morgan Shaner et al. Seismic Isolation
Thesis/Dissertation
20 Jun 2018
E1200702-v1 ITM04 Transmission Liyuan Zhang et al. Core Optics
System Test
12 Jun 2018
T0900288-v3 Advanced LIGO anticipated sensitivity curves OBSOLETE David Shoemaker Detector
Modelling
12 Jun 2018
E1700190-v1 ITM01 Integrated Scatter Liyuan Zhang et al. System Test
Core Optics
12 Jun 2018
L1800095-v1 TRB Report on the Stray Light Control Shroud for the Output Faraday Isolator (OFI) Dennis Coyne et al. System Engineering
Auxiliary Optics
Reports
Reviews
Upgrades
12 Jun 2018
M1500313-v2 Process Flow for Engineering Operations of the LIGO Detector Systems Dennis Coyne et al. Integration
System Engineering
Requirements
Installation
Subsystem Test
Commissioning
Fabrication
Detector
Policies
System Test
Operations
Final Design
Conceptual Design
07 Jun 2018
P1700260-v13 Improving astrophysical parameter estimation via offline noise subtraction for Advanced LIGO Jenne Driggers et al. Cleaning
Detector
25 May 2018
E1800089-v7 Specification : 40m dichroic RC folding mirrors Gautam Venugopalan et al. Core Optics
Upgrades
21 May 2018
G1800831-v1 Speculations on the future of the LIGO detectors Brian Lantz Requirements
Basic R&D
14 May 2018
E1700425-v1 ECR to change OFI REFL Baffle to beam dump Janeen Romie et al. Upgrades
System Engineering
04 May 2018
T1500202-v1 Optimization of beamtube pumping to mitigate acquired water vapor Michael Zucker Vacuum
Requirements
29 Mar 2018
T020059-v3 Are Reaction Chains Needed for aLIGO HAM Optics? Norna Robertson et al. Requirements
Suspensions
Document Migration
Modelling
Seismic Isolation
Sensing and Control
13 Feb 2018
D020214-x0 Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram Dennis Coyne Document Migration
11 Apr 2003
T1600251-v1 Cleaning Optics for LDF Vacuum System Madeleine Kerr Cleaning
Basic R&D
25 Jan 2018
E070078-v2 SUBSTRATE, ALIGO MODE CLEANER FLAT MIRROR Rodica Martin et al. Input Optics
Final Design
23 Jan 2018
E0900420-v1 Coated Substrate, ALIGO INPUT MODE CLEANER FLAT MIRROR (IMCF) for H2 interferometer - folded Rodica Martin Activity
Input Optics
23 Jan 2018
G1800030-v1 LIGO: The Instruments that Launched Gravitational-wave Astronomy Peter Fritschel Requirements
23 Jan 2018
D0900615-v5 Faraday Isolator Prism Mounting Assy-RH Niem Nguyen et al. Assembly
Auxiliary Optics
15 Nov 2012
D0900614-v4 Faraday Isolator Prism Mounting Assy-LH Niem Nguyen Assembly
Auxiliary Optics
15 Nov 2012
T1700533-v1 Collection of contamination flakes scraped off of LHO XMB Chandra Romel Vacuum
Quality Assurance
Cleaning
05 Dec 2017
D1101821-v2 aLIGO, PESDESTAL,2IN MIRROR MOUNT Ayodele Cole et al. Final Design
Assembly
Fabrication
Auxiliary Optics
Cleaning
Vacuum
05 Nov 2012
T1600204-v2 Mirror loss estimates for aLIGO pre-modecleaners Liyuan Zhang et al. Laser Systems
Operations
Incoming Inspection
30 Jul 2016
E970129-v2 Material, Process, Handling, and Shipping Specification for Welding Diaphragm Bellows Stephany Foley Seismic Isolation
Fabrication
27 Nov 2017
E1000617-v6 (QUAD) Quadruple Suspension Controls Arrangement Poster Derek Bridges Subsystem Test
Suspensions
Assembly
13 Nov 2017
P1500136-v4 [Thesis] Gravitational Wave Astrophysics: Instrumentation, Detector Characterization, and a Search for Gravitational Signals from Gamma-ray Bursts Daniel Hoak Detector Characterization
Astrophysics / Multi-messenger
GW Bursts
Data quality / vetoes
Detector
Thesis/Dissertation
30 Oct 2017
L1700110-v1 Public File Permission Test Document Phil Ehrens et al. Temporary Test Document
18 Oct 2017
D1001049-v1 SLC FM ELLIPTICAL BAFFLE STANDOFF ADAPTER #8-32 Niem Nguyen Modelling
Auxiliary Optics
26 Oct 2011
E1700072-v6 Timeline for the aLIGO squeezing upgrade at LLO Lisa Barsotti et al. Upgrades
26 Sep 2017
D1002257-v7 Faraday Isolator Crossbar Plate In Manuel Ruiz et al. Basic R&D
Auxiliary Optics
14 Dec 2012
S1700276-v5 Diamond-Like Carbon Coating Sample 4 Ellie Parisi et al. Cleaning
17 Aug 2017
D0902845-v5 Faraday Isolator Refl Baffle Manuel Ruiz et al. Basic R&D
Auxiliary Optics
18 Oct 2012
G1701405-v1 Introduction to GW detectors Gabriele Vajente et al. Education, Outreach
27 Jul 2017
G1701153-v1 Introduction to GW detectors Gabriele Vajente Education, Outreach
Detector
26 Jul 2017
G1501204-x0 Bringing LIGO Outreach into the Formal Education Setting Amber Stuver Meeting
Education, Outreach
11 Sep 2015
G1701204-v4 Overview of Education and Public Outreach Activities of the LSC Marc Favata Education, Outreach
10 Jul 2017
G1701274-v1 Selected technical challenges for Cosmic Explorer Evan Hall Basic R&D
Conceptual Design
Modelling
Upgrades
06 Jul 2017
G1701266-v2 Squeezing highlights Lisa Barsotti Upgrades
06 Jul 2017
G1701271-v1 Update from GWIC at DAWN III Sheila Rowan Education, Outreach
06 Jul 2017
G1701205-v2 Welcome to the Third Dawn Workshop Albert Lazzarini Public relations
Upgrades
Organizational Relations
06 Jul 2017
E1700016-v9 Specification : 40m dichroic RC folding mirrors Gautam Venugopalan et al. Upgrades
Basic R&D
28 Jun 2017
G1700809-v1 What Does Low Frequency Control Look Like in the 2G+ and 3G Era? Jeffrey Kissel Sensing and Control
State Control and Monitoring
Squeezer
Conceptual Design
Seismic Isolation
Upgrades
System Engineering
Integration
Basic R&D
Suspensions
12 Jun 2017
P1600245-v1 [Thesis] Squeezed states for advanced gravitational wave detectors Eric Oelker et al. Squeezer
Thesis/Dissertation
02 Jun 2017
G1701005-v3 Animation comparing GW170104 data to NR Andrew Williamson Education, Outreach
01 Jun 2017
G1700966-v7 GW170104 Infographic Daniel Williams Education, Outreach
01 Jun 2017
G1601316-v1 GW151226 sky localization graphics for press release Leo Singer et al. Public Talk / Colloquium
Astrophysics / Multi-messenger
GW source predictions
Data analysis software
Public relations
Education, Outreach
Compact Binaries
05 Jul 2016
G1701015-v1 Three dimensional embedding diagram Aurore Simonnet et al. Education, Outreach
30 May 2017
T0900174-v2 Advanced-LIGO Optical Levers Design Requirements Eric Black Auxiliary Optics
Requirements
10 May 2017
G1700848-v1 LIGO Voyager Update Christopher Wipf Basic R&D
Detector
Upgrades
08 May 2017
G1700835-x0 Possible KAGRA Upgrades Yuta Michimura et al. Conceptual Design
Upgrades
07 May 2017
T1600039-v2 How big is Kerry? Gernot Heissel et al. Education, Outreach
12 Feb 2016
F030014-v2 Clean and Bake Request Form John Worden et al. Assembly
Policies
18 Apr 2011
G1400964-v3 Brief Introduction to Advanced LIGO Suspensions Brett Shapiro Suspensions
Education, Outreach
17 Apr 2017
T1300162-v2 Photon Calibrator: Optical Follower Servo Design Requirements Gregorio Tellez et al. Requirements
Auxiliary Optics
07 Mar 2017
G1501372-v1 O1 DARM Loop Design Comprisons and Critiques Jeffrey Kissel Incoming Inspection
Modelling
Sensing and Control
Calibration
Integration
07 Mar 2017
P1700049-v1 «VIRGO Evaluation Report» March 31st 1990 Riccardo DeSalvo et al. Education, Outreach
Proposals
07 Mar 2017
P1600015-v6 Educator's guide LIGO Scientific Collaboration et al. Education, Outreach
15 Feb 2017
D1001202-v1 PZT Driver Rear Panel Daniel Sigg Basic R&D
10 Feb 2017
T1700002-x0 Final reports from LIGO SURF program, Summer 2016 Alan Weinstein Data Analysis
Education, Outreach
Detector
11 Jan 2017
P1200057-v1 [Thesis] Adaptive Modal Damping for Advanced LIGO Suspensions Brett Shapiro Thesis/Dissertation
12 Dec 2016
G1602326-v3 Gravitational Waves Detected (for Séminaire Poincaré) David Shoemaker Public Talk / Colloquium
Detector
Compact Binaries
03 Dec 2016
G1602295-v1 LIGO: the Dawn of Gravitational Wave Astronomy Jameson Graef Rollins Education, Outreach
Data and Computing
Astrophysics / Multi-messenger
Data Acquisition System
Public Talk / Colloquium
State Control and Monitoring
16 Nov 2016
T1600055-v7 Real-Time Code Generator (RCG) Version 3.0 Release Notes Rolf Bork et al. Data Acquisition System
Upgrades
09 Nov 2016
T1400570-v7 RCG Version 2.9 Release Notes Rolf Bork et al. Data Acquisition System
Upgrades
09 Nov 2016
T1600290-v10 Modeling Loss and Thermal Noise in Silicon Gravitational Wave Detector Suspensions Nikhil Mathur et al. Suspensions
Conceptual Design
Modelling
Upgrades
04 Nov 2016
P1600095-v2 Search for Long-Duration Transient Gravitational Waves Associated with Magnetar Bursts during LIGO's Sixth Science Run Ryan Quitzow-James Thesis/Dissertation
GW Bursts
02 Nov 2016
G1602198-v1 Little Pre-Mode Cleaner and tilt-free seismometer Veronica Leccese et al. Seismic Isolation
Activity
Laser Systems
30 Oct 2016
D000209-v3 OSEM Shadow Sensor optical bandpass filter Rana Adhikari Suspensions
27 Oct 2016
G1501352-v2 Actuating the DARM loop using a Photon Calibrator Richard Savage et al. Basic R&D
Thesis/Dissertation
14 Oct 2016
G1600254-v2 Gravitational Waves Discovered Ryan Lang et al. Education, Outreach
22 Sep 2016
G1600253-v2 Gravitational Wave Detectors Sinead Walsh et al. Education, Outreach
22 Sep 2016
G1600251-v2 History of Gravitational Waves Sinead Walsh et al. Education, Outreach
22 Sep 2016
G1600252-v2 Sources of Gravitational Waves Sinead Walsh et al. Education, Outreach
21 Sep 2016
G1601915-v1 Spacetime Symphony: APOD and Gravitational Waves Lynn Cominsky Education, Outreach
13 Sep 2016
P1600275-v1 Spacetime Symphony: APOD and Gravitational Waves Lynn Cominsky et al. Education, Outreach
13 Sep 2016
G1601897-v1 Einstein, Black Holes, Gravitational Wave Detection, and Art Gregg Harry Education, Outreach
Public Talk / Colloquium
09 Sep 2016
G1601640-v2 Intro to Controls and the new Controls Working Group Brett Shapiro Sensing and Control
Education, Outreach
30 Aug 2016
G1400001-v3 The Status of Advanced LIGO: Light at the End of the Tunnels! Jeffrey Kissel et al. Public Talk / Colloquium
Laser Systems
State Control and Monitoring
Sensing and Control
Data Acquisition System
Seismic Isolation
Auxiliary Optics
Input Optics
System Engineering
Integration
Core Optics
Suspensions
Commissioning
17 Aug 2016
G1600726-v3 Intro to Control Theory for LIGO People Brett Shapiro Education, Outreach
16 Aug 2016
G1601582-v3 Cries from the Cosmos: LIGO Observes the Most Extreme Phenomena in Our Universe Fred Raab Public Talk / Colloquium
Education, Outreach
05 Aug 2016
T1600118-v6 The LSC White Paper on Education and Public Outreach 2016-2017 Joey Key et al. Education, Outreach
02 Aug 2016
G1601479-v1 DAWN Workshop - Introduction to the Session B Panel on coordinated R&D Giovanni Losurdo Upgrades
Detector
08 Jul 2016
G1601483-v1 Contribution to the Session B Panel on coordinated R&D Pedro Marronetti NSF
Upgrades
08 Jul 2016
G1600769-v5 Projected sensitivities towards aLIGO+ Lisa Barsotti et al. Upgrades
07 Jul 2016
P1600010-v2 LIGO Magazine issue 8 2/2016 Andreas Freise Education, Outreach
07 Jul 2016
G1601461-v3 LIGO Voyager: a 3G interferometer in a 1G facility Rana Adhikari et al. Upgrades
07 Jul 2016
G1601455-v1 The Birth of Gravitational-Wave Astronomy Fred Raab et al. Public Talk / Colloquium
04 Jul 2016
G1601415-v2 Deteccion de ondas gravitacionales Gabriela Gonzalez Public Talk / Colloquium
28 Jun 2016
G1601416-v1 DetecciĂ³n de ondas gravitacionales Gabriela Gonzalez Public Talk / Colloquium
27 Jun 2016
G1601395-v1 Gravitational wave detection with laser interferometers Koji Arai Public Talk / Colloquium
22 Jun 2016
G1601389-v1 Press Conference Remarks - GW151226 David Reitze Public Talk / Colloquium
21 Jun 2016
G1601357-v2 Gravitational Wave Astronomy with Advanced LIGO Brett Shapiro Public Talk / Colloquium
18 Jun 2016
G1601161-v3 Current status of the ground-based detectors Kiwamu Izumi et al. Public Talk / Colloquium
18 Jun 2016
G1601350-v1 MIT group photo David Shoemaker Public Talk / Colloquium
17 Jun 2016
D1001518-v7 Cable, Upper Ring Heater Segment Mindy Jacobson et al. Final Design
Vacuum
Auxiliary Optics
Fabrication
17 Jun 2016
G1601288-v4 GW151226 Infographic Daniel Williams Education, Outreach
15 Jun 2016
G1601325-v1 GW150914 Infographic Daniel Williams Education, Outreach
14 Jun 2016
P080073-v1 Requirements for a Ground Rotation Sensor to Improve Advanced LIGO Robert Schofield et al. Seismic Isolation
Basic R&D
Requirements
13 Jun 2016
G1601121-v1 LIGO - How to measure a gravitational wave Brian Lantz Public Talk / Colloquium
13 Jun 2016
G1601300-v2 Teacher Leadership Summit presentation on the detection of gravitational waves William Katzman Education, Outreach
08 Jun 2016
G1601281-v2 Thermal Noise and Thermal Compensation in aLIGO Alastair Heptonstall Public Talk / Colloquium
07 Jun 2016
G1601254-v2 Teaching gravitational waves: a lesson in heuristic (mis)understanding of how an interferometer detects gravitational waves Peter Saulson Public Talk / Colloquium
07 Jun 2016
T1400555-v1 How to Use Anti-Fog Cloths Sabrina Waller et al. System Engineering
Cleaning
07 Jun 2016
G1601273-v3 Poster: First Results from the Search for Binary Black Hole Coalescence with Advanced LIGO Steven Reyes et al. Compact Binaries
Public Talk / Colloquium
05 Jun 2016
D1300225-v2 Upper, Flashlight Holder Jeffrey Lewis Cleaning
03 Jun 2016
D1300224-v2 Base, Flashlight Holder Jeffrey Lewis Cleaning
03 Jun 2016
G1600966-v2 Opening the Gravitational Wave Window on the Universe Peter Saulson et al. Public Talk / Colloquium
02 Jun 2016
M1600168-v1 Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: Carl Adams et al. System Test
01 Jun 2016
G1601228-v1 colliding black holes, giant laser measurement systems, and ripples in the fabric of space-time Brian Lantz Education, Outreach
31 May 2016
G1600979-v3 Gravitational Waves - The Sound of Black Holes Colliding Brian Lantz Education, Outreach
27 May 2016
T1500120-v1 Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades Jeffrey Kissel et al. Upgrades
Seismic Isolation
Conceptual Design
Sensing and Control
Suspensions
Commissioning
Auxiliary Optics
System Engineering
Core Optics
26 May 2016
G1600916-v1 Colloquium Université de Montréal on GW150914 etc. David Shoemaker Detector
Public Talk / Colloquium
Data Analysis
24 May 2016
G1600842-v3 LIGO’s discovery of gravitational waves and observation of black holes David Shoemaker Public Talk / Colloquium
22 May 2016
G1601077-v2 The dawn of gravitational-wave astronomy Graham Woan Astrophysics / Multi-messenger
Education, Outreach
16 May 2016
G1601114-x0 GW150914 a quadruple whammy Angus Bell et al. Public Talk / Colloquium
16 May 2016
G1601091-v2 The first detection of gravitational waves with LIGO Philip Charlton Public Talk / Colloquium
15 May 2016
G1101114-v3 The LIGO Science Education Center and its partnership Joe Giaime et al. Education, Outreach
12 May 2016
G1600954-v1 Detection of Gravitational Waves Gabriela Gonzalez Public Talk / Colloquium
24 Apr 2016
G1600903-v3 The instruments behind gravitational wave detection Lee McCuller Public Talk / Colloquium
19 Apr 2016
P1600131-v1 Optomechanics for Gravitational Wave Detection --- from resonant bars to next generation laser interferometers David Blair et al. Detector
Activity
18 Apr 2016
G1600210-v1 P150914 Figure 2 LIGO Scientific Collaboration et al. Compact Binaries
Education, Outreach
29 Feb 2016
G1600204-v6 P150914 Figure 1 LIGO Scientific Collaboration et al. Education, Outreach
Compact Binaries
29 Feb 2016
G1600503-v1 Observation of Gravitational Waves Gabriela Gonzalez et al. Public Talk / Colloquium
14 Apr 2016
P1600127-x0 The instruments behind gravitational wave detection Lee McCuller Public Talk / Colloquium
14 Apr 2016
G1600895-v1 Opening the Gravitational Wave Window Gabriela Gonzalez Public Talk / Colloquium
13 Apr 2016
P1600122-v2 General relativity and the detection of gravitational waves by LIGO Hiro Yamamoto Education, Outreach
11 Apr 2016
G1600284-v3 Colloquium on the subject of Observation of Gravitational Waves from a Binary Black Hole Merger David Shoemaker Data Analysis
Public Talk / Colloquium
Detector
10 Apr 2016
G1501573-v1 The Search for Gravitational Waves with Advanced LIGO Daniel Sigg Public Talk / Colloquium
06 Apr 2016
G1600813-x0 Observation of gravitational waves Gabriela Gonzalez et al. Public Talk / Colloquium
01 Apr 2016
G1600793-v2 GW150914: Observation of gravitational waves from a binary black hole system Gabriela Gonzalez Public Talk / Colloquium
31 Mar 2016
P1600061-v1 Exploring Gravitational Waves in the Classroom Lynn Cominsky Education, Outreach
29 Mar 2016
P1600112-v1 Evaluating the efficacy of educational games in promoting interest and understanding of gravitational wave physics Jonathan Wheeler Thesis/Dissertation
28 Mar 2016
P1600111-v1 Parameterization of BayesWave for Analysis of Gravitational Waves Caused by Inspiraling Black Holes Isabel Stafford Thesis/Dissertation
GW Bursts
28 Mar 2016
T1000091-v2 Semiconductor Cleaning for In-vacuum Applications Rich Abbott et al. Assembly
Sensing and Control
22 Mar 2016
P1600107-v1 Observe! A gravitational wave detection board game Jameson Graef Rollins Education, Outreach
22 Mar 2016
G1600501-v5 Presentation on Discovery for TEDx Montreal March 2016 David Shoemaker Public Talk / Colloquium
21 Mar 2016
G1600721-v2 509 Salsa LIGO Tour Corey Gray Education, Outreach
19 Mar 2016
G1600265-v2 The Dawn of Gravitational Wave Astronomy John Whelan GW Bursts
Stochastic
Continuous Wave
Public Talk / Colloquium
Compact Binaries
Other data analysis
17 Mar 2016
G1600707-x0 Detection of Gravitational Waves with an Optical Interferometer at Quantum Limits CS Unnikrishnan Public Talk / Colloquium
17 Mar 2016
P1600100-v1 The Century Quest for Gravitational Waves David Blair et al. Education, Outreach
15 Mar 2016
G1600507-v1 The LIGO detection and opportunities for NASA in Gravitational Wave Astronomy Neil Cornish Education, Outreach
11 Mar 2016
E1000752-v5 Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) Margot Hennig et al. Suspensions
Installation
08 Mar 2016
G1600397-v1 GW150914: Beginning A New Era For LIGO & Gravitational Wave Astronomy Corey Gray Public Talk / Colloquium
Detector
Compact Binaries
Education, Outreach
03 Mar 2016
P1600070-v2 Double Bonanza at the LIGO Gravitational Wave Detectors CS Unnikrishnan Education, Outreach
03 Mar 2016
G0900456-v2 Listening to the Universe Stan Whitcomb et al. Education, Outreach
02 Mar 2016
G1600275-v1 LIGO's First Measurement of Gravitational Waves Tiffany Summerscales Education, Outreach
01 Mar 2016
G1600367-v1 P150914 Cover Figure for PRL LIGO Scientific Collaboration et al. Education, Outreach
29 Feb 2016
G1600209-v1 P150914 Figure 3 LIGO Scientific Collaboration et al. Education, Outreach
Detector
25 Feb 2016
G1600326-v1 Inside LIGO - Presented at CSIRO, Lindfield GariLynn Billingsley et al. Public Talk / Colloquium
22 Feb 2016
G1600270-v4 Observation of GW signal by advanced LIGO Hiro Yamamoto Public Talk / Colloquium
20 Feb 2016
G1600249-v3 advanced LIGO : present and future Hiro Yamamoto Public Talk / Colloquium
20 Feb 2016
G1600274-v1 American University Detection Talk Gregg Harry Education, Outreach
15 Feb 2016
P1500001-v1 [Thesis] Noise Cancellation for Gravitational Wave Detectors Jenne Driggers Detector
Thesis/Dissertation
14 Feb 2016
G1600225-v3 GW150914 size comparisons Chris North et al. Education, Outreach
12 Feb 2016
G1600263-v1 LIGO detects BBH Merger (video) Simon Barke Education, Outreach
12 Feb 2016
G1600262-v1 Searching for gravitational waves Gabriela Gonzalez et al. Detector
Public Talk / Colloquium
Collaboration
Data Analysis
11 Feb 2016
G1600258-v1 GW150914: Observation of Gravitational Waves from a Black Hole Binary Merger Michael Landry et al. Public Talk / Colloquium
Detector
Compact Binaries
Education, Outreach
11 Feb 2016
G1600201-v2 One Little Victory - Music Video for Detection Outreach Gregg Harry Education, Outreach
10 Feb 2016
L1400164-v2 Initial, Enhanced, and Advanced LIGO brief chronology David Shoemaker Detector
Upgrades
31 May 2015
P1600011-v4 Opinion/Editorial for release with Detection Announcement Gregg Harry et al. Education, Outreach
08 Feb 2016
G1501570-v2 Einstein's Messengers Movie Clips: H264 (MPEG-4 AVC) Dale Ingram Education, Outreach
04 Feb 2016
G1501572-v1 Einstein's Messengers Movie Clips: High Res (Prores 422) Dale Ingram Education, Outreach
04 Feb 2016
G1600194-v1 LIGO Roadmap Musing For Joint ET/LIGO future Meeting, February 2016 David Shoemaker Upgrades
Meeting
Detector
02 Feb 2016
T1400443-v3 Waves and Their Applications in Technologies for Information Transfer: Fourth Grade Dale Ingram Education, Outreach
31 Jan 2016
D0900439-v5 Faraday Isolator TFP Polarizer Plate Manuel Ruiz et al. Basic R&D
Auxiliary Optics
29 Jan 2016
G1501546-v3 aLIGO OFI Summary of the requirements, specifications, and test results Koji Arai System Test
Requirements
Installation
Fabrication
Auxiliary Optics
28 Jan 2016
G1401179-v3 Estimate of force coupling between charged optic face and optic cage Brian Lantz Core Optics
Basic R&D
Suspensions
Modelling
Seismic Isolation
25 Jan 2016
G1600165-v1 Next Generation STEM preparation through LIGO science education at Southern University Stephen C McGuire Education, Outreach
22 Jan 2016
T1000526-v3 HAM Auxiliary Suspensions Design Requirements Giacomo Ciani et al. Input Optics
Suspensions
Requirements
19 Jan 2016
T1600002-v1 Math Science Partnership Program External Evaluation Report Dale Ingram Education, Outreach
05 Jan 2016
G1501330-v2 The Search for Gravitational Waves with Advanced LIGO Tiffany Summerscales Public Talk / Colloquium
01 Jan 2016
G1501581-v1 Remember that time we decided to measure colliding super-dense stars with a laser, ripples in the fabric of space, tumbleweeds and an alligator? - public Aidan Brooks Public Talk / Colloquium
30 Dec 2015
P1500273-v1 [Thesis] Locking the Advanced LIGO Gravitational Wave Detector: with a focus on the Arm Length Stabilization Technique Alexa N Staley Thesis/Dissertation
Basic R&D
17 Dec 2015
G1501275-v2 Gravitational Wave Experiments Keita Kawabe et al. Public Talk / Colloquium
16 Dec 2015
G1501451-v2 Qualifying Exam: Calibration and control of second generation interferometric gravitational wave detectors using photon radiation pressure Darkhan Tuyenbayev Thesis/Dissertation
07 Dec 2015
T1500543-v1 Advanced LIGO 4-page Handout Dale Ingram Education, Outreach
24 Nov 2015
P1500114-v3 Testing The Strong Field Dynamics of General Relativity Using Compact Binary Systems Carl Fields et al. Management
Activity
Compact Binaries
22 Nov 2015
T1400590-v3 Waves and Their Applications in Technologies for Information Transfer: Middle School Dale Ingram Education, Outreach
18 Nov 2015
P1500233-v1 Interferometer Techniques for Gravitational-Wave Detection Andreas Freise et al. Modelling
Conceptual Design
Sensing and Control
Basic R&D
Education, Outreach
Auxiliary Optics
Input Optics
Core Optics
18 Nov 2015
L1500161-v1 Letter of Agreement Between LHO and Mid-Columbia STEM Education Collaboratory Dale Ingram Education, Outreach
16 Nov 2015
G1501377-v1 Photos from LLO control room of Neil deGrasse Tyson visit Matthew Heintze Education, Outreach
14 Nov 2015
E080035-v1 Specification: Mirror Blank Material, Adv. LIGO Beamsplitter (BS) Mirror GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
06 Nov 2015
G1300176-v1 The LIGO Vacuum Equipment and Beam Tubes: Retrospective and Prospective Michael Zucker Vacuum
Public Talk / Colloquium
LIGO-India
03 Nov 2015
T1500291-v6 The LSC White Paper on Education and Public Outreach 2015-2016 Joey Key et al. Education, Outreach
30 Oct 2015
G1501256-v1 aLIGO Design Considerations Guido Mueller Input Optics
Education, Outreach
29 Oct 2015
T1300690-v1 TwinCAT EPICS IOC Documentation Maggie Tse Sensing and Control
Commissioning
23 Oct 2015
G1501274-v4 Status of the Advanced LIGO Project Jameson Graef Rollins Public Talk / Colloquium
State Control and Monitoring
Data Acquisition System
Data and Computing
Computing/archiving
19 Oct 2015
T1400520-v3 Energy, Vibrations and Waves: Kindergarten and First Grade Dale Ingram Education, Outreach
16 Oct 2015
G1501281-x0 Evaluating the efficacy of Black Hole Pong and its successors in arousing interest and promoting understanding of graviational wave research Jonathan Wheeler Public Talk / Colloquium
14 Oct 2015
P1500072-v3 The impact of terrestrial noise on the detectability and reconstruction of gravitational wave signals from core-collapse supernovae Jess McIver Detector Characterization
Seismic Isolation
Data Analysis
GW Bursts
Thesis/Dissertation
30 Sep 2015
G1501234-v1 Input Optics David Tanner et al. Education, Outreach
Input Optics
28 Sep 2015
T1100518-v2 Hartmann sensor noise to displacement noise coupling in aLIGO Aidan Brooks Core Optics
Requirements
Final Design
22 Sep 2015
T000092-v4 Auxiliary Optics Support System Design Requirements Document, Vol. 1: Thermal Compensation System Michael Smith et al. Reviews
Auxiliary Optics
Requirements
22 Sep 2015
D1500263-v1 LLO Staging Building Bathroom Upgrade Floorplans Timothy Nelson Observatory Facilities
Upgrades
10 Sep 2015
G1501193-v1 UF-Presentation: aLIGO overview and the Pre-stabilized Laser system Guido Mueller Laser Systems
Education, Outreach
07 Sep 2015
E0900113-v3 Compensation Plate Electro Static Drive gold coating specification GariLynn Billingsley Core Optics
Final Design
02 Sep 2015
E0900112-v3 Compensation Plate Barrel gold coating specification GariLynn Billingsley Final Design
Core Optics
02 Sep 2015
D080116-v2 End Reaction Mass (ERM) Russell Jones Final Design
Suspensions
02 Sep 2015
T1200221-v5 aLIGO PEM System Upgrade Robert Schofield et al. Upgrades
18 Aug 2015
D0900502-v5 AdvLIGO Systems, BSC5-H2 Top Level Chamber Assembly Jose Eduardo Chavez Final Design
System Engineering
19 Oct 2009
D0900512-v11 aLIGO Systems, WBSC6-H2 Top Level Chamber Assembly Jose Eduardo Chavez et al. System Engineering
Final Design
03 Aug 2015
T060075-v1 HAM Seismic Isolation Requirements Peter Fritschel Seismic Isolation
Modelling
Requirements
Suspensions
02 Aug 2015
T1400515-v9 User Manual and MATLAB Code for Detecting Particles Sabrina Waller Cleaning
27 Jul 2015
G1400756-v1 Example GW lecture with interactives Joshua Smith et al. Education, Outreach
23 Jul 2015
G1500951-v1 Status of KAGRA Seiji Kawamura Public Talk / Colloquium
20 Jul 2015
G1500931-v1 Gravitational Wave Detection and the AU Optics Olympiad Gregg Harry Education, Outreach
15 Jul 2015
P1500119-x0 Bayesian Model Selection and Parameter Estimation for Gravitational Wave Signals from Binary Black Hole Coalescences Alexander Lombardi Data Analysis
Compact Binaries
Thesis/Dissertation
12 Jul 2015
G1500817-v1 Linear systems Koji Arai Education, Outreach
24 Jun 2015
G1500720-v2 Technical Progress-3IFO for NSF Review 2015 Jodi Fauver Reports
NSF
Activity
03 Jun 2015
G1500734-v1 Squeezing for Advanced LIGO Lisa Barsotti Public Talk / Colloquium
Basic R&D
12 Jun 2015
G1500764-v1 Undreamt by Einstein: Prospects and Challenges in Gravitational-Wave Astronomy B Sathyaprakash Public Talk / Colloquium
12 Jun 2015
G1500751-v3 Detecting Gravitational Waves Gabriela Gonzalez Public Talk / Colloquium
12 Jun 2015
G1500652-v2 LIGO/VIRGO earthquake studies and controls configurations Sebastien Biscans Sensing and Control
Activity
05 Jun 2015
G1500733-v1 Ponderomotive squeezing and opto-mechanics Thomas Corbitt et al. Basic R&D
Public Talk / Colloquium
02 Jun 2015
G1500732-v1 Output filtering Jan Harms Basic R&D
Public Talk / Colloquium
02 Jun 2015
G1500731-v1 Output Squeezing Giancarlo Cella Basic R&D
Public Talk / Colloquium
02 Jun 2015
G1500730-v1 White Light Cavity Ideas and General Sensitivity Limits Haixing Miao Public Talk / Colloquium
Basic R&D
02 Jun 2015
G1500728-v1 Intracavity squeezing Somiya Kentaro Basic R&D
Public Talk / Colloquium
02 Jun 2015
G1500727-v1 Frequency dependent squeezing: roadmap toward 10 dB Tomoki Isogai Basic R&D
Public Talk / Colloquium
02 Jun 2015
G1500726-v1 Advanced Virgo short term upgrades Matteo Barsuglia et al. Upgrades
Detector
02 Jun 2015
G1500725-v1 Topologies and Squeezing Workshop @ GWADW2015 Lisa Barsotti et al. Public Talk / Colloquium
02 Jun 2015
G1500454-v1 Controls Workshop at the GWADW 2015 Dennis Coyne et al. Public Talk / Colloquium
Detector
01 Jun 2015
G1500668-v1 Squeezing now and in the future: the road to 10 dB Katherine Dooley et al. Integration
Basic R&D
Requirements
Commissioning
Squeezer
Sensing and Control
Meeting
01 Jun 2015
G1500709-v3 Gravitational Waves: Einstein's astrophysical messengers Gabriela Gonzalez Public Talk / Colloquium
30 May 2015
T080194-v1 Dynamic Vibration Absorber Dennis Coyne System Engineering
Basic R&D
28 May 2015
G1500712-v1 Topologies and squeezing workshop summary Hartmut Grote et al. Basic R&D
Upgrades
28 May 2015
P1500065-v4 Phase-coherent mapping of gravitational-wave backgrounds using ground-based laser interferometers Joseph Romano et al. Stochastic
Activity
27 May 2015
G1500693-v1 aLIGO Control System - Pros and Cons Rolf Bork Data Acquisition System
Public Talk / Colloquium
20 May 2015
G1500655-v3 Einstein’s GR @ 100: LIGO-enabled Science Gabriela Gonzalez Public Talk / Colloquium
18 May 2015
G1500654-v2 Experimental highlights and challenges in Advanced LIGO Kiwamu Izumi et al. Public Talk / Colloquium
16 May 2015
G1500608-v3 What's next for LIGO? Gabriela Gonzalez Public Talk / Colloquium
07 May 2015
G1500518-v2 Status of Advanced Detectors Gabriela Gonzalez et al. Public Talk / Colloquium
23 Apr 2015
G1500024-v2 Gravitational Wave Detection: A Historical Perspective Peter Saulson Public Talk / Colloquium
22 Apr 2015
G1500426-v2 Listening in on Black Holes: What Advanced LIGO is about to hear Peter Saulson Public Talk / Colloquium
22 Apr 2015
G1400110-v1 Coming soon: Advanced LIGO Marco Cavaglia et al. Public Talk / Colloquium
21 Apr 2015
E1200914-v130 aLIGO AOS SLC and TMS Inventory Lisa Austin et al. Assembly
Installation
Cleaning
Auxiliary Optics
17 Apr 2015
G1500041-v5 The LIGO Scientific Collaboration Gabriela Gonzalez et al. Public Talk / Colloquium
13 Apr 2015
G1500472-v4 LIGO and the network of terrestrial gravitational wave detectors David Shoemaker Data Analysis
Public Talk / Colloquium
Detector
13 Apr 2015
T1400474-v2 LIGO SURF Progress Report 1: Particle Imaging and Analysis for Advanced LIGO Sabrina Waller Cleaning
Risk Management
10 Apr 2015
T1400506-v2 LIGO SURF Progress Report 2: Particle Imaging and Analysis for Advanced LIGO Sabrina Waller Cleaning
10 Apr 2015
T1400467-v1 Test of Nikon D7100's Particle Resolution Capabilites Sabrina Waller Risk Management
Cleaning
10 Apr 2015
T1400491-v1 Test of Nikon D7100 with 2x Teleconverter's Particle Resolution Capabilites Sabrina Waller Cleaning
Risk Management
10 Apr 2015
T1400494-v1 Comparison of MATLAB's and Toupview's Abilities to Measure Particles in Images Sabrina Waller Risk Management
Cleaning
10 Apr 2015
G1400866-v3 Presentation of Process for Imaging and Measuring Particulates using Nikon D7100 and Matlab Sabrina Waller Cleaning
10 Apr 2015
E1000722-x0 PSL Testing: High-Power-Laser (HPL) Benno Willke System Test
Laser Systems
08 Apr 2015
T0900301-v1 PSI Actuator Test Plan Fabrice Matichard System Test
03 Apr 2015
G1500158-v1 An overview of gravitational waves and Advanced LIGO Aidan Brooks Detector
Public Talk / Colloquium
01 Apr 2015
E990303-v1 Seismic Isolation Subsystem Design Requirements Document Dennis Coyne et al. Conceptual Design
Seismic Isolation
Modelling
Requirements
31 Mar 2015
G1500419-v2 Advanced LIGO : Aiming for the detection of the gravitational wave signal, and beyond Hiro Yamamoto Public Talk / Colloquium
27 Mar 2015
T1000216-v1 Revised HAM-ISI Performance Targets for Advanced LIGO SRM Chambers Brian Lantz Suspensions
Requirements
Seismic Isolation
Sensing and Control
25 Mar 2015
P1300051-v1 [Thesis] Optical Read-out Techniques for the Control of Test-masses in Gravitational Wave Observatories Stuart Aston Thesis/Dissertation
Suspensions
23 Mar 2015
D1001459-v13 ISC End Station Remote Rack Layout Rich Abbott et al. Conceptual Design
Sensing and Control
19 Mar 2015
T1100291-v2 aLIGO ISC Whitening Chassis Test Procedure Rich Abbott et al. Sensing and Control
System Test
16 Mar 2015
T1300354-v3 Scattered light noise due to the ETM coating ripple Peter Fritschel et al. System Engineering
Modelling
11 Mar 2015
T1200295-v2 LMA coating on ITM04 and ITM08 Hiro Yamamoto Core Optics
Modelling
11 Mar 2015
G1500216-v1 pnp test G doc 3/11/15 #2 Nichole Washington Temporary Test Document
11 Mar 2015
P1500045-v1 pnp test P doc 3/11/15 Nichole Washington Temporary Test Document
11 Mar 2015
P1500044-v1 pnp test doc 3/11/15 Nichole Washington Temporary Test Document
11 Mar 2015
G1100466-v2 LMA Coating non uniformity on aLIGO optics Hiro Yamamoto Core Optics
Modelling
11 Mar 2015
G1500212-v1 pnp G test doc 3/11/15 Nichole Washington Temporary Test Document
11 Mar 2015
G1500170-v2 Current status of advanced LIGO Kiwamu Izumi et al. Public Talk / Colloquium
11 Mar 2015
E0900426-v5 HEPI Kaman Sensor Receiving Analysis Hugh Radkins et al. Seismic Isolation
Incoming Inspection
10 Mar 2015
E1101087-v3 aLIGO OMC Mounting Prisms Sam Waldman et al. Sensing and Control
Requirements
08 Mar 2015
M1100192-v1 RODA: Accuracy of height of mirrors in HSTS and HLTS Guido Mueller Requirements
Suspensions
08 Mar 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel System Test
Integration
Commissioning
Requirements
Subsystem Test
Suspensions
Assembly
Installation
08 Mar 2015
T0900095-v2 Adv. LIGO Arm Length Stabilisation Requirements - OBSOLETE Bram Slagmolen Sensing and Control
Requirements
Basic R&D
03 Mar 2015
G1500157-v1 LIGO and Gravitational Wave Detection Workshop - National Society of Black Physicists Gregg Harry Public Talk / Colloquium
25 Feb 2015
P1300043-v1 [Thesis] Control of Differential Motion Between Adjacent Advanced LIGO Seismic Isolation Platforms Daniel Clark Thesis/Dissertation
20 Feb 2015
T1100570-v5 Thermal Compensation System (TCS): CO2 Laser Projection System (CO2P) Final Design Document Aidan Brooks et al. Final Design
Requirements
Vacuum
Auxiliary Optics
12 Feb 2015
P1500026-v1 Plans for a Large Gravitational Wave Antenna in Germany. August 1985 Walter Winkler et al. Reports
Detector
Public Talk / Colloquium
11 Feb 2015
T1100044-v19 Advanced LIGO Photon Calibrator Design Requirements Jonathan Berliner et al. Basic R&D
Requirements
Input Optics
Auxiliary Optics
Vacuum
Calibration
System Engineering
Upgrades
Detector Characterization
Laser Systems
05 Feb 2015
T1500043-x0 Mirror Profiles and Arm cavity loss Hiro Yamamoto Modelling
Core Optics
03 Feb 2015
E0900074-v3 Advanced LIGO Compensation Plate (CP) Coating Specification Rand Dannenberg Core Optics
Final Design
02 Feb 2015
D1001615-v2 aLIGO, BSC INSTALLATION ARM, FLANGE BRACE Scott Shankle Auxiliary Optics
Conceptual Design
28 Jan 2015
P1500016-v1 Jumping in to research - the LIGO perspective Jess McIver Education, Outreach
27 Jan 2015
P1400113-v2 LIGO Magazine issue 5 9/2014 Andreas Freise Education, Outreach
27 Jan 2015
D1001423-v19 ISC End Station Field Rack Layout Rich Abbott et al. Sensing and Control
Final Design
23 Jan 2015
T1500016-v2 Design overview for the new test mass electro-static driver Peter Fritschel et al. Requirements
Suspensions
Sensing and Control
23 Jan 2015
T1400717-v5 Profiles of ETM11 and ETM14, latest ETM coating by LMA Hiro Yamamoto Modelling
Core Optics
22 Jan 2015
P1500011-v1 Mechanical losses of oscillators fabricated in silicon wafers Leonid Prokhorov et al. Conceptual Design
Upgrades
22 Jan 2015
T1500001-v2 Noise requirement for the test mass electro-static driver Peter Fritschel Requirements
Suspensions
Sensing and Control
20 Jan 2015
D1001797-v2 aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout Dennis Coyne Installation
14 Jan 2015
G1401169-v1 LIGO Science Education Center: Building an Informal Education Center on Collaborations Amber Stuver Education, Outreach
13 Jan 2015
G1500034-x0 A cross-correlation search for intermediate-duration gravitational waves from GRB magnetars Robert Coyne et al. Public Talk / Colloquium
GW Bursts
09 Jan 2015
G1500033-x0 LIGO and the network of terrestrial gravitational wave detectors David Shoemaker Public Talk / Colloquium
08 Jan 2015
T1400766-v1 Build and Use a SImple Spectroscope Dale Ingram Education, Outreach
19 Dec 2014
T1400765-v1 Swing into the Scientific Method Dale Ingram Education, Outreach
19 Dec 2014
T1400764-v1 Powers of Two Dale Ingram Education, Outreach
19 Dec 2014
T1400763-v1 LIGO Star Chart Dale Ingram Education, Outreach
19 Dec 2014
T1400762-v1 Build Your Own Michelson Interferometer Dale Ingram Education, Outreach
19 Dec 2014
D1002563-v2 SLC DAMPING 8 DIA TUBE ASSY Niem Nguyen Auxiliary Optics
Modelling
18 Dec 2014
G1401401-v1 What Advanced LIGO is about to see Peter Saulson Public Talk / Colloquium
18 Dec 2014
G1401380-v1 Control system: modeling Koji Arai Meeting
Education, Outreach
16 Dec 2014
G1401146-v2 Control system in Gravitational Wave Detectors Koji Arai et al. Meeting
Education, Outreach
16 Dec 2014
G1401147-v2 Quantum noise in Gravitational Wave Detectors Koji Arai et al. Meeting
Education, Outreach
16 Dec 2014
G1401145-v2 Noises in Gravitational Wave Detectors Koji Arai et al. Education, Outreach
Meeting
16 Dec 2014
G1401144-v2 Interferometer configurations for Gravitational Wave Detectors Koji Arai et al. Education, Outreach
Meeting
16 Dec 2014
G1401365-v1 LIGO-India Detector Master Class Introduction Koji Arai Education, Outreach
Meeting
16 Dec 2014
G1401386-v1 Interferometer Length Sensing in Gravitational Wave Detectors Koji Arai Meeting
Education, Outreach
16 Dec 2014
G1401391-v1 Higher order laser modes in gravitational wave detectors Koji Arai Meeting
Education, Outreach
16 Dec 2014
P1400223-v10 Ph.D. Thesis: The needle in the hundred square degree haystack / The hunt for binary neutron star mergers with LIGO and Palomar Transient Factory Leo Singer Astrophysics / Multi-messenger
Data analysis software
External Collaboration
Compact Binaries
Thesis/Dissertation
15 Dec 2014
D0900442-v7 aLIGO Systems, BSC1-L1 Top Level Chamber Assembly Ignacio Romero et al. Final Design
System Engineering
10 Dec 2014
G1401205-v3 Noise Analysis of OSEM Actuator to Sensor Coupling Brett Shapiro Modelling
03 Dec 2014
T0900495-v4 HAM Auxiliary Suspensions Electronics Requirements Giacomo Ciani et al. Input Optics
Suspensions
Requirements
03 Dec 2014
P1400249-v1 What Advanced LIGO is about to see Peter Saulson Public Talk / Colloquium
02 Dec 2014
G1401350-v4 Parts of the path to today’s Interferometric Gravitational-Wave detectors David Shoemaker Public Talk / Colloquium
Detector
01 Dec 2014
T1300433-v3 Instrument Science White Paper Rana Adhikari et al. Auxiliary Optics
Input Optics
System Engineering
Core Optics
Suspensions
Basic R&D
Detector
Laser Systems
Sensing and Control
Upgrades
Seismic Isolation
01 Dec 2014
G1401342-v1 History and status of LIGO - Laser Interferometer Gravitational Wave Observatory Hiro Yamamoto Public Talk / Colloquium
27 Nov 2014
G1401339-v1 Advanced LIGO status - with introduction to interferometer Hiro Yamamoto Public Talk / Colloquium
25 Nov 2014
G1401340-v1 simulation study for the hopping issue in LHO DRMI Kiwamu Izumi Modelling
21 Nov 2014
G1401313-v1 Interferometry and Optics in Advanced LIGO David Shoemaker Public Talk / Colloquium
Detector
19 Nov 2014
T1400721-v1 The LSC White Paper on Education and Public Outreach 2014-2015 - Public Document Szabolcs Marka et al. Education, Outreach
17 Nov 2014
G1401161-v4 Gravitational Waves: Celestial Soundtrack Sergei Klimenko et al. Astrophysics / Multi-messenger
Public Talk / Colloquium
14 Nov 2014
G1100905-v1 What's Up with LIGO Fred Raab et al. Education, Outreach
10 Nov 2014
T1400622-v2 Dynamics and Electromagnetic Wave Signatures of Magnetized Neutron Stars near Black Holes Farzan Vafa et al. Modelling
10 Nov 2014
T1400650-v1 Implementing Frequency Offset Locking of the Auxiliary lasers in the 40m Prototype Arm Length Stabilization System Andrew Hall et al. Auxiliary Optics
Upgrades
08 Nov 2014
P1400197-v1 Modeling of Optical Scattering in Advanced LIGO Hunter Rew et al. Modelling
Detector Characterization
Auxiliary Optics
Calibration
03 Nov 2014
T1400658-v1 Summary of LIGO SEC Impact on Graduate Students William Katzman Education, Outreach
28 Oct 2014
G1401261-v1 A Multi-Partner Summer STEM Career Academy for High School Seniors Dale Ingram Education, Outreach
28 Oct 2014
T1400688-v1 LIGO-SEC Summative Evaluation 2008 William Katzman Education, Outreach
27 Oct 2014
T1400672-x0 Report from the Commissioning Workshop on Suspensions at Virgo Jeffrey Kissel et al. Basic R&D
Suspensions
Installation
Commissioning
Integration
Meeting
Modelling
Seismic Isolation
21 Oct 2014
L1400083-v1 LIGO SEC II Site visit memo Dec 2012 William Katzman Education, Outreach
18 Oct 2014
Q1400004-v1 LIGO SEC II External Evaluation Report, Inverness Research Oct. 2011 William Katzman Education, Outreach
16 Oct 2014
T1400659-v1 Hyunju Lee Research Report Draft 2014 William Katzman Education, Outreach
14 Oct 2014
G1401232-v1 Students' attitudes and Understandings about Science in their Field Trip to LIGO poster William Katzman Education, Outreach
14 Oct 2014
G1401196-v1 Gravitational Waves: On the Brink of a New Astronomy Tiffany Summerscales Public Talk / Colloquium
07 Oct 2014
G1401182-v3 LIGO and its Scientific Collaboration Gabriela Gonzalez et al. Public Talk / Colloquium
03 Oct 2014
T1400627-v1 Direct signature of the large angle scattering by the spiral pattern in LMA coating Hiro Yamamoto et al. Core Optics
Operations
Modelling
29 Sep 2014
P1400195-v1 Education and Public Outreach on Gravitational-Wave Astronomy Martin Hendry et al. Public Talk / Colloquium
26 Sep 2014
P1400194-v2 Summary of session C6: Q&A - Everything you wanted to know about Gravitational Waves but were afraid to ask Viviana Fafone et al. Public Talk / Colloquium
26 Sep 2014
P1400189-v1 Correlated Noise in LIGO Detectors from Schumann Resonance Ryan Horton et al. Project Controls
Calibration
Education, Outreach
25 Sep 2014
G1401160-v1 Toward Quantum Opto-Mechanics in a Gram-Scale Suspended Mirror Interferometer Christopher Wipf Thesis/Dissertation
Public Talk / Colloquium
24 Sep 2014
T1300130-v3 Longitudinal-to-Angle Coupling in Optical Levers Thomas Vo et al. Auxiliary Optics
Modelling
23 Sep 2014
T1400612-v1 LMA coating effect on HOM in aLIGO arm Hiro Yamamoto Core Optics
Modelling
21 Sep 2014
T1400603-v2 ITM transmission map and contrast defect Hiro Yamamoto Modelling
Core Optics
16 Sep 2014
G1401121-v1 Advanced LIGO talk for SPRC meeting Brian Lantz Education, Outreach
16 Sep 2014
E1000304-v3 aLIGO SEI Testing and Commissioning Documentation Fabrice Matichard et al. Subsystem Test
Seismic Isolation
16 Sep 2014
G1401117-v1 H1 and model by FFT+COC Hiro Yamamoto Modelling
Core Optics
12 Sep 2014
T1300926-v2 HLTS Violin Mode Q Mark Barton Suspensions
Subsystem Test
Modelling
09 Sep 2014
T1200418-v4 LLO MC2 Violin Mode Q Mark Barton et al. Modelling
Integration
Suspensions
Subsystem Test
09 Sep 2014
G1300869-v1 Dynamics and Gravitational Wave SIgnatures of Charged Black Hole Binaries SURF Summer Seminar Day Presentation Zachary Mark et al. Modelling
Public Talk / Colloquium
09 Sep 2014
P1000018-v1 [Thesis] Length Sensing and Control of an Advanced Prototype Interferometric Gravitational Wave Detector Robert Ward Stochastic
System Test
Sensing and Control
09 Sep 2014
E1200326-v2 First Contact cleaning of water spots or water soluble contamination GariLynn Billingsley et al. Cleaning
Core Optics
04 Sep 2014
D1300223-v3 Flashlight Holder Assembly (Flashlight Array) Jeffrey Lewis Cleaning
03 Sep 2014
T1400532-v1 SURF 2014 LIGO Livingston Observatory Trip and SURF Summer Seminar Days Alan Weinstein Education, Outreach
Detector
Data Analysis
31 Aug 2014
G1400834-v4 Kalman filter SURF presentation Reetika Dudi Modelling
31 Aug 2014
G1400934-v1 Numerical Simulations of Superkick Binary Black Holes Lydia Nevin Modelling
Compact Binaries
31 Aug 2014
G1400913-v1 Optimization of Michelson Interferometer Signals in Crackle Noise Detection Horng Chia et al. Public Talk / Colloquium
31 Aug 2014
G1400962-v2 LSC Political Outreach Gregg Harry Education, Outreach
29 Aug 2014
G1400944-v2 Optical Simulation vs reality at LLO Hiro Yamamoto Modelling
Core Optics
25 Aug 2014
G1400970-v2 Student/Postdoc Retreat Welcome Tobin Fricke Education, Outreach
24 Aug 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel System Test
Integration
Assembly
Suspensions
Subsystem Test
Installation
Requirements
Commissioning
22 Aug 2014
Q1300010-v1 dcc Release 3.1.0 test doc Cleveland Mak et al. Upgrades
Temporary Test Document
System Test
22 Aug 2014
G1400899-v1 Frequency Offset Locking Andrew Hall et al. Upgrades
Auxiliary Optics
21 Aug 2014
T050036-v4 Pre-Stabilized Laser Design Requirements Richard Savage et al. Laser Systems
Requirements
20 Aug 2014
T1200149-v1 Cleaning Procedure for Optics Lens Caps Calum Torrie et al. Cleaning
19 Aug 2014
P1100133-v3 Searching for Gravitational Waves from Compact Binary Coalescence using LIGO and Virgo Data Collin Capano Thesis/Dissertation
Compact Binaries
15 Aug 2014
E1300846-v1 aLIGO Tip-Tilt (HTTS) Suspension Blade calculations Bram Slagmolen Modelling
Sensing and Control
12 Aug 2014
G1400721-v3 Second Generation Gravitational-Wave Observatories Chris Pankow Public Talk / Colloquium
Data Analysis
Astrophysics / Multi-messenger
07 Aug 2014
T1400495-x0 Effects of the figure structure by aLIGO ETM coating Hiro Yamamoto Modelling
Core Optics
31 Jul 2014
G1400760-v1 Constructing Paper Spacetimes Jocelyn Read Public Talk / Colloquium
10 Jul 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. System Engineering
Integration
Installation
Suspensions
System Test
Data Acquisition System
Seismic Isolation
Final Design
10 Jul 2014
D000406-x0 Staging Building for Livingston, Issued for Construction - Second Level Floor Plan, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000306-x0 Staging Building for Livingston Observatory - Panels John Desmond Document Migration
09 Jul 2014
D000305-x0 Staging Building for Livingston Observatory - Details John Desmond Document Migration
09 Jul 2014
D000304-x0 Staging Building for Livingston Observatory - Electrical John Desmond Document Migration
09 Jul 2014
D000303-x0 Staging Building for Livingston Observatory - Lighting John Desmond Document Migration
09 Jul 2014
D000302-x0 Staging Building for Livingston Observatory - Electrical John Desmond Document Migration
09 Jul 2014
D000301-x0 Staging Building for Livingston Observatory - Lighting John Desmond Document Migration
09 Jul 2014
D000300-x0 Staging Building for Livingston Observatory - Site John Desmond Document Migration
09 Jul 2014
D000299-x0 Staging Building for Livingston Observatory - Plumbing Riser Diagram and Details John Desmond Document Migration
09 Jul 2014
D000298-x0 Staging Building for Livingston Observatory - Second Level Floor Plan John Desmond Document Migration
09 Jul 2014
D000297-x0 Staging Building for Livingston Observatory - First Floor Plan John Desmond Document Migration
09 Jul 2014
D000296-x0 Staging Building for Livingston Observatory - Schedules and Details John Desmond Document Migration
09 Jul 2014
D000295-x0 Staging Building for Livingston Observatory - Second Level Floor Plan John Desmond Document Migration
09 Jul 2014
D000294-x0 Staging Building for Livingston Observatory - First Floor Plan John Desmond Document Migration
09 Jul 2014
D000293-x0 Staging Building for Livingston Observatory - Details, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000292-x0 Staging Building for Livingston Observatory - Details, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000291-x0 Staging Building for Livingston Observatory - Roof Framing Plan, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000289-x0 Staging Building for Livingston Observatory - Slab, Column Plan, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000288-x0 Staging Building for Livingston Observatory - Grade Beam, Shafts Plan, Rev. 01 John Desmond Document Migration
09 Jul 2014
D000287-x0 Staging Building for Livingston Observatory - Second Floor Reflected Ceiling Plan John Desmond Document Migration
09 Jul 2014
D000286-x0 Staging Building for Livingston Observatory - First Floor Reflected Ceiling Plan John Desmond Document Migration
09 Jul 2014
D000285-x0 Staging Building for Livingston Observatory - Stair Sections, Details John Desmond Document Migration
09 Jul 2014
D000284-x0 Staging Building for Livingston Observatory - Stair Plans, Sections John Desmond Document Migration
09 Jul 2014
D000283-x0 Staging Building for Livingston Observatory - Interior Elevations, Detail John Desmond Document Migration
09 Jul 2014
D000282-x0 Staging Building for Livingston Observatory - Partial Floor Plans John Desmond Document Migration
09 Jul 2014
D000281-x0 Staging Building for Livingston Observatory - Wall Sections, Details John Desmond Document Migration
09 Jul 2014
D000280-x0 Staging Building for Livingston Observatory - Building Sections, Details John Desmond Document Migration
09 Jul 2014
D000279-x0 Staging Building for Livingston Observatory - Building Section, Details John Desmond Document Migration
09 Jul 2014
D000278-x0 Staging Building for Livingston Observatory - Building Section, Details John Desmond Document Migration
09 Jul 2014
D000277-x0 Staging Building for Livingston Observatory - Door Schedule John Desmond Document Migration
09 Jul 2014
D000276-x0 Staging Building for Livingston Observatory - Exterior Elevations, Finish Schedule John Desmond Document Migration
09 Jul 2014
D000275-x0 Staging Building for Livingston Observatory - Exterior Elevations John Desmond Document Migration
09 Jul 2014
D000274-x0 Staging Building for Livingston Observatory - Second Level Floor Plan John Desmond Document Migration
09 Jul 2014
D000273-x0 Staging Building for Livingston Observatory - First Floor Plan John Desmond Document Migration
09 Jul 2014
D000272-x0 Staging Building for Livingston Observatory - Handicapped Standard Details John Desmond Document Migration
09 Jul 2014
D000271-x0 Staging Building for Livingston Observatory - Existing Site and Building Demolision John Desmond Document Migration
09 Jul 2014
D000270-x0 Staging Building for Livingston Observatory - Site Plans and Details John Desmond Document Migration
09 Jul 2014
D000269-x0 Staging Building for Livingston Observatory - Title Sheet and General Notes, Rev. 01 John Desmond Document Migration
09 Jul 2014
G1400749-v1 Gravitational Wave Detection with Initial and Advanced LIGO Gregg Harry Public Talk / Colloquium
08 Jul 2014
T1400448-v1 Single Pendulum Parameter Descriptions and Naming Conventions Jeffrey Kissel et al. Modelling
Suspensions
07 Jul 2014
D1101941-v2 ETM HWS EtherCAT breakout box Aidan Brooks et al. Incoming Inspection
Auxiliary Optics
25 Jun 2014
G1400715-v1 Joe Weber and the "original sin" of gravitational wave detection Peter Saulson Public Talk / Colloquium
25 Jun 2014
P040032-x0 Sensitivity and Noise Analysis of 4 km Laser Interferometric Gravitational Wave Antennae Rana Adhikari Thesis/Dissertation
Detector
21 Jun 2014
E1300763-v2 ECR - RCG Code Change Request - RCG Version 2.8 Rolf Bork Upgrades
Data Acquisition System
19 Jun 2014
E1300534-v1 ECR - CDS Code Release RCG V2.7 Rolf Bork Change Control
Data Acquisition System
Upgrades
19 Jun 2014
E1201027-v1 ECR: Replacement of the coil-series resistors in the HAM-A coil drivers David Feldbaum Upgrades
Final Design
Sensing and Control
Requirements
Suspensions
Commissioning
Input Optics
19 Jun 2014
E1300671-v1 ECR - RCG Code Change Request - RCG Version 2.7.2 Rolf Bork Upgrades
Data Acquisition System
19 Jun 2014
E1200930-v2 ECR, End Station EtherCAT Chassis Modification for TCS Aidan Brooks et al. Data Acquisition System
Installation
Requirements
Auxiliary Optics
Integration
19 Jun 2014
E1300789-v2 ECR for 135MHz signal chain (REFLAIR-B on ISCT6) Rich Abbott Sensing and Control
System Test
19 Jun 2014
E1300788-v1 ECR: add baffle to PR3 Suspensions to prevent wire heating Dennis Coyne Auxiliary Optics
Suspensions
System Test
Change Control
19 Jun 2014
E1100991-x0 aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) Fabrice Matichard System Test
Seismic Isolation
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Seismic Isolation
Requirements
Subsystem Test
Assembly
18 Jun 2014
F0900070-v6 GS-13 Inspection Checklist Joe Hanson et al. Installation
Subsystem Test
Incoming Inspection
Seismic Isolation
18 Jun 2014
T0900564-v2 aLIGO Large Actuator Test Results from Qinetiq Brian O'Reilly Incoming Inspection
Seismic Isolation
18 Jun 2014
T1300507-v1 aLIGO L1 DRMI Test Noise Budget Anamaria Effler et al. Modelling
Sensing and Control
18 Jun 2014
G1400667-v2 Opening the Gravitational Wave Window Gabriela Gonzalez et al. Detector
Data Analysis
Public Talk / Colloquium
18 Jun 2014
G1400671-v1 DAQ Acceptance Testing Rolf Bork Data Acquisition System
System Test
16 Jun 2014
T1400403-v1 Scatter measurement of small aLIGO Lenses GariLynn Billingsley et al. Input Optics
System Test
13 Jun 2014
G1400629-v2 Overview of Mathematica and Matlab suspension modeling assets Mark Barton Modelling
Suspensions
11 Jun 2014
P1300001-v1 [Thesis] Multi-Color Interferometry for Lock Acquisition of Laser Interferometric Gravitational-wave Detectors Kiwamu Izumi et al. Thesis/Dissertation
Commissioning
10 Jun 2014
G1400580-v1 Finesse 2: Radiation pressure and the quantum kat Daniel Brown et al. Modelling
05 Jun 2014
T1400185-x0 aLIGO Resonances Mark Barton Modelling
Subsystem Test
03 Jun 2014
D080660-v3 D080660_ALIGO COC_BS_SUBSTRATE Calum Torrie Core Optics
Final Design
03 Jun 2014
D0902346-v3 AdLIGO IQ Demodulator Cell Rich Abbott Basic R&D
Sensing and Control
03 Jun 2014
G1400602-v1 Advanced LIGO Slide Show, assembled May 2014 David Shoemaker Detector
Education, Outreach
31 May 2014
D0902796-v4 Quad IQ Demodulator Chassis Rich Abbott et al. Fabrication
30 May 2014
T080214-v1 Simple Calculations for Charge Noise for Advanced LIGO Brian Lantz Seismic Isolation
Core Optics
Suspensions
Basic R&D
Requirements
27 May 2014
G1400560-v2 Simulation Study for aLIGO lock acquisition Kiwamu Izumi et al. Modelling
Integration
24 May 2014
G1400572-v1 A modular FFT-based Interferometer Simulation Package Hiro Yamamoto Core Optics
Modelling
22 May 2014
E1000338-v4 Vibration Absorber : Final Design Review Sebastien Biscans et al. Basic R&D
Suspensions
20 May 2014
T010007-v5 Cavity Optics Suspension Subsystem Design Requirements Mark Barton et al. Requirements
Suspensions
17 May 2014
G1400537-v1 ESD Force Noise and Range for Various Modes of Operation Brett Shapiro Modelling
14 May 2014
D020254-x0 BASE INSULATOR, EM ACTUATOR ASSEMBLY Ken Mason Document Migration
07 May 2014
D020078-x0 ETMX Table Cover, 40M Lab Larry Jones Document Migration
07 May 2014
D020055-x0 Reservior Tank Nut Plate Ken Mailand Document Migration
07 May 2014
D000225-x0 Electro-Optic Modulator (EOM) Spacer Nathan Hindman et al. Document Migration
07 May 2014
D000107-x0 LIGO Staging Building, Livingston - Building Elevation, Section John Desmond Document Migration
07 May 2014
D000106-x0 LIGO Staging Building, Livingston - Second Level John Desmond Document Migration
07 May 2014
D000105-x0 LIGO Staging Building, Livingston - Schematic Design John Desmond Document Migration
07 May 2014
D000055-x0 LLO ETMY Telescope BSC5 Ken Mailand Document Migration
07 May 2014
D000002-x0 Z Pivot Shim, Rev. A Larry Jones Document Migration
07 May 2014
G1400511-v1 LIGO Status Report Gregg Harry Public Talk / Colloquium
06 May 2014
D060416-v4 Magnet and Flag Assembly Derek Bridges et al. Suspensions
Preliminary Design
05 May 2014
T1400298-v1 Simulation study for aLIGO lock acquisition Kiwamu Izumi et al. Meeting
Modelling
Commissioning
Integration
03 May 2014
G1400495-v1 ALS Noise Budget and Model Status Report Alexa N Staley Modelling
02 May 2014
G1400447-v1 ALS HIFO-X Noise Budget and Model Status Report Alexa N Staley Modelling
23 Apr 2014
T1400293-x0 Suspension Alignment Offsets and Gains Mark Barton et al. Suspensions
Modelling
21 Apr 2014
G1400443-v1 Status update of aLIGO lock acquisition simulation (20140411) Kiwamu Izumi Meeting
Modelling
11 Apr 2014
E1400193-x0 aLIGO, ISC, lock acquisition Kiwamu Izumi Modelling
11 Apr 2014
G1400385-v3 Cryogenic behavior of LEDs for use in third generation LIGO position sensors and actuators Ryan Goetz Public Talk / Colloquium
Sensing and Control
08 Apr 2014
T1200031-v3 LIGO III Strawman Design Workshop Report Rana Adhikari et al. Upgrades
Conceptual Design
Basic R&D
Detector
07 Apr 2014
G1400419-v1 Status update of aLIGO lock acquisition simulation (20140404) Kiwamu Izumi Meeting
Modelling
04 Apr 2014
G1400418-v1 Gravitational Waves, Inflation, and the Big Bang: BICEP-2 Result and LIGO Gregg Harry Public Talk / Colloquium
04 Apr 2014
G1400162-v4 Core Optics related loss hierarchy of aLIGO Hiro Yamamoto Modelling
Core Optics
03 Apr 2014
D0902505-v9 Fiber Guard Assembly (Installation Instructions) Marielle van Veggel et al. Preliminary Design
Suspensions
02 Apr 2014
D1101879-v1 QPD storage cage Koji Arai Cleaning
Input Optics
Assembly
Installation
Sensing and Control
01 Apr 2014
T0900485-v3 FET vs. Diode-ring Demodulator Noise Comparison Rich Abbott Sensing and Control
Basic R&D
27 Mar 2014
P1000010-v1 [Thesis] Homodyne detection for laser-interferometric gravitational wave detectors Tobin Fricke Detector
Thesis/Dissertation
25 Mar 2014
P1100125-v1 [Thesis] Design and Performance of High Laser Power Interferometers for Gravitational-wave Detection Katherine Dooley Basic R&D
Input Optics
Thesis/Dissertation
Sensing and Control
25 Mar 2014
G1400379-v1 Status update of aLIGO lock acquisition simulation (20140321) Kiwamu Izumi Modelling
21 Mar 2014
D1000658-v5 TCS Hartmann Sensor Plate Clamp for aLIGO Jesper Munch et al. Final Design
Preliminary Design
Auxiliary Optics
18 Mar 2014
D1000657-v7 TCS Hartmann Sensor Assembly Mindy Jacobson et al. Assembly
Auxiliary Optics
18 Mar 2014
G1400227-v1 Gravitational waves and the antenna pattern (Poster) Tobin Fricke Education, Outreach
15 Mar 2014
G1400198-v2 Core Optics related loss hierarchy of aLIGO - LVC2014 Hiro Yamamoto Core Optics
Modelling
15 Mar 2014
G1100046-v1 LIGO Poster Tobin Fricke et al. Public Talk / Colloquium
Detector
Education, Outreach
13 Mar 2014
T1400209-v1 optocad analysis of beam parameters at the ISS PD array Benno Willke Laser Systems
Modelling
Final Design
12 Mar 2014
D1300749-v1 testing the public view setting bug Cleveland Mak System Test
Temporary Test Document
Upgrades
11 Mar 2014
D1000231-v7 Custom Cable V25T-36 v7, Dual QPD cable assembly Rich Abbott et al. Sensing and Control
Fabrication
06 Mar 2014
T1200306-v2 Suspension Hardware Watchdog Requirements Rolf Bork et al. Suspensions
Requirements
03 Mar 2014
T1200415-v1 aLIGO LHO Resonances Mark Barton System Test
Subsystem Test
03 Mar 2014
G1301138-v1 American University LIGO Poster Gregg Harry et al. Education, Outreach
28 Feb 2014
E1000076-v3 aLIGO ISC Optics: 2" 99% reflectors @ 1064 Daniel Sigg et al. Basic R&D
25 Feb 2014
T980121-v1 Preliminary results from Livingston VE vibration & acoustic testing Michael Zucker Vacuum
System Test
19 Feb 2014
T1400055-v1 Core Optics related loss hierarchy of aLIGO Hiro Yamamoto Core Optics
Modelling
18 Feb 2014
T1400056-x0 3IFO Viewport Requirements by Chamber (LTS) Calum Torrie et al. Requirements
13 Feb 2014
D0902513-v4 Fibre guard angle section 5 Marielle van Veggel et al. Suspensions
Preliminary Design
12 Feb 2014
D0902511-v4 Fibre guard angle section 3 Marielle van Veggel et al. Preliminary Design
Suspensions
12 Feb 2014
P1400015-v3 Gravitational Wave Detection with Advanced Ground Based Detectors Lisa Barsotti et al. Public Talk / Colloquium
08 Feb 2014
T070189-v3 Design Specifications for the OMC Suspension Norna Robertson et al. Requirements
Suspensions
07 Feb 2014
D080659-v3 D080659_ALIGO COC_CP_SUBSTRATE Calum Torrie Final Design
Core Optics
07 Feb 2014
G1400092-v3 LLO PRMI Contrast Defect : Simulation is larger than data Hiro Yamamoto Core Optics
Modelling
03 Feb 2014
T1400023-v1 Math Trick for Velocity in state-space models Brian Lantz et al. Seismic Isolation
Modelling
24 Jan 2014
D0901137-v5 aLIGO Systems, BSC1-H1 Top Level Chamber Assembly Jose Eduardo Chavez System Engineering
Final Design
23 Jan 2014
T1300884-v3 Advanced LIGO Automation Requirements Jameson Graef Rollins Requirements
State Control and Monitoring
20 Jan 2014
G1300403-v1 LSC Brochure for graduate programs and REUs - MURF Version Marco Cavaglia Education, Outreach
18 Jan 2014
G1400012-v2 Adding ECD to Matlab/Mathematica SUS models Mark Barton Suspensions
Modelling
15 Jan 2014
D1000708-v7 aLIGO TCS Hartmann Sensor Camera Spacer Plate Mindy Jacobson et al. Auxiliary Optics
Fabrication
Final Design
15 Jan 2014
G1400032-v1 Advanced LIGO Seismic Isolation Brochure Fabrice Matichard Seismic Isolation
Education, Outreach
12 Jan 2014
P1100013-v1 Characterization of the Photon Calibrator data from LIGO's sixth Science Run Alberto Sottile Calibration
Thesis/Dissertation
12 Jan 2014
P1000093-v1 Open issues in the search for gravitational-wave transients Lindy Blackburn GW Bursts
Thesis/Dissertation
12 Jan 2014
R1300028-v2 Change Request for Secondary Power feed to LHO Richard McCarthy Operations
Change Control
Operations Liens List
07 Jan 2014
G1301287-v2 Advanced LIGO and the bright future of gravitational wave observation Lisa Barsotti Public Talk / Colloquium
06 Jan 2014
R1300030-v1 Vacuum Control System Upgrade Change Request Richard McCarthy et al. Upgrades
Operations
Operations Liens List
Vacuum
18 Dec 2013
T0900555-v6 Error Estimation of the LIGO Response Function Jeffrey Kissel Calibration
Modelling
Sensing and Control
18 Dec 2013
D1001963-v4 aLIGO_AOS_Output Alignment Fixture Assy Manuel Ruiz et al. Basic R&D
Auxiliary Optics
18 Dec 2013
T1301001-v2 Modeling LLO PRMI using FFT simulation package, FOGPrime13 Hiro Yamamoto Core Optics
Modelling
16 Dec 2013
T1300954-v2 Investigation of beam clipping in the Power Recycling Cavity of Advanced LIGO using FINESSE Charlotte Bond et al. Core Optics
Commissioning
16 Dec 2013
T1300986-v2 Revisting Sidebands of Sidebands in Finesse Jordan Clarke et al. Modelling
13 Dec 2013
S1202956-v1 L1-DAQ-YC1 David Kinzel et al. System Engineering
Operations
12 Dec 2013
S1202949-v4 L1-DAQ-XC1 David Kinzel et al. Data Acquisition System
Operations
12 Dec 2013
E1200844-v2 aLIGO SUS Acceptance Criteria and Deliverables Jeffrey Kissel et al. Suspensions
System Test
11 Dec 2013
G1300808-v1 Operations Sparing Plan Approach Dennis Coyne System Engineering
Operations
11 Dec 2013
D1002153-v3 aLIGO BS/FM Prism holder Marielle van Veggel et al. Suspensions
Installation
11 Dec 2013
T0900423-v4 ISC Quadrant Photodetector Design Rich Abbott et al. Basic R&D
Sensing and Control
09 Dec 2013
T1200416-v2 First Contact and its Effect on Pitch of Optics Mark Barton Installation
Suspensions
Core Optics
Modelling
09 Dec 2013
G1301190-v3 aLIGO general talk for London IOP Violent Universe David Shoemaker Detector
Public Talk / Colloquium
06 Dec 2013
T1300464-v1 Sidebands on Sidebands in Finesse Keita Kawabe Modelling
Sensing and Control
06 Dec 2013
T1300887-v1 The LSC White Paper on Education and Public Outreach 2013-2014 - Public Document Szabolcs Marka et al. Education, Outreach
06 Dec 2013
G1301213-v2 The Explosive Death of Stars & The Birth of a New Astronomy Christian David Ott et al. Education, Outreach
Public Talk / Colloquium
GW source predictions
Astrophysics / Multi-messenger
GW Bursts
29 Nov 2013
G1300687-v1 Modelling mirror surface distortion effects in low-loss, near-unstable Fabry-Perot cavities Daniel Brown et al. Modelling
27 Nov 2013
D1101585-v2 TRANSMON ISC as installed for the H2OAT Lisa Barsotti Auxiliary Optics
Installation
25 Nov 2013
G1200723-v1 Adaptive Modal Damping of Advanced LIGO Suspensions Brett Shapiro Thesis/Dissertation
23 Nov 2013
E1200639-v1 aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System Aidan Brooks et al. Auxiliary Optics
System Engineering
Integration
Subsystem Test
Installation
System Test
22 Nov 2013
L1300208-v4 the testing of BUGS 339, 340 and 341 and now 347 & 348 too! Cleveland Mak Temporary Test Document
System Test
20 Nov 2013
D1200782-v2 aLIGO TCS CO2 Laser and Shutter Assembly Mindy Jacobson et al. Operations
Subsystem Test
Assembly
Installation
Auxiliary Optics
19 Nov 2013
E1300766-v3 the testing of BuGS 339, 340 and 341 plus other items on IE Cleveland Mak et al. Upgrades
System Test
Temporary Test Document
12 Nov 2013
D1101048-v3 aLIGO, PLATE, TEMPLATE, ALIGNMENT , BSC STRUCTURE Scott Shankle et al. Final Design
Installation
Suspensions
Fabrication
25 Aug 2011
P1300183-v1 A directed search for continuous gravitational waves from unknown isolated neutron stars at the Galactic center Berit Behnke et al. Thesis/Dissertation
11 Nov 2013
T000134-x0 Dynamical Properties of LIGO Single-Loop Suspended Mirrors Malik Rakhmanov et al. Modelling
Input Optics
Core Optics
Basic R&D
Suspensions
31 Oct 2013
T1300683-v1 Tidal Prediction for Advanced LIGO: Final Report Noah Kurinsky et al. State Control and Monitoring
Modelling
27 Oct 2013
E1000295-v8 aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference Guido Mueller et al. Fabrication
Auxiliary Optics
Vacuum
Incoming Inspection
25 Oct 2013
G1301181-x0 Next Generation Science Standards on Wave Behavior: LIGO's Resources for Elementary and Middle School Classrooms Dale Ingram Education, Outreach
24 Oct 2013
T1300688-v2 ALS Noise Measurements and Model for HIFO-Y Alexa N Staley et al. Modelling
21 Oct 2013
T1200385-v2 LLO BS Prism Gluing Issue and Resolution Janeen Romie et al. Modelling
Installation
Suspensions
18 Oct 2013
S1202954-x0 L1-SUS-YC2 David Kinzel System Engineering
Operations
16 Oct 2013
G1301146-v2 the testing of BUGS 339, 340 and 341 plus other items on chrome Cleveland Mak Temporary Test Document
System Test
14 Oct 2013
G1301148-v1 Celebrating 10 Years of CGWA Peter Saulson Public Talk / Colloquium
11 Oct 2013
T1300854-v2 3.1.0 patch test document abc Cleveland Mak et al. System Test
Temporary Test Document
11 Oct 2013
G1301136-v1 News from LIGO Hanford Observatory Kiwamu Izumi Public Talk / Colloquium
10 Oct 2013
D0901146-v5 aLIGO Systems, BSC3-H1 Top Level Chamber Assembly Jose Eduardo Chavez Final Design
System Engineering
09 Oct 2013
E1300746-v2 3.1.0 patch test doc for IE Cleveland Mak System Test
Temporary Test Document
07 Oct 2013
P1300173-v1 Gravitational Wave Astronomy with LIGO: from Data to Science Tiffany Summerscales Data Analysis
Thesis/Dissertation
06 Oct 2013
E1300480-v2 Software Manual for the Vacuum System Toolbox Derek Bridges Modelling
Vacuum
04 Oct 2013
G1300955-x0 dcc 3.1.0 release test document number three Cleveland Mak et al. System Test
Temporary Test Document
Quality Assurance
02 Oct 2013
G1301123-v2 3.1.0 patch test doc for chrome Cleveland Mak System Test
Temporary Test Document
02 Oct 2013
L1300203-x0 yet another test Melody Araya Temporary Test Document
01 Oct 2013
L1300202-x0 another test Melody Araya Temporary Test Document
01 Oct 2013
L1300201-v1 my test Melody Araya Temporary Test Document
01 Oct 2013
P1300170-v1 Toward Quantum Opto-Mechanics in a Gram-Scale Suspended Mirror Interferometer Christopher Wipf Thesis/Dissertation
01 Oct 2013
D1001962-v5 Output Alignment Fixture Support Manuel Ruiz Basic R&D
Auxiliary Optics
30 Sep 2013
G1300864-v1 Working Towards Finding an Upper Limit for Crackle in LIGO’s Maraging Steel Blade Springs Benjamin Levy et al. Suspensions
Public Talk / Colloquium
26 Sep 2013
G1301110-v1 Looking forward, looking back Peter Saulson Public Talk / Colloquium
26 Sep 2013
P1300098-v2 LIGO Magazine, issue 3 9/2013 Andreas Freise Laser Systems
Education, Outreach
25 Sep 2013
D1003111-v3 SLC PHOTODETECTOR CABLE LOWER ASSY Niem Nguyen Modelling
Auxiliary Optics
23 Sep 2013
E1300719-v3 DCC release 3.1.0 test doc #2 Cleveland Mak et al. Temporary Test Document
System Test
21 Sep 2013
M1300504-v1 dcc release 3.1.0 test document #4 Cleveland Mak Temporary Test Document
System Test
18 Sep 2013
T080062-v2 UK Satellite Amplifier Test Plan Jay Heefner et al. Suspensions
System Test
18 Sep 2013
E1300336-x0 Repository for Signal Recycling Cavity Baffle Supporting Analyses/models Michael Smith Auxiliary Optics
Modelling
18 Sep 2013
E1300342-x0 Repository for Manifold/Cryopump & Mode Cleaner Baffles Supporting Analyses/models Michael Smith Modelling
18 Sep 2013
E1300343-x0 Repository for ITM Elliptical Baffle Supporting Analyses/models Michael Smith Auxiliary Optics
Modelling
18 Sep 2013
E1300344-x0 Repository for BS Elliptical Baffle Supporting Analyses/models Michael Smith Modelling
18 Sep 2013
D1201014-v1 aLIGO_AOS_ACB, Ninety Thous Magnets Gauge Tim Nguyen Auxiliary Optics
Modelling
18 Sep 2013
T1300830-v1 MC tube baffle beam clearance Michael Smith Auxiliary Optics
Modelling
18 Sep 2013
T1300829-v1 ACB ETM wide angle scatter power summary Michael Smith Modelling
Auxiliary Optics
18 Sep 2013
T1300828-v1 ALS-photodetector on ACB Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300827-v1 ACB shift with target Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300824-v1 wide angle scatter_ETMX_H1_power Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300823-v1 wide angle scatter_ITMX_H1_power Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300821-v1 BS elliptical baffle-3 Model Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300816-v1 ITM Elllip Baf scatter overlap integral Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300820-x0 Riley_mrs_10-31-07 - BRDF SURF doc Michael Smith Auxiliary Optics
Education, Outreach
17 Sep 2013
T1300819-v1 Dan Riley BRDF measurement - final1 Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300818-v1 Riley-Smith BRDF measurement - final1_mrs Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300817-v1 aLIGO TCS CO2P BSC2 BAFFLE ASSEMBLY_Three Concepts Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300812-v1 Manifold-cryo-baf_Blades_Weight_Req Michael Smith Incoming Inspection
Auxiliary Optics
17 Sep 2013
T1300811-v1 Manifold-Cryo_baffle scatter ETM-annulus Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300810-v1 MC Tube Baffle Scatter Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300808-v1 SR2 AR Baf_Hartmann Scraper Baf_revised sketch Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300807-v1 HAM-BD heights Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300806-v1 SR Cavity Baf scatter overlap_integral Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300805-v1 Scattering from SRM AR Baf1_overlap integral Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300804-v1 SR Cavity Size Summary Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300803-v1 Signal recycling cavity beam parameters Michael Smith Auxiliary Optics
Modelling
17 Sep 2013
T1300801-v1 SRM AR BAF SPACER HEIGHT Michael Smith Auxiliary Optics
Modelling
16 Sep 2013
T1300800-v1 HAM SCRAPER BAF SPACER HEIGHT Michael Smith Auxiliary Optics
Modelling
16 Sep 2013
T1300798-v1 beam size at SR2 baffle Michael Smith Auxiliary Optics
Modelling
16 Sep 2013
T1300789-v1 OFI Wedge Prism Reflectance Data Michael Smith Incoming Inspection
Auxiliary Optics
16 Sep 2013
T1300699-v1 ACB scatter various materials Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
T1300700-v1 ACB DLC coating on SS Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
G1300935-v2 Status update of aLIGO lock acquisition simulation (20130913) Kiwamu Izumi Modelling
13 Sep 2013
T1300731-v1 Low-scatter Coating for SS Baffles Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300772-v1 CASI BRDF Data, #2 porcelain steel 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300771-v1 Rai Weiss_porcelainized-steel_backscatter_4 Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300770-v1 CASI BRDF Data, #4 oxidized steel 3 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300762-v1 CASI BRDF Data, #4 oxidized steel 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300764-v1 CASI BRDF Data, DLC 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300767-v1 CASI BRDF Data, DLC 15 deg inc Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300768-v1 CASI BRDF Data, DLC 5 deg inc Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300765-v1 BRDF Multi-AR SS 30 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300766-v1 BRDF Multi-AR SS 10 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
E1300424-v1 Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf Michael Smith Incoming Inspection
Auxiliary Optics
13 Sep 2013
E1100583-v1 SEM Examination of Spotted and Rusted Cantilever Blades Jeffrey Lewis Incoming Inspection
13 Sep 2013
D1001011-v3 SLC ARM CAVITY BAFFLE SUSPENSION ASSY Niem Nguyen et al. Fabrication
Auxiliary Optics
Modelling
12 Sep 2013
G1300915-v1 The Advanced LIGO GW detector Volker Quetschke Detector
Public Talk / Colloquium
09 Sep 2013
T0900080-v1 OMC Suspension Advanced LIGO Test Plan Norna Robertson et al. System Test
Suspensions
06 Sep 2013
G1300909-v1 Mode matching investigations at LLO Lisa Barsotti et al. Sensing and Control
Commissioning
06 Sep 2013
E1200535-v45 TMS WORK TO DO LIST GOING FORWARD Ken Mailand Upgrades
Auxiliary Optics
03 Sep 2013
E1300656-v1 Electronics and Optics Change Request from the HIFO-Y Test Daniel Sigg Commissioning
03 Sep 2013
T1100160-v9 aLIGO ISC QPD Transimpedance Amplifier Test Procedure Rich Abbott et al. System Test
Sensing and Control
27 Aug 2013
T1300719-v1 BRDF Multi-AR SS 57 deg inc Michael Smith Auxiliary Optics
Upgrades
27 Aug 2013
T1300718-v1 BRDF Multi-AR SS 15 deg inc Michael Smith Auxiliary Optics
Upgrades
27 Aug 2013
T1300717-v1 BRDF Multi-AR SS 3 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300716-v1 ACB Multi-AR coating on SS Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
G1300834-v1 Tidal Prediction for Advanced LIGO: Final Presentation Noah Kurinsky Modelling
State Control and Monitoring
26 Aug 2013
T1300713-v1 OFI Balance Weights for heavy table D0900015-v5 Michael Smith Upgrades
Auxiliary Optics
26 Aug 2013
G1300868-v1 Controlling Transient Thermal Effects in High-Power Gravitational-Wave Detectors Arnaldo Rodriguez et al. Auxiliary Optics
Public Talk / Colloquium
22 Aug 2013
G1300863-x0 Working Towards Finding an Upper Limit for Crackle in LIGO’s Maraging Steel Blade Springs Benjamin Levy et al. Public Talk / Colloquium
Suspensions
22 Aug 2013
D1201420-v1 ZnSe Viewport Beam Block, Long, aLIGO TCS CO2P, H1-L1 Mindy Jacobson et al. Vacuum
Auxiliary Optics
Requirements
Installation
Assembly
20 Aug 2013
D1201421-v2 ZnSe Viewport Beam Block, Short, aLIGO TCS CO2P, H1-L1 Mindy Jacobson et al. Auxiliary Optics
Vacuum
Requirements
Installation
Assembly
20 Aug 2013
T1300695-v1 BS Elliptical Baffle--Black Glass Design Scattering Analysis Michael Smith Auxiliary Optics
Upgrades
15 Aug 2013
T1300692-v1 BS Elliptical Baffle Scatter_Black Glass Design Michael Smith Upgrades
15 Aug 2013
T1300591-v2 ITM Elliptical Baffle--Black Glass Hybrid Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300691-v1 ACB upgrade SS with black glass Michael Smith Auxiliary Optics
Upgrades
15 Aug 2013
T1300689-v2 ITM Elliptical Baffle Scatter_Black Glass Hybrid Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
E0900301-v3 IOO Faraday Isolator Assembly and Certification Procedures David Tanner et al. Fabrication
Detector
Input Optics
13 Dec 2011
G1300835-v1 Status update of aLIGO lock acquisition simulation (20130814) Kiwamu Izumi Modelling
14 Aug 2013
T1300685-v1 ITM Elliptical Baffle Scattered Light Interference Effects Michael Smith Upgrades
Auxiliary Optics
14 Aug 2013
G1300830-v1 sustools.py, a Python module for SUS Mark Barton Suspensions
Commissioning
12 Aug 2013
G1300827-v1 Looking for Black Holes with Lasers Andreas Freise Public Talk / Colloquium
10 Aug 2013
G1200393-v2 Black Holes And LIGO 2012 Gregory Mendell et al. Public Talk / Colloquium
09 Aug 2013
D1002418-v3 aLIGO_Manifold Cryo Baffle_Mid Horizontal Weight Tim Nguyen Basic R&D
Auxiliary Optics
02 Aug 2013
D1002403-v4 aLIGO_Manifold Cryo Baffle_Vertical Weight Tim Nguyen Basic R&D
Auxiliary Optics
02 Aug 2013
C1302350-v2 RFP No. LP-11a LIGO Hanford Insulation Removal Rudy Arvizu Operations Liens List
Procurements
01 Aug 2013
T1300657-v1 Analysis of DLC and Semiconductor AR Coatings for Stainless Steel Baffles Michael Smith Upgrades
Auxiliary Optics
30 Jul 2013
T070039-v8 SIS (Stationary Interferometer Simulation) manual Hiro Yamamoto Modelling
30 Jul 2013
E1000886-v2 DCN-Revision of TMS Mirror Clamps Ken Mailand Auxiliary Optics
Upgrades
18 Jul 2013
D1000128-v3 Penultimate mass prism holder for D0901592 bonding jig Marielle van Veggel et al. Suspensions
Preliminary Design
18 Jul 2013
D1000441-v2 aLIGO INTERMEDIATE WIRE CLAMP ASSY MIDDLE WIRE Ignacio Romero Auxiliary Optics
Conceptual Design
13 Jul 2013
T1300622-v1 Vibration / Shake Tables FOR SUSPENSION AND STRUCTURE TESTING Ken Mailand et al. Core Optics
Operations
12 Jul 2013
G1300751-v1 Advanced LIGO - Colloquium for U. Washington, 11 July 2013 David Shoemaker Detector
Public Talk / Colloquium
10 Jul 2013
G1300741-v3 Towards the Quantum Limit: An Update from the AEI 10-meter Prototype Facility Tobin Fricke Public Talk / Colloquium
09 Jul 2013
G1300524-v1 The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition Adam Mullavey et al. Commissioning
Sensing and Control
09 Jul 2013
G1300719-v3 Performance of the Advanced LIGO Input Optics Chris Mueller Public Talk / Colloquium
Integration
Input Optics
Commissioning
Subsystem Test
09 Jul 2013
G1300708-v2 Status of Advanced LIGO Lisa Barsotti Public Talk / Colloquium
08 Jul 2013
G1300724-v1 Measuring the quality factor of a resonator with a lock-in Jonathan Newport Education, Outreach
05 Jul 2013
E0900140-v3 Advanced LIGO End Reaction Mass Coating Specification Margot Hennig Final Design
Core Optics
04 Jul 2013
D1001005-v7 SLC ARM CAVITY BAFFLE BLADE ASSY Niem Nguyen et al. Modelling
Auxiliary Optics
03 Jul 2013
E1300578-v1 ECR: Topology Changes to SUS models as a result of ISC Informed Interaction Jeffrey Kissel Suspensions
Commissioning
Change Control
02 Jul 2013
L1300131-v1 Addendum No. 3 to LHO Reroof Project 6/3/13 Rudy Arvizu Procurements
Operations Liens List
02 Jul 2013
L1300129-v1 Addendum No. 2 to LHO Reroof Project 5/31/13 Rudy Arvizu Procurements
Operations Liens List
02 Jul 2013
L1300125-v1 Addendum No. 1 to LHO Reroof Project 5/23/13 Rudy Arvizu Procurements
Operations Liens List
02 Jul 2013
D1002431-v2 aLIGO TCS CO2 Laser In-Vacuum Steering Optics Assembly, H2, BSC8 Mindy Jacobson Preliminary Design
Auxiliary Optics
Vacuum
09 Feb 2011
G1300654-v1 SHADOW-SENSING OF VIOLIN-MODES ON AN ADVANCED LIGO SUSPENSION Nick Lockerbie et al. Suspensions
Public Talk / Colloquium
28 Jun 2013
G1300655-v1 A LOW-NOISE AMPLIFIER FOR SHADOW-SENSING OF VIOLIN-MODES IN AN ADVANCED LIGO SUSPENSION Nick Lockerbie et al. Public Talk / Colloquium
Sensing and Control
Suspensions
28 Jun 2013
P1300088-v1 A Targeted LIGO-Virgo Search for Gravitational Waves Associated with Gamma-Ray Bursts Using Low-Threshold Swift GRB Triggers Emelie Harstad GW Bursts
Thesis/Dissertation
27 Jun 2013
T1300589-x0 ACB--Black Glass Hybrid Baffle Design Scattering Analysis Michael Smith Auxiliary Optics
Upgrades
27 Jun 2013
D1000715-v4 TCS Hartmann Sensor Camera Mount Mindy Jacobson et al. Fabrication
Auxiliary Optics
Final Design
Preliminary Design
25 Jun 2013
D1001970-v4 aLIGO_AOS_Manifold Cryo Baffle_Suspension Rod Tim Nguyen Auxiliary Optics
Basic R&D
21 Jun 2013
D0902817-v4 aLIGO_Manifold_Cryo_Baffle_Blade_Spring Heidy Kelman et al. Auxiliary Optics
Basic R&D
21 Jun 2013
D1300588-v1 ACB 1Hole with Black Glass Michael Smith Auxiliary Optics
Upgrades
21 Jun 2013
D1001519-v8 Cable Assy, Lower Ring Heater Segment Mindy Jacobson et al. Cleaning
Auxiliary Optics
Vacuum
Assembly
Fabrication
Final Design
19 Jun 2013
T1300218-v1 Creep of SLC Maraging Steel Suspension Blades Michael Smith Auxiliary Optics
Installation
Modelling
19 Jun 2013
T1300414-v2 Output Faraday Isolator Blade Creep Michael Smith Modelling
Auxiliary Optics
19 Jun 2013
E1300411-v1 ECR for PEM upgrade Robert Schofield Upgrades
19 Jun 2013
T1300558-v1 L1 DRMI Measurements: a checklist Peter Fritschel et al. Commissioning
System Test
18 Jun 2013
T1300539-v2 BS wide-angle Scatter Displacement Noise Summary Michael Smith Modelling
Auxiliary Optics
14 Jun 2013
T1300538-v1 BS_wide-angle_scatter_ZEMAX Michael Smith Auxiliary Optics
Modelling
13 Jun 2013
T1300534-v1 Exploration of the best way of applying longitudinal force at the quad test mass using the top mass actuators Mark Barton Modelling
Suspensions
13 Jun 2013
T1300431-v1 Finesse 1.0 Manual Andreas Freise Core Optics
Modelling
Sensing and Control
12 Jun 2013
D070107-v2 HAM6 Septum Plate for ELIGO Jim Warner Final Design
Vacuum
10 Jun 2013
G1300624-v1 Identifying and mitigating scattered light noise in LIGO - GEO scattering workshop Robert Schofield Commissioning
10 Jun 2013
G1300531-v3 Advanced LIGO Keita Kawabe Public Talk / Colloquium
06 Jun 2013
D0900541-v5 Faraday Isolator Upper Blade Niem Nguyen Auxiliary Optics
Modelling
06 Jun 2013
D1300513-v1 HIFO-Y(Half Interferomter Y) expected power budget for initial alignment Kiwamu Izumi Commissioning
06 Jun 2013
E1300449-v2 RFPD Clean and Bake Procedure Rich Abbott Cleaning
Sensing and Control
03 Jun 2013
G1300598-v1 Outreach poster on timing Zsuzsanna Marka Education, Outreach
30 May 2013
G1300597-v1 Advance LIGO Outreach Poster Zsuzsanna Marka Education, Outreach
30 May 2013
D0900586-v4 Faraday Isolator Up Wire Assembly Manuel Ruiz et al. Auxiliary Optics
Assembly
14 Nov 2012
D020133-v1 Lower Blade Wire Clamp Plate (OMCS) Derek Bridges Suspensions
Final Design
28 May 2013
D020132-v2 Lower Blade Wire Clamp (HSTS/OMCS) Bobby Moore Suspensions
Final Design
28 May 2013
D070020-v2 Magnet Holder (OMCS) Derek Bridges Preliminary Design
Suspensions
28 May 2013
D060491-v2 Main Section, Upper Mass (OMCS) Derek Bridges Suspensions
Final Design
28 May 2013
D070022-v1 Wire Clamp, Top Blade (OMCS) Michael Meyer Final Design
Suspensions
28 May 2013
D020139-v1 Wire Clamp Plate, Upper Mass (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D020309-v1 Wire Clamp Plate with Groove, Upper Mass (OMCS) Michael Meyer Final Design
Suspensions
28 May 2013
D070030-v1 C-Clamp for Top Wire (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D030042-v1 Wire Clamp Plate, Upper Blade (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D030450-v2 Pull Plate, Rotational Adjuster (HSTS/OMCS) Bobby Moore Final Design
Suspensions
28 May 2013
D030449-v2 Push Plate, Rotational Adjuster (HSTS/OMCS) Bobby Moore Final Design
Suspensions
28 May 2013
D030447-v2 Rotating Plate, Rotational Adjuster (HSTS/OMCS) Bobby Moore Suspensions
Final Design
28 May 2013
G1300588-v1 Postcard Design for LIGO Magazine - 4x6 - with traceable QR codes Szabolcs Marka et al. Education, Outreach
27 May 2013
T080186-v1 Modeling of Alignment Sensing and Control for Enhanced LIGO Lisa Barsotti et al. Sensing and Control
Modelling
23 May 2013
D020336-v2 Lower Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020313-v2 Lower Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020335-v2 Lower Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020334-v2 Lower Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020333-v2 Lower Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020308-v2 Lower Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) Derek Bridges Final Design
Suspensions
22 May 2013
D020340-v2 Lower Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020314-v2 Lower Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020339-v2 Lower Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020338-v2 Lower Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020337-v2 Lower Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020119-v2 Lower Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020680-v2 Upper Blade Clamp Shim, 2mm (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020679-v2 Upper Blade Clamp Shim, 1mm (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030466-v2 Upper Blade Clamp, Lower Side, 3.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D030465-v2 Upper Blade Clamp, Lower Side, 3.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D030463-v2 Upper Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030462-v2 Upper Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030461-v2 Upper Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D030460-v2 Upper Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030459-v3 Upper Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D030464-v2 Upper Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020690-v2 Upper Blade Clamp, Upper Side, 3.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020689-v2 Upper Blade Clamp, Upper Side, 3.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020328-v2 Upper Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020312-v2 Upper Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020327-v2 Upper Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020326-v2 Upper Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
21 May 2013
D020325-v2 Upper Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) Michael Meyer Suspensions
Final Design
21 May 2013
D020116-v2 Upper Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
E050228-v2 Silicate Bonding Procedure (Hydroxide-Catalysis Bonding) Marielle van Veggel Basic R&D
Suspensions
31 Aug 2010
D1201454-v2 ACB_Stage Zero-BSC3_ Endclamp, End Tim Nguyen et al. Fabrication
Auxiliary Optics
Modelling
21 May 2013
D1101622-v2 ACB_Stage Zero-BSC1_ Endclamp, End Tim Nguyen et al. Fabrication
Auxiliary Optics
21 May 2013
D1200604-v1 aLIGO_ITM Elliptical XY_Interface fixture Slider Tim Nguyen Auxiliary Optics
Modelling
21 Dec 2012
G1300578-v1 Experiences and lessons learned from interferometer simulations at GEO Andreas Freise Modelling
Sensing and Control
21 May 2013
G1300576-x0 Building up a commissioning network Lisa Barsotti Commissioning
20 May 2013
G1300554-v1 First Lessons from the Advanced LIGO Integration Testing Daniel Sigg Commissioning
16 May 2013
E1300368-v1 Install BS Elliptical Baffle LLO BSC2 X&Y Test Michael Smith Incoming Inspection
Auxiliary Optics
15 May 2013
T1300475-v1 OFI scattering Michael Smith Modelling
Auxiliary Optics
14 May 2013
C1301598-v2 Invitation To Bid for the LIGO Hanford Re-roof Rudy Arvizu et al. Operations
Procurements
10 May 2013
D1300438-x0 aLIGO TCS HWS Pedestal Dog Clamps Mindy Jacobson Vacuum
System Engineering
Cleaning
Auxiliary Optics
Installation
07 May 2013
G1100114-v1 LIGO REU Brochure Dale Ingram Education, Outreach
03 May 2013
E1101086-v6 OMC Optical Prisms Sam Waldman et al. Sensing and Control
Requirements
03 May 2013
G1300533-v1 Status update of aLIGO lock acquisition simulation (20130503) Kiwamu Izumi Commissioning
03 May 2013
G1300532-v2 FFT Simulation using FOG : LIGO seminar on May 3rd, 2013 Richard Day Core Optics
Modelling
03 May 2013
G1201071-v3 Complexities in Operating Large-scale Gravitational Wave Interferometers Corey Gray Public Talk / Colloquium
29 Apr 2013
G1300508-x0 Education and Public Outreach: Skills and Media Amber Stuver Meeting
Education, Outreach
28 Apr 2013
G1300500-v1 Detecting gravitational waves with Advanced LIGO: how, when, and what will come next Lisa Barsotti Public Talk / Colloquium
26 Apr 2013
T1300419-v1 OFI 1st Article Data_hanford iLog Keita Kawabe System Test
Auxiliary Optics
25 Apr 2013
T1300401-v1 wide angle scatter_BS_L1_power Michael Smith Modelling
Auxiliary Optics
25 Apr 2013
E1300293-x0 SLC & VP Requirements documentation Michael Smith Auxiliary Optics
Requirements
23 Apr 2013
E1300299-x0 SLC & VP Test documents Michael Smith System Test
Auxiliary Optics
22 Apr 2013
G1300480-v2 Beyond Advanced Gravitational Wave Detectors: beating the quantum limit with squeezed states of light Lisa Barsotti Public Talk / Colloquium
22 Apr 2013
G1300455-v3 Advanced LIGO for McGill 2013-04-17 David Shoemaker Detector
Public Talk / Colloquium
21 Apr 2013
T1200008-v3 Comparison of Quantum Noise in 3G Interferometer Configurations Haixing Miao et al. Modelling
Sensing and Control
Basic R&D
18 Apr 2013
D070250-v4 Base Plate, Lower Wire Jig (OMCS) Derek Bridges Suspensions
Final Design
17 Apr 2013
D020677-v3 Library of Clamps (HSTS/OMCS) Michael Meyer Final Design
Suspensions
17 Apr 2013
D070139-v1 Upper Wire Jig Assembly (OMCS) Michael Meyer Suspensions
Final Design
17 Apr 2013
D0900308-v4 Structural Weldment (OMCS) Michael Meyer et al. Final Design
Suspensions
16 Apr 2013
G1300452-v2 Enhancing the astrophysical reach of LIGO with squeezed states Lisa Barsotti Public Talk / Colloquium
13 Apr 2013
G1300119-v2 Friendly Power Shutdown for LLO Corner Buildings David Kinzel Sensing and Control
Laser Systems
Policies
Observatory Facilities
Seismic Isolation
Data Acquisition System
Core Optics
Vacuum
System Engineering
Input Optics
Auxiliary Optics
Commissioning
Suspensions
Data and Computing
11 Apr 2013
G1300440-v1 Environmentors Poster Presentation Corey Gray Education, Outreach
09 Apr 2013
G1300434-v1 Update from the AEI 10m Prototype Tobin Fricke Public Talk / Colloquium
Commissioning
Installation
07 Apr 2013
D1100911-v3 aLIGO TCS URS50 MOUNT Mindy Jacobson Preliminary Design
Input Optics
Auxiliary Optics
04 Apr 2013
G1300420-v1 Beyond Advanced Gravitational Wave Detectors: beating the quantum limit with squeezed states of light Lisa Barsotti Public Talk / Colloquium
03 Apr 2013
G1100769-v2 QUAD Testing Outline, Phase 2B Jeffrey Kissel et al. System Test
Basic R&D
Suspensions
Subsystem Test
Fabrication
Commissioning
Auxiliary Optics
Core Optics
System Engineering
25 Mar 2013
P1300029-v2 LIGO Magazine, issue 2 3/2013 Andreas Freise Other data analysis
Education, Outreach
19 Mar 2013
T1300158-v2 Arm cavity geometry for H1 ALS test with X and Y arm Keita Kawabe Sensing and Control
Core Optics
Commissioning
18 Mar 2013
G1200508-v2 LLO Power Monitoring Requirements David Kinzel Procurements
Requirements
18 Mar 2013
T1100080-v3 Commissioning Advanced LIGO's First Arm Cavity Daniel Sigg et al. System Engineering
Integration
Commissioning
17 Mar 2013
D0900015-v5 Faraday Isolator Table Plate Manuel Ruiz et al. Basic R&D
Auxiliary Optics
14 Mar 2013
D1201160-v2 AdLIGO_AOS_SLC_ACB Upper Right Mouse Hole Cover Tim Nguyen Auxiliary Optics
Modelling
14 Mar 2013
E1200254-v3 Tolerances for Height Measurements of the HAM Suspensions During Assembly Derek Bridges Suspensions
Assembly
Modelling
12 Mar 2013
F1100002-v4 Winding Template, aLIGO TCS Ring Heater Elements Mindy Jacobson et al. Incoming Inspection
Fabrication
Auxiliary Optics
Vacuum
07 Mar 2013
G1300120-v2 Mirror quality and interferometer performance Hiro Yamamoto Core Optics
Modelling
06 Mar 2013
G1300087-v1 Stabilization Techniques at LIGO Koji Arai Public Talk / Colloquium
06 Mar 2013
T1100073-v3 List of Suspensions in Chambers Norna Robertson Suspensions
Installation
07 Feb 2011
T010076-v2 Advanced LIGO Optical Layout Overview Dennis Coyne Preliminary Design
System Engineering
28 Feb 2013
D1201163-v2 AdLIGO_AOS_SLC_ACB Upper Left Mouse Hole Cover Tim Nguyen Modelling
Auxiliary Optics
25 Feb 2013
D1201125-v2 aLIGO_Manifold_Cryo_Baffle_ETM X_Radial Segment Right Tim Nguyen Auxiliary Optics
Modelling
22 Feb 2013
D1001348-v3 aLIGO_Manifold_Cryo_Baffle_Cyl-Scraper_Assy Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D1001073-v3 aLIGO_Radial_Attachment Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D1001018-v3 aLIGO_Manifold_Cryo_Baffle_Scraper_Plate Heidy Kelman Basic R&D
Auxiliary Optics
22 Feb 2013
D1000570-v3 aLIGO_Manifold_Cryo_Baffle_Cylinder Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D1000558-v3 aLIGO_Manifold_Cryo_Baffle_Radial_Segment_Left Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D1000536-v3 aLIGO_Manifold_Cryo_Baffle_Brace_Brkt Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D0902621-v3 aLIGO_Manifold_Cryo_Baffle_Bracket Heidy Kelman Auxiliary Optics
Basic R&D
22 Feb 2013
D0902620-v3 aLIGO_Manifold_Cryo_Baffle_Radial_Segment, Bottom Heidy Kelman Basic R&D
Auxiliary Optics
22 Feb 2013
D1101120-v2 Name plate Laser/Ante PSL Jose Puente Installation
Laser Systems
22 Feb 2013
D1101121-v2 PSL/IO/TCS Chassis Name Plate Jose Puente Installation
Laser Systems
22 Feb 2013
E070079-v2 SUBSTRATE, ALIGO INPUT MODE CLEANER CURVED MIRROR (IMCC) Rodica Martin et al. Final Design
Input Optics
19 Feb 2013
E1300136-v1 aLigo TMS Telescope Mirrors & Packaging for Delivery to Local Coater Ken Mailand et al. Auxiliary Optics
Requirements
14 Feb 2013
D1200763-v2 Handle Gusset, aLIGO TCS Steering Mirror 2, H1-L1 Mindy Jacobson et al. Assembly
Installation
Cleaning
Auxiliary Optics
Vacuum
14 Feb 2013
D1002355-v2 SLC ACB 1 HOLE FINAL ASSY Niem Nguyen Modelling
Auxiliary Optics
13 Feb 2013
G1200075-v2 Relativity The Fun Stuff Gregory Mendell Public Talk / Colloquium
08 Feb 2013
T1200037-v1 Loss function for characterizing cavities Hiro Yamamoto Modelling
Core Optics
08 Feb 2013
D1002417-v4 aLIGO_Manifold Cryo Baffle_Upper Horizontal Weight Tim Nguyen Auxiliary Optics
Basic R&D
06 Feb 2013
G1300064-v1 Hunting for Black Holes in India Fred Raab Education, Outreach
06 Feb 2013
G1200501-v2 Multiwavelength Astronomy: Examples of Astronomy Observations Made with Different Kinds of Light Amber Stuver Astrophysics / Multi-messenger
Education, Outreach
05 Feb 2013
G1300055-v1 HankelIFO, simulations based on the Hankel transform Hiro Yamamoto Modelling
Core Optics
01 Feb 2013
D1000653-v4 TOP LEVEL ISC Equipment Block Diagram Rich Abbott et al. Conceptual Design
Sensing and Control
31 Jan 2013
G1300054-v2 Example and experience using SIS for aLIGO designing and commissioning Hiro Yamamoto Modelling
Core Optics
30 Jan 2013
D0902815-v3 aLIGO_Manifold_Cryo_Baffle_Suspension_Ring_Top Heidy Kelman et al. Auxiliary Optics
Basic R&D
28 Jan 2013
D0902816-v3 aLIGO_Manifold_Cryo_Baffle_Suspension_Ring_Bottom Heidy Kelman et al. Auxiliary Optics
Basic R&D
28 Jan 2013
D0902820-v3 aLIGO_Manifold_Cryo_Baffle_Blade_Spring_Shim Heidy Kelman et al. Auxiliary Optics
Basic R&D
28 Jan 2013
D1002404-v3 aLIGO_Manifold Cryo Baffle_Lower Horizontal Weight Tim Nguyen Basic R&D
Auxiliary Optics
28 Jan 2013
G1300050-v3 Output Mode Cleaners Keita Kawabe et al. Commissioning
28 Jan 2013
G1300047-v1 LIGO Hanford Outreach Opportunities for Rural Schools Dale Ingram Education, Outreach
24 Jan 2013
D1002608-v5 SLC ACB SUSPENSION BLADE Norris Kilpatrick et al. Auxiliary Optics
Modelling
18 Jan 2013
G1300030-v1 GEO 600 Status Hartmut Grote et al. Public Talk / Colloquium
14 Jan 2013
G1300031-v1 Squeezed Light Techniques for Gravitational Wave Detection Daniel Sigg Public Talk / Colloquium
14 Jan 2013
G1300027-v1 Advanced LIGO, for GWs: New Frontier, Seoul, 2013 David Shoemaker Public Talk / Colloquium
Detector
11 Jan 2013
D1201511-v2 aLIGO Pcal Tooling, Periscope Video Target Plate Craig Conley Auxiliary Optics
System Test
10 Jan 2013
G1300013-v1 LIGO Laboratory Distance Learning Opportunities for Schools Dale Ingram Education, Outreach
07 Jan 2013
D1100539-v2 aLIGO TCS .25'' Thick Optical Window Alexander Lynch et al. Final Design
Preliminary Design
Vacuum
Auxiliary Optics
Fabrication
07 Jan 2013
D1003054-v1 Feedthrough panel: double blank Daniel Sigg Basic R&D
07 Jan 2013
D0900170-v3 Faraday Isolator Earthquake Crossbar Assembly Manuel Ruiz et al. Basic R&D
Auxiliary Optics
03 Jan 2013
P1100166-v4 Controlling calibration errors in gravitational-wave detectors by precise location of calibration forces Hernan Daveloza et al. Modelling
Collaboration
Core Optics
Calibration
24 Dec 2012
D1100208-v5 ALIGO AOS Output Faraday Isolator Spacer (HAM5-L1) Manuel Ruiz Auxiliary Optics
Assembly
19 Dec 2012
D1100171-v5 ALIGO AOS Output Faraday Isolator Spacer (HAM5-H1) Manuel Ruiz Auxiliary Optics
Assembly
19 Dec 2012
G1201267-v1 Capitalizing on GW polarization bias for a pair of interferometric detectors to increase parameter estimation speed and the potential implications for cosmological models. Amber Stuver et al. Other data analysis
Modelling
GW source predictions
19 Dec 2012
D0900168-v6 Faraday Isolator Crossbar Plate Manuel Ruiz et al. Basic R&D
Auxiliary Optics
14 Dec 2012
D1100359-v4 SLC ACB ADJUSTABLE EXTENDER ASSY Niem Nguyen et al. Auxiliary Optics
Modelling
14 Dec 2012
G1201266-v1 Smoke, Mirrors, Big Bangs And Big Scientific Payoffs: An outline for using an interferometer network to conduct astronomy. Cristina Torres et al. Education, Outreach
Basic R&D
Detector
Commissioning
Public Talk / Colloquium
Data Analysis
13 Dec 2012
G1201279-v1 Searching for Gravitational Waves with LIGO Fred Raab Education, Outreach
10 Dec 2012
G1201272-v1 Introduction to State Space techniques Tobin Fricke Public Talk / Colloquium
06 Dec 2012
T1200450-v2 Cavity alignment fluctuations in the H2 One Arm Test Lisa Barsotti Commissioning
03 Dec 2012
G1200753-v1 aLIGO H2 One Arm Test Update Keita Kawabe et al. Detector
Commissioning
03 Dec 2012
D1101288-v4 AdLIGO Alignment Fixture, Tube-up Assembly Manuel Ruiz Assembly
Auxiliary Optics
29 Nov 2012
E1200366-v1 Shutter Controller Count Daniel Sigg Sensing and Control
Operations
27 Nov 2012
G1201211-v1 Flow diagrams for HEPI actuators, bleed and operate mode Brian Lantz et al. Seismic Isolation
Commissioning
Assembly
26 Nov 2012
G1200442-v1 Wideband, 3rd Generation, Gravitational-wave Antenna Rana Adhikari Basic R&D
Upgrades
26 Nov 2012
G1200573-v1 LIGO III Blue Concept Rana Adhikari Detector
Basic R&D
Upgrades
26 Nov 2012
T1200510-v1 MATH SCIENCE PARTNERSHIP EXTERNAL EVALUATION REPORT Dale Ingram Education, Outreach
21 Nov 2012
D1200586-v2 aLIGO_ITM Elliptical Lift Stand Extension Tube Tim Nguyen Modelling
Auxiliary Optics
21 Nov 2012
D0900579-v4 Faraday Isolator Blade Guard Assy Manuel Ruiz et al. Basic R&D
Auxiliary Optics
15 Nov 2012
D0900440-v4 Faraday Isolator TFP Polarizer Plate Assy Manuel Ruiz et al. Basic R&D
Auxiliary Optics
15 Nov 2012
D1001958-v5 D1001958_aLIGO_AOS_D0900623_Wire Support Block Assy Manuel Ruiz et al. Auxiliary Optics
Assembly
14 Nov 2012
D1100247-v3 AdLIGO_AOS_Output Faraday Isolator Baffle Manuel Ruiz Assembly
Auxiliary Optics
13 Nov 2012
D1201460-v1 aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations Craig Conley Commissioning
Installation
Integration
Auxiliary Optics
12 Nov 2012
D1201459-v1 aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations Craig Conley Integration
Auxiliary Optics
Commissioning
Installation
12 Nov 2012
T1200498-v1 Elementary Poster Teacher's Guide Dale Ingram Education, Outreach
09 Nov 2012
G1201180-v1 Elementary Classroom Poster Dale Ingram Education, Outreach
09 Nov 2012
D1201252-v1 aLIGO_SLC_ITM Elliptical BSC2 Variable Height Gauge Tim Nguyen Auxiliary Optics
Modelling
09 Nov 2012
D0900588-v6 Faraday Isolator Wire Adjustable Adapter Manuel Ruiz et al. Basic R&D
Auxiliary Optics
05 Nov 2012
D1201445-v1 OFI_1/2-20 Locked Nut Tim Nguyen Modelling
Auxiliary Optics
05 Nov 2012
T1200491-v1 Analysis of Rosin Core Solder for UHV Applications Rich Abbott et al. System Engineering
Cleaning
01 Nov 2012
D1201250-v1 aLIGO_SLC_ACB-ITM Elliptical_Suspension Rod Gauge Tim Nguyen Modelling
Auxiliary Optics
01 Nov 2012
T1200489-v1 Thermal effects of aLIGO BS Hiro Yamamoto Core Optics
Modelling
01 Nov 2012
D1101404-v3 Stiffener, Tube Up Manuel Ruiz et al. Assembly
Auxiliary Optics
01 Nov 2012
D1201442-v1 Air Bake Fixture, aLIGO TCS CO2P UHV Steering Mirror 1 Mindy Jacobson et al. Auxiliary Optics
Cleaning
Vacuum
Assembly
31 Oct 2012
D1201251-v1 aLIGO_SLC_ACB_ Variable Height Bracket, 9 Degree Jeffrey Lewis et al. Modelling
Auxiliary Optics
30 Oct 2012
D1201165-v1 AdLIGO_AOS_SLC_ACB Lower Left Mouse Hole Cover Tim Nguyen Auxiliary Optics
Modelling
26 Oct 2012
D1201164-v1 AdLIGO_AOS_SLC_ACB Lower Right Mouse Hole Cover Tim Nguyen Modelling
Auxiliary Optics
26 Oct 2012
D1100993-v2 NICKEL/COPPER ALLOY 400 .375-16 HEX NUT, MODIFIED Jesse Terrazas et al. Auxiliary Optics
Final Design
25 Oct 2012
D1200313-v5 ACB 1 HOLE LEFT QPD SKIN (w PD) Manuel Ruiz et al. Auxiliary Optics
Modelling
24 Oct 2012
D1200296-v5 ACB 1 HOLE RIGHT QPD SKIN (w PD) Manuel Ruiz et al. Modelling
Auxiliary Optics
24 Oct 2012
D1002225-v4 ESD Connector Flex Circuit Jack Davis et al. Auxiliary Optics
Conceptual Design
23 Oct 2012
T1200484-v1 The LSC White Paper on Education and Public Outreach 2012 - Public Release LSC Education, Outreach
21 Oct 2012
E0900073-v3 Advanced LIGO Beam Splitter (BS) Coating Specification Rand Dannenberg Core Optics
Final Design
20 Oct 2012
S1203493-v1 L1-MSR-07 IFO Front End Computers David Kinzel System Engineering
Operations
10 Oct 2012
S1203497-v1 L1-MSR-11 General Computing David Kinzel System Engineering
Operations
10 Oct 2012
S1203499-v1 L1-MSR-13 UPS for IFO and CDS Computers Rack David Kinzel Operations
System Engineering
10 Oct 2012
D070337-v8 Bottom Mass Assembly, HLTS Derek Bridges Suspensions
Final Design
09 Oct 2012
T1200472-v1 BS02 reflection and transmission maps' profile and effects Hiro Yamamoto Core Optics
Modelling
07 Oct 2012
D1001862-v6 Prism Base Support Manuel Ruiz et al. Auxiliary Optics
Basic R&D
03 Oct 2012
G1201058-v1 Cavity Error Calibration Notes for a Damped Triple Pendulum LVC Commissioning
Basic R&D
02 Oct 2012
D1001990-v3 Platform Walkway, BSC Installation Sam Barnum Seismic Isolation
Installation
01 Oct 2012
D1001700-v2 SLC INTERFACE MOUNTING CLAMP Niem Nguyen Modelling
Auxiliary Optics
Fabrication
27 Sep 2012
D1201109-v1 aLIGO ITM Elliptical Baffle Tooling_Baffle Box Prop Tim Nguyen Modelling
Auxiliary Optics
27 Sep 2012
D1201030-v1 ACB Tooling, Adjustable Post Tim Nguyen Auxiliary Optics
Modelling
27 Sep 2012
D1201080-v1 ACB Tooling, Extended Joint Tim Nguyen Auxiliary Optics
Modelling
27 Sep 2012
D1002098-v2 aLIGO_TMS_TEST_MASS_PLATE Ken Mailand Auxiliary Optics
Final Design
25 Sep 2012
T1100343-v3 ISC 4 channel differential to single ended converter chassis test procedure Rich Abbott Sensing and Control
Subsystem Test
24 Sep 2012
D0900359-v3 Wedged Prism Assy Niem Nguyen et al. Auxiliary Optics
Modelling
21 Sep 2012
D1002364-v3 ALIGO_AOS_D0900623_Faraday Isolator Beam Dump Assy Manuel Ruiz et al. Auxiliary Optics
Basic R&D
20 Sep 2012
D1002100-v2 aLIGO_TMS_TEST_MASS_SHORTBAR Ken Mailand Final Design
Auxiliary Optics
20 Sep 2012
D1002099-v1 aLIGO_TMS_ TEST_MASS_LONGBAR Ken Mailand Auxiliary Optics
Preliminary Design
19 Sep 2012
D1101427-v4 BRACE, LIFTING, ARM CAVITY BAFFLE Manuel Ruiz Assembly
Auxiliary Optics
19 Sep 2012
D1201230-v1 aLIGO_SLC_Half Pound Balance Weight Tim Nguyen Auxiliary Optics
Modelling
19 Sep 2012
P1200119-v1 LIGO Magazine, issue 1/2012 Andreas Freise Other data analysis
Installation
Education, Outreach
Suspensions
19 Sep 2012
D1201154-v1 SLC INTERFACE MOUNTING CLAMP_SMALL Tim Nguyen Modelling
Auxiliary Optics
14 Sep 2012
D1001621-v5 SLC ARM CAVITY BAFFLE UPPER MTG HINGE Niem Nguyen et al. Fabrication
Auxiliary Optics
Modelling
12 Sep 2012
D0900169-v4 Faraday Isolator Crossbar Side Manuel Ruiz Basic R&D
Auxiliary Optics
12 Sep 2012
D030025-v1 Screw, Socket Head Cap, #8-32 UNC-2A X 1 Long, Fully Threaded, Rounded End, Ag-Plated Derek Bridges Fabrication
System Engineering
09 Sep 2012
D1000909-v3 SLC COPPER PLATE Niem Nguyen et al. Modelling
Auxiliary Optics
07 Sep 2012
T1200199-v2 Instrument Science White Paper LSC Input Optics
Auxiliary Optics
Core Optics
Basic R&D
Suspensions
Detector
Sensing and Control
Laser Systems
Upgrades
Seismic Isolation
30 Aug 2012
T1200424-v1 Setting up the Physical Environment Monitoring System for Advanced LIGO Maggie Tse Commissioning
29 Aug 2012
E1200786-x0 DCN for BSC-ISI Stage1 Add Dampers and remove Trim mass Sam Barnum Sensing and Control
Upgrades
28 Aug 2012
G1200826-v1 ISC Modeling Meeting - Aug 24, 2012 Lisa Barsotti Modelling
24 Aug 2012
D1200681-v4 aLIGO Photon Calibrator Laser Mounting Block Jonathan Berliner Auxiliary Optics
21 Aug 2012
D1200873-v1 aLIGO_High Power viewport Guard Tim Nguyen Modelling
Auxiliary Optics
21 Aug 2012
T1200400-x0 Magnetic Modeling in ANSYS Workbench (version 13.0) Jeffrey Kissel Modelling
Suspensions
20 Aug 2012
D1000225-v7 CUSTOM CABLE V25A-TBD (Various Lengths to be determined at manuf.) Benjamin Abbott et al. Fabrication
Sensing and Control
15 Aug 2012
D1200920-v1 AdLIGO_AOS_SLC ACB BSC3 H1-L1, INTERFACE MOUNTING PLATE Tim Nguyen Modelling
Auxiliary Optics
14 Aug 2012
D1200903-v1 SLC ARM CAVITY BAFFLE_BSC1 H1-L1 INTERFACE MOUNTING PLATE Tim Nguyen Modelling
Auxiliary Optics
14 Aug 2012
D1102073-v1 aLIGO ITM Elliptical Baffle_ ALIGNMENT CROSSHAIR TARGET Tim Nguyen Auxiliary Optics
Modelling
13 Aug 2012
G1200797-v1 The "Sound" of Redshift Amber Stuver Astrophysics / Multi-messenger
Education, Outreach
10 Aug 2012
D1100075-v3 SLC ACB ENAMEL HANGING FIXTURE ASSY Niem Nguyen et al. Basic R&D
Auxiliary Optics
10 Aug 2012
T070304-v1 Vibration Transmission to OMC Bench via Cabling Norna Robertson Modelling
Suspensions
08 Aug 2012
S1202957-x0 L1-FAC-YC1 David Kinzel System Engineering
Operations
08 Aug 2012
S1202950-x0 L1-FAC-XC1 David Kinzel System Engineering
Operations
08 Aug 2012
D1201128-x0 aLIGO ITM Elliptical Tooling_Lower tube Height Gauge Tim Nguyen Auxiliary Optics
Modelling
07 Aug 2012
G1200778-v1 Einstein's Messengers Classroom Poster Dale Ingram Education, Outreach
01 Aug 2012
G1200779-v1 Einstein's Messengers Promotional Flyer Dale Ingram Education, Outreach
01 Aug 2012
G1200777-v1 LHO Field Trip Brochure Dale Ingram Education, Outreach
01 Aug 2012
G1200769-v1 Squeezing in Gravitational Wave Detectors Lisa Barsotti Public Talk / Colloquium
30 Jul 2012
D1101489-v16 LASTI Wiring Diagram Sam Waldman et al. Installation
20 Jul 2012
G1200743-v1 An Overview of Advanced LIGO Interferometry Luca Matone et al. Education, Outreach
Sensing and Control
Detector Characterization
18 Jul 2012
D1200795-v1 Breakout Board - DB9 Tobin Fricke System Test
Subsystem Test
18 Jul 2012
D0900357-v2 Faraday Isolator Wedged Prism Holder Niem Nguyen Final Design
Auxiliary Optics
17 Jul 2012
T1200351-v1 Correction to the inspiral range calculation in GWINC Peter Fritschel et al. GW source predictions
Modelling
Compact Binaries
16 Jul 2012
D1002521-v4 CUSTOM CABLE V25G-90 Jay Heefner et al. Fabrication
Suspensions
13 Jul 2012
D1000236-v3 CUSTOM CABLE V25Z-60 Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000562-v5 CUSTOM CABLE V25AM-23-A Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000563-v5 CUSTOM CABLE V25AM-23-B Jay Heefner et al. Fabrication
Suspensions
13 Jul 2012
D1000564-v5 CUSTOM CABLE V25AM-33-A Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000566-v6 CUSTOM CABLE V25G Jay Heefner et al. Fabrication
Suspensions
13 Jul 2012
D1200835-v1 aLIGO_AOS_SLC_ACB, Two Pound Weight Tim Nguyen Modelling
Auxiliary Optics
06 Jul 2012
D1000565-v6 CUSTOM CABLE V25AM-33-B Jay Heefner et al. Fabrication
Suspensions
05 Jul 2012
G1200709-v3 Advanced LIGO, for MG13 Stockholm David Shoemaker Public Talk / Colloquium
Detector
05 Jul 2012
G1200689-v1 Squeezed Light Techniques for Gravitational Wave Detection Daniel Sigg Public Talk / Colloquium
03 Jul 2012
G1200688-v1 Squeezed Light Techniques for Gravitational Wave Detection Daniel Sigg Public Talk / Colloquium
02 Jul 2012
G1200687-v1 Status of Ground-Based Gravitational-Wave Interferometers Daniel Sigg Public Talk / Colloquium
02 Jul 2012
T080230-v3 Quad Pendulum Structure Pushers Calum Torrie et al. Installation
02 Jul 2012
D1100352-v5 SLC ACB LO CAPTURED PLATE Niem Nguyen Modelling
Auxiliary Optics
26 Jun 2012
D1100347-v6 SLC ACB UPPER CAPTURED PLATE Niem Nguyen Auxiliary Optics
Modelling
25 Jun 2012
G1200695-v1 Pre-tour Introduction to LIGO (technical edition) Fred Raab Education, Outreach
22 Jun 2012
D0902654-v3 aLIGO_Manifold_Cryo_Baffle_Subassembly_Weldment_Right Heidy Kelman Basic R&D
Auxiliary Optics
22 Jun 2012
D020234-v2 Metal Lower Mass (MC), HSTS Michael Meyer Final Design
Suspensions
21 Jun 2012
D030078-v2 Add-on Mass, 20g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020351-v2 Add-on Mass, 50g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020350-v3 Add-on Mass, 100g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020661-v1 Magnet-Standoff Assembly, Intermediate Mass Michael Meyer Suspensions
Final Design
21 Jun 2012
E1000065-v6 aLIGO TCS CO2 Laser Specification Mindy Jacobson et al. Final Design
Preliminary Design
Auxiliary Optics
20 Jun 2012
D1000224-v5 CUSTOM CABLE V25D - v5 Rich Abbott et al. Sensing and Control
Fabrication
20 Jun 2012
G1200697-v1 SolidWorks summit presentation Bobby Moore Education, Outreach
20 Jun 2012
P1200071-v1 Optical System Design of Laser Interferometer for Gravitational Wave Detection Hiro Yamamoto Core Optics
Public Talk / Colloquium
19 Jun 2012
D1200878-v1 aLIGO Pcal Laser Shutter Hex Post Jonathan Berliner Modelling
Laser Systems
Assembly
Fabrication
Auxiliary Optics
Calibration
12 Jun 2012
D1002582-v3 SLC BAFFLE TUBE UP ASSY Niem Nguyen et al. Auxiliary Optics
Modelling
11 Jun 2012
G1200580-v2 Laser Interferometers for Gravitational-Wave Detection Fred Raab Education, Outreach
Detector
11 Jun 2012
D1002561-v3 SLC DAMPING 8 INCHES DIA TUBE Niem Nguyen Auxiliary Optics
Modelling
11 Jun 2012
T1200285-v1 Description of the Sensor Correction FIR & IIR Filter Components Brian Lantz Commissioning
Seismic Isolation
06 Jun 2012
D0902025-v3 Upper AOSEM Mounting Bracket, Intermediate Mass, HLTS Derek Bridges Preliminary Design
Suspensions
04 Jun 2012
D0901493-v3 Lower AOSEM Mounting Bracket, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
04 Jun 2012
E1100688-v1 OBSOLETE: aLIGO PRM and SRM TIlt Angles Michael Smith Modelling
System Engineering
31 May 2012
D1200765-v1 Handle, aLIGO TCS Steering Mirror 2, H1-L1 Mindy Jacobson Assembly
Installation
Vacuum
Cleaning
Auxiliary Optics
31 May 2012
D1200764-v1 Support Web, aLIGO TCS Steering Mirror 2, H1-L1 Mindy Jacobson Vacuum
Cleaning
Auxiliary Optics
Assembly
Installation
31 May 2012
G1200565-v1 All about Optics GariLynn Billingsley et al. Basic R&D
Cleaning
Core Optics
Modelling
29 May 2012
D070442-v7 Structural Weldment, HLTS Derek Bridges et al. Suspensions
Final Design
29 May 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Seismic Isolation
Subsystem Test
24 May 2012
G1200558-v1 GWADW 2012: Setting the Stage David Reitze Basic R&D
Detector
Public Talk / Colloquium
24 May 2012
G1200548-v1 Optical simulations within and beyond the paraxial limit Daniel Brown et al. Modelling
24 May 2012
G1200547-v2 The Study of Evanescent-Wave Heat Transfer in a Parallel Plane Geometry Richard Ottens et al. Public Talk / Colloquium
24 May 2012
D1200762-v1 TCS H1-L1 SM2 SPLASH COVER Mindy Jacobson Assembly
Installation
Auxiliary Optics
Cleaning
Vacuum
24 May 2012
D1000974-v6 SLC ARM CAVITY BAFFLE TOP SKIN Niem Nguyen Auxiliary Optics
Fabrication
Modelling
18 May 2012
E0900349-v12 ETM Telescope Secondary Parabolic Mirror, ADLIGO Michael Smith et al. Final Design
Auxiliary Optics
15 May 2012
D1000229-v4 CUSTOM CABLE V25P Jay Heefner et al. Suspensions
Fabrication
14 May 2012
T1200200-v1 H2 One Arm Test Beam Geometry Keita Kawabe et al. Commissioning
07 May 2012
T080096-v1 Wire Attachment Points and Flexure Corrections Norna Robertson et al. Subsystem Test
Suspensions
Modelling
04 May 2012
D1000226-v2 CUSTOM CABLE V25F Benjamin Abbott et al. Seismic Isolation
Fabrication
03 May 2012
D1000395-v2 aLIGO INTERMEDIATE TOP MASS SPACER Ignacio Romero Auxiliary Optics
Conceptual Design
01 May 2012
D0902722-v4 Sapphire Prism Holder Extension Derek Bridges Suspensions
Final Design
30 Apr 2012
G1200499-v1 Multi-messenger Astronomy: Expanding Astronomy's "Senses" Amber Stuver Astrophysics / Multi-messenger
Public Talk / Colloquium
Education, Outreach
30 Apr 2012
D0902664-v3 Sapphire Prism Holder, HLTS Derek Bridges Suspensions
Final Design
30 Apr 2012
D0902663-v3 Sapphire Prism Holder Assembly, HLTS Derek Bridges Final Design
Suspensions
30 Apr 2012
D0902666-v3 Bonding Template Side, Sapphire Prism, HLTS Derek Bridges Suspensions
Final Design
30 Apr 2012
G1200488-v1 LHO Outreach Presentation to WSU GEAR UP Dale Ingram Education, Outreach
27 Apr 2012
T1000075-v2 Advanced Interferometer Configurations White Paper Rana Adhikari et al. Basic R&D
Integration
System Engineering
Upgrades
Sensing and Control
26 Apr 2012
D1000242-v3 aLIGO_ETM_TELE_TUBE_THD_INSERT Craig Conley Fabrication
Auxiliary Optics
Final Design
25 Apr 2012
T1000090-v5 advanced LIGO baffle design using SIS Hiro Yamamoto Core Optics
Modelling
25 Apr 2012
G1100863-v1 An Overview of Control Theory and Digital Signal Processing Luca Matone Detector
Education, Outreach
24 Apr 2012
T080144-v1 The Enhanced LIGO Output Mode Cleaners Sam Waldman Commissioning
Sensing and Control
24 Apr 2012
D1101289-v3 AdLIGO Support, Tube-up Manuel Ruiz Auxiliary Optics
Assembly
19 Apr 2012
D1100427-v2 ALIGO SRM AR BAFFLE PLATE Carrie Wilkerson et al. Modelling
19 Apr 2012
D0900048-v3 Faraday Isolator Damper Holder Assembly Manuel Ruiz Basic R&D
Auxiliary Optics
19 Apr 2012
D0900026-v3 Faraday Isolator Damper Mounting Plate Manuel Ruiz Auxiliary Optics
Basic R&D
19 Apr 2012
D1101290-v2 AdLIGO Brace, Tube-up Manuel Ruiz Auxiliary Optics
Assembly
18 Apr 2012
T1100286-v2 Methanol Spray Optic Cleaning Procedure Margot Hennig Auxiliary Optics
Input Optics
Cleaning
17 Apr 2012
T1200083-v1 aLIGO Kepco DC Power Supply Acceptance Testing Scripts Carl Adams Incoming Inspection
16 Apr 2012
T1200172-v2 Installation and testing of L1 PSL table legs Riccardo DeSalvo et al. Laser Systems
Commissioning
15 Apr 2012
T1200171-v1 Status of acoustic isolation of the H2 PSL enclosure Robert Schofield System Test
13 Apr 2012
D1000410-v3 aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_LEFT_SIDE_TRAY Craig Conley Auxiliary Optics
Suspensions
12 Apr 2012
D1100425-v2 aLIGO SRM AR BAFFLE, TOP SUPPORT BAR Carrie Wilkerson et al. Modelling
11 Apr 2012
E1200364-v1 Shutter Controller Specifications Daniel Sigg Sensing and Control
Operations
10 Apr 2012
E1200360-v1 Picomotor Controller Specifications Daniel Sigg Operations
Sensing and Control
10 Apr 2012
E1200354-x0 aLIGO, Slow Controls, Concentrators, Serial Ports Daniel Sigg Operations
Sensing and Control
10 Apr 2012
T080266-v1 Suspending optics on steel wire loops Norna Robertson et al. Basic R&D
Suspensions
02 Mar 2009
G1200204-v2 Network-enabled access to globally distributed data: LIGO-India Roy Williams Public Talk / Colloquium
LIGO-India
09 Apr 2012
D0902444-v2 HLTS Positioning Standoff, Intermediate Magnet Placement Fixture Derek Bridges Suspensions
Final Design
03 Apr 2012
D070321-v2 Earthquake Stop Bridge Crossbar, HLTS Derek Bridges Suspensions
Final Design
02 Apr 2012
D0901875-v1 Breakout Board - SCSI 68 David Kinzel Subsystem Test
System Test
02 Apr 2012
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Fabrication
Computing/archiving
Data and Computing
Basic R&D
Requirements
Integration
Calibration
Other data analysis
Conceptual Design
Preliminary Design
Upgrades
Data Acquisition System
Sensing and Control
System Test
Observatory Facilities
Data quality / vetoes
01 Apr 2012
E080228-v1 L1 HAM6 ISI Mass Layout (As-Leveled) Michael Meyer Seismic Isolation
Commissioning
01 Apr 2012
E070085-v2 Coated Substrate, ALIGO INPUT MODE CLEANER FLAT MIRROR (IMCF) Rodica Martin Activity
Input Optics
01 Apr 2012
D1001973-v3 aLIGO TMS FOCUS SCREW Michael Miller et al. Final Design
Fabrication
Auxiliary Optics
29 Mar 2012
D0901419-v2 Lower Loop Wire Jig Assembly (HLTS) Derek Bridges Suspensions
Final Design
27 Mar 2012
D0900630-v2 Intermediate Wire Jig Assembly, HLTS Derek Bridges et al. Suspensions
Final Design
27 Mar 2012
D0900594-v2 Upper Wire Jig Assembly, HLTS Michael Meyer Final Design
Suspensions
24 Mar 2012
D0900689-v2 Base Plate, Library of Clamps, Lower Blade, HLTS Derek Bridges Suspensions
Preliminary Design
24 Mar 2012
D0900680-v2 Blade Clamp (3.5 Degree), Upper Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
22 Mar 2012
D0900679-v2 Blade Clamp (3.0 Degree), Upper Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
22 Mar 2012
D0900678-v2 Blade Clamp (2.5 Degree), Upper Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
22 Mar 2012
D0900677-v2 Blade Clamp (2.0 Degree), Upper Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
22 Mar 2012
D0900676-v2 Blade Clamp (1.5 Degree), Upper Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
22 Mar 2012
D0900675-v2 Blade Clamp (1.0 Degree), Upper Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
22 Mar 2012
D0900674-v2 Blade Clamp (0.5 Degree), Upper Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
22 Mar 2012
D0900673-v3 Blade Clamp (3.5 Degree), Upper Blade, Inside, HLTS Derek Bridges Final Design
Suspensions
22 Mar 2012
D0900672-v3 Blade Clamp (3.0 Degree), Upper Blade, Inside, HLTS Derek Bridges Suspensions
Final Design
22 Mar 2012
D0900671-v3 Blade Clamp (2.5 Degree), Upper Blade, Inside, HLTS Derek Bridges Suspensions
Final Design
22 Mar 2012
D0900670-v3 Blade Clamp (2.0 Degree), Upper Blade, Inside, HLTS Derek Bridges Final Design
Suspensions
22 Mar 2012
D0900669-v3 Blade Clamp (1.5 Degree), Upper Blade, Inside, HLTS Derek Bridges Final Design
Suspensions
22 Mar 2012
D0900668-v3 Blade Clamp (1.0 Degree), Upper Blade, Inside, HLTS Derek Bridges Final Design
Suspensions
22 Mar 2012
D0900667-v3 Blade Clamp (0.5 Degree), Upper Blade, Inside, HLTS Derek Bridges Final Design
Suspensions
22 Mar 2012
D0900665-v3 Library of Clamps, Upper Blade, HLTS Derek Bridges Suspensions
Final Design
22 Mar 2012
D080267-v2 Top Bridge, Upper Blade Bake Fixture, HLTS Derek Bridges Suspensions
Final Design
22 Mar 2012
D080268-v2 Base Plate, Upper Blade Bake Fixture, HLTS Derek Bridges Suspensions
Final Design
22 Mar 2012
D080265-v3 Upper Blade Bake Fixture, HLTS Derek Bridges et al. Suspensions
Final Design
22 Mar 2012
T1200147-v1 IO Chassis Temperature Study Rich Abbott et al. System Engineering
System Test
22 Mar 2012
D0901241-v2 Earthquake Stop Mount, Bridge, HLTS Derek Bridges Final Design
Suspensions
19 Mar 2012
D070310-v2 Top Blade Guard Bar, HLTS Derek Bridges Final Design
Suspensions
19 Mar 2012
D070309-v2 Top Blade Guard Riser, HLTS Derek Bridges Suspensions
Final Design
19 Mar 2012
D0901286-v2 Secondary Metal Prism Breakoff, HLTS Michael Meyer et al. Final Design
Suspensions
18 Mar 2012
D070338-v4 Metal Bottom Mass, HLTS Derek Bridges Suspensions
Preliminary Design
17 Mar 2012
D080238-v2 Collar, Lower, 900g, Intermediate Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D080236-v2 Collar, Lower, 700g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080234-v2 Collar, Lower, 500g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080232-v2 Collar, Lower, 300g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080183-v2 Collar, Lower, 100g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080229-v2 Collar, Upper, 900g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080227-v2 Collar, Upper, 700g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D080225-v2 Collar, Upper, 500g, Intermediate Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D080223-v2 Collar, Upper, 300g, Intermediate Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D080182-v2 Collar, Upper, 100g, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D030155-v2 Center Offset, Intermediate Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D970075-v2 Dumbbell Standoff Calum Torrie Suspensions
Final Design
17 Mar 2012
D070336-v3 Main Section, Intermediate Mass, HLTS Derek Bridges Preliminary Design
Suspensions
17 Mar 2012
D070585-v4 Upper Clamp, Intermediate Wire, Inside, HLTS Derek Bridges Suspensions
Final Design
17 Mar 2012
D070394-v3 Upper Clamp, Intermediate Wire, Outside, HLTS Michael Meyer Final Design
Suspensions
17 Mar 2012
D030149-v2 Intermediate Wire Breakoff, Intermediate Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D070405-v3 Lower Clamp, Intermediate Wire, Inside, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D070406-v3 Lower Clamp, Intermediate Wire, Outside, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D080263-v2 Additional Mass Disk, 150g Derek Bridges Suspensions
Preliminary Design
17 Mar 2012
D070333-v2 Additional Mass Disk, 100g Derek Bridges Suspensions
Preliminary Design
17 Mar 2012
D0901405-v2 Additional Mass Disk, 50g Derek Bridges Preliminary Design
Suspensions
17 Mar 2012
D030139-v2 Roll Offset, T-Piece, Upper Mass, HLTS Derek Bridges Final Design
Suspensions
17 Mar 2012
D020615-v4 Lower Blade, HLTS Michael Meyer et al. Suspensions
Final Design
16 Mar 2012
D020652-v2 C-Clamp, Upper Mass, HLTS Derek Bridges Suspensions
Final Design
16 Mar 2012
D070341-v3 Upper Clamp, Upper Wire, Outside, HLTS Derek Bridges Final Design
Suspensions
16 Mar 2012
D020601-v2 Blade Clamp (0.0 Degree), Upper Blade, Outside, HLTS Michael Meyer et al. Suspensions
Preliminary Design
16 Mar 2012
D020617-v2 Upper Blade, HLTS Calum Torrie et al. Final Design
Suspensions
16 Mar 2012
D020622-v3 Blade Clamp (0.0 Degree), Upper Blade, Inside, HLTS Michael Meyer et al. Final Design
Suspensions
16 Mar 2012
D070331-v3 Shim, 1.0mm, Upper Blade, HLTS Derek Bridges Final Design
Suspensions
16 Mar 2012
D070460-v2 Earthquake Stop Mount, Long, HLTS Derek Bridges Final Design
Suspensions
14 Mar 2012
D070322-v2 Earthquake Stop Bracket, Long, HLTS Derek Bridges Suspensions
Final Design
14 Mar 2012
D070319-v2 Earthquake Stop Assembly, Bridge, HLTS Derek Bridges Suspensions
Final Design
14 Mar 2012
D0901553-v4 Lower AOSEM Alignment Assembly, Bottom Mass, HLTS Bobby Moore et al. Suspensions
Final Design
14 Mar 2012
D0901552-v4 Upper AOSEM Alignment Assembly, Bottom Mass, HLTS Bobby Moore et al. Suspensions
Final Design
14 Mar 2012
D080677-v4 Coil Holder Assembly, HLTS Derek Bridges Preliminary Design
Suspensions
13 Mar 2012
D1000409-v3 aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_RIGHT_SIDE_TRAY Craig Conley Suspensions
Auxiliary Optics
13 Mar 2012
D1000408-v3 aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_LEFT_SIDE_BRACKET Craig Conley Auxiliary Optics
13 Mar 2012
D1000407-v3 aLIGO_OSEMS_INTERMIDIATE_SUPPORT_RIGHT_SIDE_BRACKET Craig Conley Auxiliary Optics
13 Mar 2012
D070436-v4 Lower Loop Wire Assembly, HLTS Derek Bridges Suspensions
Final Design
12 Mar 2012
D070393-v3 Intermediate Wire Assembly, HLTS Derek Bridges Final Design
Suspensions
12 Mar 2012
D070335-v6 Upper Mass Assembly, HLTS Derek Bridges Suspensions
Preliminary Design
12 Mar 2012
D070334-v4 Intermediate Mass Assembly, HLTS Derek Bridges Final Design
Suspensions
12 Mar 2012
D070340-v3 Upper Wire Assembly, HLTS Derek Bridges Final Design
Suspensions
12 Mar 2012
D070328-v2 Rotating Plate, Rotational Adjuster, HLTS Derek Bridges Final Design
Suspensions
12 Mar 2012
D070326-v4 Rotational Adjuster, HLTS Derek Bridges Final Design
Suspensions
12 Mar 2012
D070374-v2 Mounting Pad Body, HLTS Derek Bridges Suspensions
Final Design
12 Mar 2012
D1000973-v8 SLC ARM CAVITY BAFFLE SKIN Niem Nguyen Modelling
Fabrication
Auxiliary Optics
12 Mar 2012
D1100074-v4 SLC ACB INNER SKIN PORCELAIN HANGING FIXTURE Niem Nguyen Auxiliary Optics
Modelling
12 Mar 2012
T0900285-v2 L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) Jeffrey Kissel Commissioning
Requirements
Final Design
Seismic Isolation
12 Mar 2012
D1001365-v6 SLC ARM CAVITY BAFFLE MIDDLE REINFORCING PLATE Niem Nguyen Modelling
Auxiliary Optics
Fabrication
12 Mar 2012
D1000071-v3 TRANSMON_TELE_END_PLATE_ENTRY_3_TUBE Ignacio Romero Basic R&D
Auxiliary Optics
01 Mar 2012
D1000070-v2 TRANSMON_TELE_END_PLATE_PRIMARY_3_TUBE Ignacio Romero Auxiliary Optics
Basic R&D
01 Mar 2012
G1200064-v1 Squeezed Light Techniques for Gravitational Wave Detection Daniel Sigg Public Talk / Colloquium
01 Mar 2012
D1100288-v4 SLC ACB TOP EXTENDER Niem Nguyen Modelling
Auxiliary Optics
29 Feb 2012
D1001363-v4 SLC ARM CAVITY BAFFLE SIDE REINFORCING HATSECTION Niem Nguyen Modelling
Auxiliary Optics
29 Feb 2012
D1001027-v5 SLC ARM CAVITY BAFFLE LOWER LEAF Niem Nguyen Modelling
Fabrication
Auxiliary Optics
29 Feb 2012
D1001026-v5 SLC ARM CAVITY BAFFLE UPPER LEAF Niem Nguyen Modelling
Fabrication
Auxiliary Optics
29 Feb 2012
D1000976-v4 SLC ARM CAVITY BAFFLE CENTER SKIN Niem Nguyen Fabrication
Auxiliary Optics
Modelling
29 Feb 2012
D1000975-v4 SLC ARM CAVITY BAFFLE BOTTOM SKIN Niem Nguyen Auxiliary Optics
Fabrication
Modelling
29 Feb 2012
T1200062-v1 Characteristics of ETM05 with LMA coating Hiro Yamamoto Modelling
Core Optics
29 Feb 2012
D080727-v3 Earthquake Stop Assembly, Long Bracket, HLTS Derek Bridges Suspensions
Final Design
29 Feb 2012
D080726-v3 Earthquake Stop Assembly, Long Mount, HLTS Derek Bridges Preliminary Design
Suspensions
29 Feb 2012
D070308-v3 Top Blade Guard Assembly, HLTS Derek Bridges Suspensions
Final Design
28 Feb 2012
P1200020-x0 Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform Jeffrey Kissel et al. Final Design
Seismic Isolation
Requirements
Subsystem Test
Commissioning
27 Feb 2012
D070327-v2 Base Plate, Rotational Adjuster, HLTS Derek Bridges Suspensions
Preliminary Design
23 Feb 2012
T0900508-v1 LLO OMC Mode Matching Katherine Dooley Modelling
Conceptual Design
Commissioning
Auxiliary Optics
23 Feb 2012
T1200082-v1 Beckhoff Breakout Box Stephen O'Connor Auxiliary Optics
Requirements
Fabrication
23 Feb 2012
D070332-v6 HLTS Suspension Assembly Derek Bridges Suspensions
Preliminary Design
21 Feb 2012
T1100455-v2 Analysis of position/voltage data on a BOSEM Mark Barton et al. Subsystem Test
Suspensions
21 Feb 2012
T0900325-v2 H1 Squeezer Noise Model Daniel Sigg et al. Basic R&D
Sensing and Control
16 Feb 2012
D0902507-v6 Fibre guard Main Body Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902519-v4 aLIGO SUS, Fibre guard angle section 11 Marielle van Veggel et al. Suspensions
Final Design
13 Feb 2012
D0902518-v4 aLIGO SUS, Fibre guard angle section 10 Marielle van Veggel et al. Suspensions
Final Design
13 Feb 2012
D0902517-v4 aLIGO SUS,Fibre guard angle section 9 Marielle van Veggel et al. Suspensions
Final Design
13 Feb 2012
D0902508-v5 aLIGO SUSFibre guard Separator Marielle van Veggel et al. Suspensions
Final Design
13 Feb 2012
D0902516-v4 aLIGO SUS,Fibre guard angle section 8 Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
T1200079-x0 LLO Beam Tube Enclosure Inspection Report Michael Meyer Vacuum
Operations
10 Feb 2012
T1200076-x0 ETM HWS EtherCAT breakout box Stephen O'Connor Auxiliary Optics
Fabrication
Requirements
09 Feb 2012
D0902515-v3 Fibre guard angle section 7 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902514-v3 Fibre guard angle section 6 Marielle van Veggel et al. Suspensions
Preliminary Design
09 Feb 2012
D0902512-v6 Fibre guard angle section 4 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902510-v3 Fibre guard angle section 2 Marielle van Veggel et al. Suspensions
Preliminary Design
09 Feb 2012
D0902509-v3 Fibre guard angle section 1 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0901461-v2 HLTS Magnet Placement Fixture, Intermediate Mass Derek Bridges Suspensions
Final Design
09 Feb 2012
T1200072-v1 Test Proceedure ETM: Hartman Sensor Power Supply Stephen O'Connor Requirements
Fabrication
Auxiliary Optics
08 Feb 2012
G050239-v1 Suspension Modeling in Mathematicaâ„¢ Mark Barton Suspensions
Modelling
06 Feb 2012
D0902623-v3 aLIGO_Manifold_Cryo_Baffle_Inner_Segment_Bottom Heidy Kelman Basic R&D
Auxiliary Optics
02 Feb 2012
D0902622-v3 aLIGO_Manifold_Cryo_Baffle_Inner_Segment_Left Heidy Kelman Auxiliary Optics
Basic R&D
02 Feb 2012
D0902619-v3 aLIGO_Manifold_Cryo_Baffle_Inner_Segment_Right Heidy Kelman Auxiliary Optics
Fabrication
02 Feb 2012
D1002030-v3 Front Panel for Quad I&Q Demodulator Module Charles Osthelder Fabrication
01 Feb 2012
D1000883-v2 SLC FOLD MIRROR ELLIPTICAL BAFFLE PLATE Niem Nguyen Modelling
Auxiliary Optics
31 Jan 2012
T1200036-x0 Aliasing effect in FFT simulation Hiro Yamamoto Core Optics
Modelling
26 Jan 2012
D1001727-v3 aLIGO TCS CO2 Laser In-Vacuum Steering Mirror Mindy Jacobson Vacuum
Auxiliary Optics
Preliminary Design
24 Jan 2012
D1200122-v1 Handle for Cleaning the H2 UHV 12" Steering Mirror Mindy Jacobson et al. Vacuum
Cleaning
Auxiliary Optics
24 Jan 2012
D1100327-v4 SLC ACB LEFT SIDE SHELF Niem Nguyen Modelling
Auxiliary Optics
23 Jan 2012
T1200013-v2 Mode mixing and beam size in a FP cavity with imperfect surface Hiro Yamamoto Modelling
Core Optics
11 Jan 2012
D1002402-v3 aLIGO_Manifold Cryo Baffle_Balance Weight Assy Tim Nguyen Auxiliary Optics
Basic R&D
10 Jan 2012
D1200057-v1 aLIGO High Quality 6in, Non wedged Viewport Mockup Tim Nguyen Auxiliary Optics
Modelling
09 Jan 2012
T1100062-v6 aLIGO I&Q Demodulator Test Procedure Rich Abbott et al. Sensing and Control
Subsystem Test
09 Jan 2012
D1003209-v2 aLIGO TCS Clamping Flange, CO2 Laser Projection Viewport Enclosure Mindy Jacobson et al. Vacuum
Auxiliary Optics
Final Design
Preliminary Design
09 Jan 2012
C1107670-v3 Statement of Work - Cleaning of LHO Mode Cleaner Tube Baffles parts Lisa Austin Cleaning
Auxiliary Optics
04 Jan 2012
D0900583-v4 Faraday Isolator Music Wire Split Clamp 2 Manuel Ruiz Basic R&D
Auxiliary Optics
30 Dec 2011
D1000429-v1 SLC FM ELLIPTICAL BAFFLE ASSY Calum Torrie Auxiliary Optics
Modelling
30 Dec 2011
D0901079-v2 HLTS Upper Wire Lower Clamp Assembly Derek Bridges Preliminary Design
Suspensions
23 Dec 2011
D1003206-v3 aLIGO TCS Viewports Enclosure Front Wall, CO2 Laser Projection Mindy Jacobson et al. Preliminary Design
Final Design
Auxiliary Optics
Vacuum
19 Dec 2011
D0902661-v3 Sapphire Prism Bonding Jig, HLTS Derek Bridges Final Design
Suspensions
19 Dec 2011
D0902662-v3 Sapphire Prism Bonding Fixture, HLTS Derek Bridges Suspensions
Final Design
19 Dec 2011
D1001133-v2 HAM Suspension Testing Cover Derek Bridges Subsystem Test
Suspensions
Final Design
19 Dec 2011
D1000977-v5 aLIGO AOS, SLC ARM CAVITY BAFFLE BOX ASSY Niem Nguyen Modelling
Fabrication
Auxiliary Optics
19 Dec 2011
D0901376-v4 SLC 2 HOLE ARM CAVITY BAFFLE FINAL ASSY Niem Nguyen et al. Auxiliary Optics
Fabrication
Modelling
16 Dec 2011
E1101200-v1 6in VP Type 1 Run Numbers-Serial Numbers Michael Smith Incoming Inspection
15 Dec 2011
E1101199-v1 6in VP Type 1 AR data Michael Smith Incoming Inspection
15 Dec 2011
D0902665-v3 Bonding Template Front, Sapphire Prism, HLTS Derek Bridges Suspensions
Final Design
15 Dec 2011
P060036-x0 Burst Gravitational Wave Data Analysis Methods: Design, Development and Comparison Amber Stuver Data analysis software
GW Bursts
Thesis/Dissertation
Document Migration
13 Dec 2011
D0901460-v3 HLTS Magnet Placement Fixture, Bottom Mass Derek Bridges Suspensions
Final Design
12 Dec 2011
D1001007-v2 SLC ARM CAVITY BAFFLE LO TUBE ASSY Niem Nguyen et al. Auxiliary Optics
Fabrication
Modelling
09 Dec 2011
T1100610-v4 Mode change in PRC when ETM is used for ITM Hiro Yamamoto Core Optics
Modelling
09 Dec 2011
E1101088-v4 aLIGO OMC Curved Optics Specification Sam Waldman et al. Requirements
Sensing and Control
06 Dec 2011
D070125-v3 LHO CDS Lans and Gateways David Barker Observatory Facilities
Installation
29 Nov 2011
D1002581-v2 SLC SUSPENSION ROD SUPPORT Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1000930-v1 SLC MAGNET HOLDER STEEL PLATE Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1000684-v2 SLC TUBE LOWER MTG PLATE Niem Nguyen et al. Modelling
Auxiliary Optics
23 Nov 2011
D1002844-v4 SLC ACB BLADE CLAMP Niem Nguyen Auxiliary Optics
Fabrication
Modelling
23 Nov 2011
D1002609-v2 SLC BLADE MOUNTING BRACKET Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1002340-v3 SLC WIRE SUSPENSION ROD Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1001138-v3 SLC ARM CAVITY BAFFLE INTERFACE MOUNTING PLATE Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1003117-v3 SLC PHOTODETECTOR CABLE UPPER ASSY Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1100372-v3 SLC ACB Counter Weight Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1100407-v3 SLC ACB ADJUSTABLE COUNTER WEIGHT Norris Kilpatrick Auxiliary Optics
Modelling
23 Nov 2011
D1100340-v4 SLC ACB RIGHT SIDE PANEL Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1100391-v2 aLIGO AOS, SLC ACB SHELF ASSY Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1100458-v4 SLC ACB BOTTOM EXTENDER Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1100354-v5 SLC ACB RIGHT SIDE EXTENDER Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1100353-v5 SLC ACB LEFT SIDE EXTENDER Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1003025-v4 SLC PHOTODETECTOR HOUSING Niem Nguyen Assembly
Auxiliary Optics
23 Nov 2011
D1001120-v2 SLC EARTHQUAKE STOP RING Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
D1002617-v2 SLC DAMPING TUBE LOWER PLATE Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1002560-v2 SLC DAMPING TUBE TOP PLATE Niem Nguyen Auxiliary Optics
Modelling
23 Nov 2011
D1100243-v2 SLC ACB 3 DEGREE SHIM Niem Nguyen Modelling
Auxiliary Optics
23 Nov 2011
T1100370-v2 Surface figure calibration and uncertainty estimate for measurement of ETM04 GariLynn Billingsley Subsystem Test
Core Optics
22 Nov 2011
D020682-v2 HSTS/OMC Lower Blade Clamp, Shim, 1mm Bobby Moore Final Design
Suspensions
22 Nov 2011
P1100131-v3 Gravitational Wave Detection: Principles and Practice Peter Saulson Education, Outreach
21 Nov 2011
E1101109-v1 PR303 Mass Measurement at Caltech 12.145 Kg GariLynn Billingsley Core Optics
Subsystem Test
18 Nov 2011
G0900912-v1 Stationary Interferometer Simulation Hiro Yamamoto Modelling
Core Optics
10 Nov 2011
D1002357-v4 SLC ACB SKIN 1 HOLE SKIN Niem Nguyen Modelling
Auxiliary Optics
03 Nov 2011
G0900196-v3 Gravitational Waves and LIGO Tiffany Summerscales Education, Outreach
31 Oct 2011
G1101201-v1 Catching Einstein's waves Gabriela Gonzalez Public Talk / Colloquium
29 Oct 2011
G1101199-v1 aLIGO LSC RF photodetector test Koji Arai et al. Sensing and Control
Subsystem Test
28 Oct 2011
G1101200-v2 Towards Advanced LIGO David Reitze Data Analysis
Public Talk / Colloquium
Detector
28 Oct 2011
G1100127-v2 ALS at 40m Koji Arai Sensing and Control
Subsystem Test
Basic R&D
28 Oct 2011
G1101190-v1 CDS Meeting: Daily News Rana Adhikari et al. Commissioning
Data Acquisition System
27 Oct 2011
D1001061-v1 SLC FM ELLIPTICAL BAFFLE SPACER Niem Nguyen Modelling
Auxiliary Optics
26 Oct 2011
D1001755-v2 aLIGO TCS RH, Lower Custom 25D Connector Bracket Mindy Jacobson Final Design
Preliminary Design
Vacuum
Auxiliary Optics
25 Oct 2011
G1101178-v1 Research activities at the Caltech 40m prototype Koji Arai Commissioning
Basic R&D
System Test
Sensing and Control
24 Oct 2011
G1101173-v1 Gravitational Wave Detection Rana Adhikari Detector
Public Talk / Colloquium
22 Oct 2011
D1102052-x0 HSTS Suspended Mass Assembly Michael Meyer Modelling
Suspensions
20 Oct 2011
G1101153-v2 DC Readout in Enhanced LIGO (defense) Tobin Fricke Public Talk / Colloquium
14 Oct 2011
G1101145-v1 LIGO Sources Detectors And Computing Gregory Mendell et al. Public Talk / Colloquium
Data Analysis
13 Oct 2011
D1000233-v3 CUSTOM CABLE V25W Emery Brown Sensing and Control
Fabrication
12 Oct 2011
D1000230-v3 CUSTOM CABLE V25R Emery Brown Fabrication
Suspensions
12 Oct 2011
D0902087-v3 Positioning Standoff, Magnet Placement Fixture, Bottom Mass, HLTS Derek Bridges Final Design
Suspensions
11 Oct 2011
T1100519-v1 The LSC White Paper on Education and Public Outreach 2011 - Public version Marco Cavaglia et al. Education, Outreach
10 Oct 2011
T1000460-v1 The 2010 LSC White Paper on Education and Public Outreach - Public version Marco Cavaglia et al. Education, Outreach
10 Oct 2011
D0900681-v2 Library of Clamps, Lower Blade, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0902452-v2 Standoff Side Plate, Short, Magnet Placement Fixture, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
08 Oct 2011
D0902445-v2 Standoff Plate, Magnet Placement Fixture, Intermediate Mass, HLTS Derek Bridges Suspensions
Final Design
08 Oct 2011
D0901551-v4 Lower AOSEM Alignment Assembly, Intermediate Mass, HLTS Bobby Moore et al. Suspensions
Final Design
08 Oct 2011
D0902024-v4 Upper AOSEM Alignment Assembly, Intermediate Mass, HLTS Bobby Moore et al. Suspensions
Preliminary Design
08 Oct 2011
D0901436-v2 Wire Clamp Mount, Lower Loop Wire Jig, HLTS Derek Bridges Suspensions
Final Design
08 Oct 2011
D0901435-v3 Wire Start Clamp, Inside, Lower Loop Wire Jig, HLTS Derek Bridges Final Design
Suspensions
08 Oct 2011
D0901135-v2 Mounting Block, Lower Clamp, Upper Wire, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D070449-v2 Coil Holder (Tablecloth), HLTS Derek Bridges Final Design
Suspensions
08 Oct 2011
D0900688-v2 Blade Clamp (3.5 Degree), Lower Blade, Inside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900687-v2 Blade Clamp (3.0 Degree), Lower Blade, Inside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D0900686-v2 Blade Clamp (2.5 Degree), Lower Blade, Inside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900685-v2 Blade Clamp (2.0 Degree), Lower Blade, Inside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D0900684-v2 Blade Clamp (1.5 Degree), Lower Blade, Inside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900683-v2 Blade Clamp (1.0 Degree), Lower Blade, Inside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900682-v2 Blade Clamp (0.5 Degree), Lower Blade, Inside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900696-v2 Blade Clamp (3.5 Degree), Lower Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D0900695-v2 Blade Clamp (3.0 Degree), Lower Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900694-v2 Blade Clamp (2.5 Degree), Lower Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D0900693-v2 Blade Clamp (2.0 Degree), Lower Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900692-v2 Blade Clamp (1.5 Degree), Lower Blade, Outside, HLTS Derek Bridges Preliminary Design
Suspensions
08 Oct 2011
D0900691-v2 Blade Clamp (1.0 Degree), Lower Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D0900690-v2 Blade Clamp (0.5 Degree), Lower Blade, Outside, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
D070320-v2 Mounting Bracket, Coil Holder, HLTS Derek Bridges Suspensions
Preliminary Design
08 Oct 2011
G1101133-v1 Advanced LIGO - Talk for ICATPP David Shoemaker Detector
Public Talk / Colloquium
07 Oct 2011
D1002618-v2 SLC TUBE LOWER CONNECTOR PLATE Niem Nguyen Modelling
Auxiliary Optics
07 Oct 2011
D1001186-v2 SLC SCREW HEX HD #3/4-10 X 4.00 MODIFIED Niem Nguyen Modelling
Fabrication
Auxiliary Optics
07 Oct 2011
D1000393-v2 aLIGO INTERMEDIATE MASS TOP PLATE Ignacio Romero Conceptual Design
Auxiliary Optics
06 Oct 2011
E1000306-x0 aLIGO BSC-ISI Testing and Commissioning Documentation Fabrice Matichard et al. Subsystem Test
Seismic Isolation
06 Oct 2011
E1100983-x0 DCN, Custom Parts, aLIGO TCS VIEWPORT ENCLOSURE ASSEMBLY, H2 CO2 LASER PROJECTION Mindy Jacobson Fabrication
Vacuum
Auxiliary Optics
Final Design
Operations
04 Oct 2011
D1101272-v2 aLIGO TCS H2 UHV Mirror Splash Cover Mindy Jacobson Auxiliary Optics
Cleaning
System Engineering
Vacuum
Fabrication
29 Sep 2011
E1100216-v1 DCN -REVISED SLC ARM CAVITY BAFFLE Norris Kilpatrick et al. Auxiliary Optics
Fabrication
Requirements
26 Sep 2011
T1100353-v1 1D PSD of mirror maps Hiro Yamamoto Core Optics
Modelling
23 Sep 2011
D1001861-v2 Faraday Isolator U Spring Manuel Ruiz Auxiliary Optics
Basic R&D
23 Sep 2011
D1002542-v3 Table Balance Weight, .75# Manuel Ruiz Auxiliary Optics
Basic R&D
22 Sep 2011
D0900999-v3 Screw, Socket Head Cap, 1/4-20 UNC-3A X 2 Long, Fully Threaded, Rounded End Derek Bridges System Engineering
Final Design
19 Sep 2011
D1001917-v2 Input Baffle Base Manuel Ruiz Basic R&D
Auxiliary Optics
16 Sep 2011
D1001961-v3 Output Alignment Fixture Base Manuel Ruiz Auxiliary Optics
Basic R&D
16 Sep 2011
D1001959-v2 Reticle Holder Manuel Ruiz Basic R&D
Auxiliary Optics
16 Sep 2011
D1001916-v3 Input Baffle Side Support Manuel Ruiz Basic R&D
Auxiliary Optics
16 Sep 2011
D1001960-v2 FARADAY ISOLATOR WIRE SUPPORT BLOCK Manuel Ruiz Auxiliary Optics
Basic R&D
16 Sep 2011
D1001871-v2 Faraday Isolator Spring Block LH Manuel Ruiz Basic R&D
Auxiliary Optics
16 Sep 2011
D0900616-v2 FARADAY ISOLATOR PRISM MOUNT BASE LH Niem Nguyen Modelling
Auxiliary Optics
16 Sep 2011
D1001870-v2 Faraday Isolator Fixed Stop LH Manuel Ruiz Basic R&D
Auxiliary Optics
16 Sep 2011
D1100231-v3 ALIGO AOS Output Faraday Isolator Spacer (HAM11-H2) Manuel Ruiz Auxiliary Optics
Assembly
15 Sep 2011
D0902461-v2 Optic Rest Wedge, Optic Holder, HAM Triple Suspension Derek Bridges Final Design
Suspensions
15 Sep 2011
D0902460-v2 Base Plate, Optic Holder, HAM Triple Suspension Derek Bridges Suspensions
Final Design
15 Sep 2011
D1001860-v2 Faraday Isolator Spring Block RH Manuel Ruiz Auxiliary Optics
Basic R&D
15 Sep 2011
D1001859-v2 Faraday Isolator Fixed Stop RH Manuel Ruiz Auxiliary Optics
Basic R&D
15 Sep 2011
D1002168-v2 FARADAY ISOLATOR MUSIC WIRE SPLIT CLAMP 3 Manuel Ruiz Auxiliary Optics
Basic R&D
15 Sep 2011
G1100929-v3 Astronomy in a 4-D Universe Gravitational Waves: What Are They and How Do We Find Them? Cristina Torres Detector
Education, Outreach
Public relations
Data Analysis
13 Sep 2011
D1101800-x0