01:00 – LP-01 Full set of Diodes for the PSL:Technical Documentation
01:00 – LP-01 Full set of Diodes for the PSL:RFQ
01:00 – LP-01 Full set of Diodes for the PSL:Change Orders / Modifications
01:00 – LP-01 Full set of Diodes for the PSL:Reports / Correspondence
01:00 – LP-01 Full set of Diodes for the PSL:Close Out
01:00 – LP-01 Full set of Diodes for the PSL:Initiate LP-01 Full set of Diodes for the PSL
01:00 – LP-01 Full set of Diodes for the PSL:Bid Evaluation
01:00 – LP-01 Full set of Diodes for the PSL:NSF Approval
01:00 – LP-01 Full set of Diodes for the PSL:Invoices
01:00 – LP-01 Full set of Diodes for the PSL:Contract/PO
01:30 – LP-02 COMSOL server pending a Change Request:RFQ
01:30 – LP-02 COMSOL server pending a Change Request:Close Out
01:30 – LP-02 COMSOL server pending a Change Request:Bid Evaluation
01:30 – LP-02 COMSOL server pending a Change Request:Invoices
01:30 – LP-02 COMSOL server pending a Change Request:Change Orders / Modifications
01:30 – LP-02 COMSOL server pending a Change Request:Technical Documentation
01:30 – LP-02 COMSOL server pending a Change Request:Contract/PO
01:30 – LP-02 COMSOL server pending a Change Request:Reports / Correspondence
01:30 – LP-02 COMSOL server pending a Change Request:LP-02 COMSOL server
01:30 – LP-02 COMSOL server pending a Change Request:NSF Approval
02:00 – LP-03 Slow controls for the 40m lab various POs:LP-03 Slow controls for the 40m lab
02:00 – LP-03 Slow controls for the 40m lab various POs:Reports / Correspondence
02:00 – LP-03 Slow controls for the 40m lab various POs:NSF Approval
02:00 – LP-03 Slow controls for the 40m lab various POs:Technical Documentation
02:00 – LP-03 Slow controls for the 40m lab various POs:Bid Evaluation
02:00 – LP-03 Slow controls for the 40m lab various POs:Contract/PO
02:00 – LP-03 Slow controls for the 40m lab various POs:Invoices
02:00 – LP-03 Slow controls for the 40m lab various POs:Change Orders / Modifications
02:00 – LP-03 Slow controls for the 40m lab various POs:RFQ
02:00 – LP-03 Slow controls for the 40m lab various POs:Close Out
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Technical Documentation
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Change Orders / Modifications
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):RFQ
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):NSF Approval
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Reports / Correspondence
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Invoices
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Contract/PO
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Close Out
02:30 – 03:00 LP-04 CIT LIGO machine shop (WB Rm 46):Initiate Procurment R1300001-v2
02:30 – LP-04 CIT LIGO machine shop (WB Rm 46):Bid Evaluation
03:00 – LP-05 Helium Leak Tester:Close Out
03:00 – LP-05 Helium Leak Tester:Reports / Correspondence
03:00 – LP-05 Helium Leak Tester:NSF Approval
03:00 – LP-05 Helium Leak Tester:Invoices
03:00 – LP-05 Helium Leak Tester:Technical Documentation
03:00 – LP-05 Helium Leak Tester:RFQ
03:00 – LP-05 Helium Leak Tester:Bid Evaluation
03:00 – LP-05 Helium Leak Tester:Contract/PO
03:00 – LP-05 Helium Leak Tester
03:00 – LP-05 Helium Leak Tester:Change Orders / Modifications
03:30 – LP-06 Vacuum System/Testbed:RFQ
03:30 – LP-06 Vacuum System/Testbed:Invoices
03:30 – LP-06 Vacuum System/Testbed:Contract/PO
03:30 – LP-06 Vacuum System/Testbed:Close Out
03:30 – LP-06 Vacuum System/Testbed:NSF Approval
03:30 – LP-06 Vacuum System/Testbed:Reports / Correspondence
03:30 – LP-06 Vacuum System/Testbed:Bid Evaluation
03:30 – LP-06 Vacuum System/Testbed
03:30 – LP-06 Vacuum System/Testbed:Change Orders / Modifications
03:30 – LP-06 Vacuum System/Testbed:Technical Documentation
04:00 – LP-08 Modest size vacuum system
04:00 – LP-08 Modest size vacuum system:NSF Approval
04:00 – LP-08 Modest size vacuum system:Contract/PO
04:00 – LP-08 Modest size vacuum system:RFQ
04:00 – LP-08 Modest size vacuum system:Close Out
04:00 – LP-08 Modest size vacuum system:Invoices
04:00 – LP-08 Modest size vacuum system:Technical Documentation
04:00 – LP-08 Modest size vacuum system:Bid Evaluation
04:00 – LP-08 Modest size vacuum system:Reports / Correspondence
04:00 – LP-08 Modest size vacuum system:Change Orders / Modifications
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Technical Documentation
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:NSF Approval
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Close Out
04:30 – 05:00 LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Bids and Selection
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Invoices
04:30 – 05:00 LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Intiate R1300014-v1
04:30 – 05:00 LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Procurment Documents
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Reports / Correspondence
04:30 – 05:00 LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Change Order No. 1 to PO 75-S192901
04:30 – LP-09 RTS Absorption Laser Replacement IPG Photonics Corp:Change Orders / Modifications
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Change Orders / Modifications
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Invoices
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:NSF Approval (not applicable)
05:00 – 05:30 LP-10g LLO BT Environmental Monitor & Network Infrastructure:Initiate Procurement 11/4/13 Change Request R1300029-v1
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Close Out
05:00 – 05:30 LP-10g LLO BT Environmental Monitor & Network Infrastructure:Bill of Material 11/14/13
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Reports / Correspondence
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Bid Evaluation
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:RFQ
05:00 – LP-10g LLO BT Environmental Monitor & Network Infrastructure:Contract/PO
07:00 – 07:30 LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Change Request, Authoriization LP-11a LHO Insulation Removal
07:00 – LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Reports / Correspondence
07:00 – LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Invoices
07:00 – 10:00 LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Contract/PO 75-1094420 Pacifc Industrial Contracting LLC
07:00 – 07:30 LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Statement of Work
07:00 – LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:NSF Approval (not required)
07:00 – LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Change Orders / Modifications
07:00 – 08:30 LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Bid Evaluation
07:00 – 08:30 LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:RFP
07:00 – LP-11a LHO Pacific Industrial Contracting Beam Tube Insulation Removal:Close Out
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:Change Orders/Modifications
09:00 – 09:30 LP-10c-1 Aggreko LLO BT Rent Dehumidifier:Change Order #3, extend to 8/1/14
09:00 – 10:30 LP-31 Trane US Inc LLO Chillers:Quote
09:00 – LP-66 LHO Replace VEA Access System:Selection
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Statement of Work
09:00 – LP-10L LLO INFICON Inc Leak Detector:Procurement Documents
09:00 – 09:30 LP-12a LHO Hibbs Eng Re-Roof Design:Proposal & Statement of Work 1/31/13
09:00 – LP-10e LLO Aggreko Portable A/C Unit:Procurement Documents
09:00 – LP-10e LLO Aggreko Portable A/C Unit:Purchase
09:00 – LP-12b LHO Ark Re-Roof General Contractor:Safety
09:00 – LP-12a LHO Hibbs Eng Re-Roof Design:Closeout
09:00 – LP-31 Trane US Inc LLO Chillers:Reports/Correspondence
09:00 – LP-10b-1 LLO DEMCO, Beam Tube Electric Power Service:Closeout
09:00 – 13:30 LP-17b LLO J. Reynolds Roofing Contractor:Contract 75-1094398 J. Reynolds & Co
09:00 – 09:30 LP-12b LHO Ark Re-Roof General Contractor:Washington State Sales Tax Applies
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Addendum #1 to RFP, dated 12/13/13
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Purchase Order 75-S195941, issued 3/7/14
09:00 – LP-10L LLO INFICON Inc Leak Detector:Mods
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:Closeout
09:00 – LP-10L LLO INFICON Inc Leak Detector:Solicitation
09:00 – LP-66 LHO Replace VEA Access System:Purchase Order
09:00 – 09:30 LP-10c Advantix LLO BT Dehumidifier Engines:Statement of Work/Specification
09:00 – 10:00 LP-17b LLO J. Reynolds Roofing Contractor:Warranty & Lightening Certification for LLO Buildings
09:00 – 12:00 LP-31 Trane US Inc LLO Chillers:Contract/PO
09:00 – LP-12a LHO Hibbs Eng Re-Roof Design:Changes/Modifications
09:00 – 10:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Mod-1 add 47 seam repairs, 5/19/14
09:00 – LP-10L LLO INFICON Inc Leak Detector:Closeout
09:00 – 09:30 LP-00 Liens Proposals & Directorate Approvals:Liens Procurement Plan
09:00 – 22:00 LP-00 Liens Proposals & Directorate Approvals:Liens Change Requests
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Closeout & Release of Claims
09:00 – LP-66 LHO Replace VEA Access System:Invoices
09:00 – LP-10c-1 Aggreko LLO BT Rent Dehumidifier:Closeout
09:00 – 10:00 LP-10d LLO J. Reynolds Tunnel Seam Repair:Request for Proposal, 11/26/13
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:NSF approval not required
09:00 – LP-10c Advantix LLO BT Dehumidifier Engines:Invoices
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:Ref. PO 75-S194774 Beckhoff 66% LHO - 33% split, dated 2/24/14
09:00 – 09:30 LP-00 Liens Proposals & Directorate Approvals:Weekly LLO Procurement Mgt
09:00 – 09:30 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Safety Review
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:NSF Approval Not Applciable <$250k
09:00 – LP-17b LLO J. Reynolds Roofing Contractor:Invoices
09:00 – 09:30 LP-17b LLO J. Reynolds Roofing Contractor:Safety Review
09:00 – 10:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Proposals dated 1/16/14
09:00 – 09:30 LP-10a LLO Insulation Removal Ethos USA Inc:Technical Evaluation
09:00 – LP-10b-1 LLO DEMCO, Beam Tube Electric Power Service:Invoive
09:00 – 11:00 LP-10a LLO Insulation Removal Ethos USA Inc:Contract/PO
09:00 – 10:30 LP-17b LLO J. Reynolds Roofing Contractor:Bids
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:RFQ
09:00 – LP-17a LLO Roof Design Sizeler Thompson Brown:Supplemental Agreements
09:00 – 11:30 LP-17b LLO J. Reynolds Roofing Contractor:Mod-1 UL Lighting
09:00 – 10:30 LP-12b LHO Ark Re-Roof General Contractor:Bids
09:00 – 09:30 LP-17b LLO J. Reynolds Roofing Contractor:Closeout & Release of Claims dated 3/19/14
09:00 – 09:30 LP-12a LHO Hibbs Eng Re-Roof Design:Purchase Order
09:00 – 09:30 LP-10c-1 Aggreko LLO BT Rent Dehumidifier:Basic PO Feb 2014 & Change Order 2 docs
09:00 – 15:00 LP-10c Advantix LLO BT Dehumidifier Engines:Bids and Selection
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:Invoices
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:Close Out
09:00 – 13:30 LP-17a LLO Roof Design Sizeler Thompson Brown:Solicitation & Selection
09:00 – 10:00 LP-10b-1 LLO DEMCO, Beam Tube Electric Power Service:Procurement Documents
09:00 – 11:00 LP-10c Advantix LLO BT Dehumidifier Engines:RFP #LP-10c plus Addendum #1
09:00 – 10:30 LP-31 Trane US Inc LLO Chillers:Intiate Procurement LLO Giaime Welborn
09:00 – LP-00 Liens Proposals & Directorate Approvals:Liens Labor
09:00 – 12:00 LP-10d LLO J. Reynolds Tunnel Seam Repair:Cancelled RFQ LP-10d dated 10/29/13
09:00 – 11:30 LP-12a LHO Hibbs Eng Re-Roof Design:Procurement Documents
09:00 – 09:30 LP-10e LLO Aggreko Portable A/C Unit:Basic Agreement 6/12/13
09:00 – 09:30 LP-70 Vacuum Equipment for LHO GC LHO R1300025-v1
09:00 – LP-17a LLO Roof Design Sizeler Thompson Brown:Closeout
09:00 – LP-66 LHO Replace VEA Access System:Closeout
09:00 – LP-10c Advantix LLO BT Dehumidifier Engines:Closeout
09:00 – 09:30 LP-10a LLO Insulation Removal Ethos USA Inc:Statement of Work
09:00 – 09:30 LP-12b LHO Ark Re-Roof General Contractor:Roof Warranty 25 yrs starting 11/27/13
09:00 – 10:00 LP-00 Liens Proposals & Directorate Approvals:FY2013 Acquistion Plan and NSF Approval
09:00 – 09:30 LP-12b LHO Ark Re-Roof General Contractor:Bonds
09:00 – 10:00 LP-17b LLO J. Reynolds Roofing Contractor:NSF Review & Approval
09:00 – LP-17b LLO J. Reynolds Roofing Contractor:Reports/Correspondence
09:00 – LP-10L LLO INFICON Inc Leak Detector:Invoices
09:00 – 09:30 LP-00 Liens Proposals & Directorate Approvals:Liens Proposals & Directorate Approval CIT
09:00 – 11:00 LP-12a LHO Hibbs Eng Re-Roof Design:Initiate Procurement 2/1/13 LHO
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Approvals & Techncial Direction Memos
09:00 – LP-10e LLO Aggreko Portable A/C Unit:Invoices
09:00 – 10:00 LP-31 Trane US Inc LLO Chillers:Warranty Trane Chillers
09:00 – 10:00 LP-31 Trane US Inc LLO Chillers:NSF Approval Required
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:Ref. PO 75-S198133 Beckhoff LHO dated 3/31/14
09:00 – 10:30 LP-10a LLO Insulation Removal Ethos USA Inc:Bid Evaluation
09:00 – LP-10c Advantix LLO BT Dehumidifier Engines:Purchase Order
09:00 – 09:30 LP-12b LHO Ark Re-Roof General Contractor:Change Request Authorization from LIGO Directorate
09:00 – LP-31 Trane US Inc LLO Chillers:Invoice
09:00 – LP-12a LHO Hibbs Eng Re-Roof Design:Invoices
09:00 – LP-10e LLO Aggreko Portable A/C Unit:Closeout
09:00 – 10:00 LP-10a LLO Insulation Removal Ethos USA Inc:Safety Review
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:Reports/ Correspondence
09:00 – LP-10d LLO J. Reynolds Tunnel Seam Repair:Invoices
09:00 – 11:30 LP-17b LLO J. Reynolds Roofing Contractor:Invitation to Bid (ITB) Specification & Drawing
09:00 – 09:30 LP-10c-1 Aggreko LLO BT Rent Dehumidifier:Prior Rental Aggreko 75-S171143 Jun 2012 - Oct 2013
09:00 – 10:00 LP-10b-1 LLO DEMCO, Beam Tube Electric Power Service:Purchase Order 75-1094636
09:00 – 11:00 LP-10d LLO J. Reynolds Tunnel Seam Repair:NSF Approval 3/6/14
09:00 – 10:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Selection
09:00 – 10:00 LP-10e LLO Aggreko Portable A/C Unit:Change Order #5
09:00 – 09:30 LP-17b LLO J. Reynolds Roofing Contractor:Initiate Procurement 4/1/13 and Change Request Approval LLO Oram Welborn
09:00 – LP-66 LHO Replace VEA Access System:Procurement Documents
09:00 – LP-10L LLO INFICON Inc Leak Detector:Drawings and Specifications
09:00 – 09:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Warranty dated 8/4/14
09:00 – LP-10L LLO INFICON Inc Leak Detector:Intiate Procurement LLO Leak Detector LLO
09:00 – LP-31 Trane US Inc LLO Chillers:Closed 5/30/14
09:00 – 11:30 LP-10d LLO J. Reynolds Tunnel Seam Repair:Procurement Documents
09:00 – 09:30 LP-17b LLO J. Reynolds Roofing Contractor:Bid Evaluation & Selection
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:NonComp
09:00 – LP-10a LLO Insulation Removal Ethos USA Inc:Change Orders/Modifications
09:00 – 09:30 LP-12a LHO Hibbs Eng Re-Roof Design:Completion Schedule Projection, dated 11-Apr-2013
09:00 – LP-72 Vacuum Control System Upgrade at LHO and LLO:Invoices
09:00 – 09:30 LP-31 Trane US Inc LLO Chillers:Request for Information
09:00 – LP-10L LLO INFICON Inc Leak Detector:Selection
09:15 – LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Reports/Correspondence
09:15 – LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Invoices
09:15 – 10:15 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:RFQ
09:15 – 12:15 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:PO 75-S189339 Procurement Documents
09:15 – LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:NSF Approval (not required)
09:15 – LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Changes/Modifications
09:15 – LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Closeout
09:15 – 11:15 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Bid Evaluation & Selection
09:15 – 09:45 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Initiate Procurement 5/10/13 LLO R1300018-v1
09:15 – 09:45 LP-10b-2 LLO MMR Group Beam Tube Elect Service Connect:Statement of Work
11:00 – 12:00 LP-12b LHO Ark Re-Roof General Contractor:Reports / Correspondence
11:00 – LP-12b LHO Ark Re-Roof General Contractor:Close Out
11:00 – 13:30 LP-12b LHO Ark Re-Roof General Contractor:Mod-1 add changes
11:00 – 14:00 LP-12b LHO Ark Re-Roof General Contractor:Compete Solicitation with Invitation To Bid (ITB)
11:00 – 12:00 LP-12b LHO Ark Re-Roof General Contractor:Drawing & Tech Specs
11:00 – 11:30 LP-12b LHO Ark Re-Roof General Contractor:LP-12b LHO Roof replacement, Option 1 all LVEA/OSB, MID, END
11:00 – 13:30 LP-12b LHO Ark Re-Roof General Contractor:Bid Evaluation, Validation & Selection
11:00 – 16:00 LP-12b LHO Ark Re-Roof General Contractor:Contract/PO
11:00 – 13:00 LP-12b LHO Ark Re-Roof General Contractor:NSF Approval
11:00 – LP-12b LHO Ark Re-Roof General Contractor:Invoices
13:00 – 13:30 LP-17a LLO Roof Design Sizeler Thompson Brown:Bid Package Statement of Work
13:00 – 15:00 LP-17a LLO Roof Design Sizeler Thompson Brown:Contract 75-1094173 Sizeler Thompson Brown Architects issued 7/9/13
13:00 – LP-17a LLO Roof Design Sizeler Thompson Brown:Invoices
13:00 – 14:30 LP-17a LLO Roof Design Sizeler Thompson Brown:Initiate Procurement 2/26/13 LLO
13:00 – 14:30 LP-17a LLO Roof Design Sizeler Thompson Brown:Procurement Summary and Documents
13:00 – 13:30 LP-10a LLO Insulation Removal Ethos USA Inc:Change Request R1300017-v1 Approval LLO Beam Tube Insulation Removal LLO R1300017-v1
13:00 – 13:30 LP-17a LLO Roof Design Sizeler Thompson Brown:Roof Report July 2012
14:00 – 14:30 LP-10c Advantix LLO BT Dehumidifier Engines:Initiate Procurement LLO R1300023-v1
15:00 – 15:30 LP-10b-1 LLO DEMCO, Beam Tube Electric Power Service:Initiate Procurement 5/31/13 LLO R1300018-v1
15:00 – 16:00 LP-10d LLO J. Reynolds Tunnel Seam Repair:Initiate Procurement 5/21/13 LLO R1300020-v1
16:00 – 16:30 LP-66 LHO Replace VEA Access System:Initiate Procurement 6/3/13 LHO R1300124-v1
16:30 – 17:00 LP-10e LLO Aggreko Portable A/C Unit:Initiate Procurement 5/21/13 LLO R1300021-v1
17:00 – 17:30 LP-71 LHO to upgrade part of their network infrastructure LHO R1300027-v1
17:30 – 18:00 LP-72 Vacuum Control System Upgrade at LHO and LLO:Initiate Procurement 12/18/13 LHO & LLO
18:00 – 18:30 LP-10c-1 Aggreko LLO BT Rent Dehumidifier:Initiate Procurement