9/27/2016 Dennis Coyne: Added the Zemax archive file (extension *.ZAR). This file was in the SolidWorks vault as version x-012 and dated 12/11/2012. I'm not sure that this archive file has all of the necessary optic material files, coating files and object (CAD) files. If not let me know and I'll find and add them.
9/28/2016 Dennis Coyne: Added eDrawings. The file "D0902216 L1 Zemax layout 11-dec-2012 x-012 a noSR2baf.EASM" has the SR2 scrapper baffle removed to see where a mis-aligned ghost beam will go. (Also the SR2 optic diameter was increased in case tolerances cause a near miss instead of a reflection.) Yawing and pitching the CPy does not move the ghost beams at the SRM, as observed in the actual L1 IFO. A puzzle.
DCC Version 3.5.1, contact
DCC Help