LIGO Document D1500265-v2

New Code Deployment on DCC.

A new version of DCC code was just deployed. Our team is currently checking that nothing unexpected happened in the process.

This message will be removed shortly.

In the meantime please use the following read-only replicas:

Status message last updated at: Sun May 4 03:21:55 PDT 2025

TCS Laser Chiller Summing Board

Document #:
LIGO-D1500265-v2
Document type:
D - Drawings
Other Versions:
Abstract:
This board sums the a DC offset with the DAC signal of the TCS Laser chillers so that they don't overflow, and wreak havoc.
Files in Document:
Other Files:
Keywords:
TCS laser chiller DAC
Notes and Changes:
For rev v2, the gains of the summing node were changed to reflect the ECR here: https://dcc.ligo.org/LIGO-E1500364

REDLINES: Add 2 DB9 breakout connectors

Referenced by:

DCC Version 3.5.1, contact DCC Help