LIGO Document D1900456-v7
- v7:
-Updated section FCA-1 to split the first section of tube near HAM7 into 2 tubes of 7.5ft each,t was: 15ft. lg.
-Updated section FCD-1 to split the last section of tube near HAM8 into 2 tubes of 8ft and 12ft in length, was: 20ft. lg.
DCC Version 3.5.0, contact
DCC Help