LIGO Document E1000404-v2
- ACB Interface BSC Chambers H1, H2 for Advanced LIGO
- This interface control document shows the distance between the Arm Cavity Baffle and the HR surface of the Quad in all BSC chambers for H1, H2.
BSC5 & BSC6 H2 need to be updated. New Baffle is being designed.
DCC Version 3.5.0, contact
DCC Help