LIGO Document E1100481-v1
- This document describes the plan for acceptance testing of the Mode Cleaner Tube Baffle and the Manifold/Cryopump Baffle subassemblies during manufacturing, and for testing the final assembly before installing in the aLIGO chambers.
- OBSOLETE
SEE: E1100607-v5 SLC Manifold Cryopump Baffle Assembly and Installation Document
SEE: E1100718-v8 Mode Cleaner Tube Baffle Assembly and Installation Procedure
DCC Version 3.5.0, contact
DCC Help