LIGO Document E1400330-v1

New Code Deployment on DCC.

A new version of DCC code was just deployed. Our team is currently checking that nothing unexpected happened in the process.

This message will be removed shortly.

In the meantime please use the following read-only replicas:

Status message last updated at: Sun May 4 00:57:23 PDT 2025

Waiver for another RGA scan of the OMC Breadboard Assy, ASSY-D1201439-3

Document #:
LIGO-E1400330-v1
Document type:
E - Engineering documents
Other Versions:
Abstract:
The aLIGO OMC breadboard Assembly (D1201439-v2) for the 3rd IFO was recently cleaned and vacuum baked (ICS Bake-7446). The RGA scan associated with this vacuum bake was approved. Subsequently the EP30-2 adhesively bonded beam dump joints were found to be somewhat debonded, likely as a result of differential thermal expansion. Since debonding and rework of the OMC breadboard assy would risk damage to the OMC optics it was decided to stake the beam dumps by adding EP30-2 adhesive along their perimeter interface with the OMC breadboard. This was done and was successful; The beam dumps appear to be more firmly attached. This document is a waiver for another (second) vacuum bake and RGA scan.
Authors:
Notes and Changes:
See also the following ICS defect record:
https://ics-redux.ligo-la.caltech.edu/JIRA/browse/DEFECT-ISC-12035
waiver granted 7/14/2014 by Dennis Coyne

DCC Version 3.5.1, contact DCC Help