LIGO Document E1400413-v1
- Move the doubler which drives the ALS fiber distribution box from rack ISC-R1 to ISC-R4. This reduces the electronics crosstalk between this unit and the PSL VCO. We will also used a different RF patch panel in ISC-R2. The RF power levels have been re-measured, possibly requiring to change the attenuator at the ALS fiber distribution chassis input. This is integration tracking issue 714.
https://services.ligo-wa.caltech.edu/integrationissues/show_bug.cgi?id=714
- approved by Dennis Coyne 10/31/2014
DCC Version 3.5.0, contact
DCC Help