LIGO Document T1300645-v1
- With the addition of HEPI, as well as a few extra control paths which are possible from the addition of Stage 0 L4Cs, it is necessary to re-calculate the performance of the platform for noise-budgeting techniques originally developed in eLIGO. This document describes the details of this recalculation.
- Initial version. Please forgive (and tell me about) typos and mistakes.
DCC Version 3.5.0, contact
DCC Help