LIGO Document T2100517-v1
- The design seemed to evolve sometime between the TDM C1106728 approving a new design in 2011 and an e-mail conversation in 2013.
Capturing here the latest known information about the design as CSIRO is no longer in the business of Ion Beam Sputtered coatings. The "old" Excel file referenced is the official design found at C1106309, now updated with this document.
DCC Version 3.5.1, contact
DCC Help