LIGO Document D071497-v2

Asm, Fixture, Actuator Set-Up

Document #:
LIGO-D071497-v2
Document type:
D - Drawings
Other Versions:
LIGO-D071497-v1
22 May 2009, 11:47
Abstract:
Sub-assembly for HAM ISI. Tooling for building Actuator assemblies. The field assembly and bobbin of the Actuator are rigidly attached to this fixture, which sets the relative position nominally at its center. A solid bar is then bolted to both sides of the Actuator, which allows us to maintain proper alignment through installation of the Actuator assemblies within the HAM ISI.
Files in Document:
Keywords:
HAM-ISI
Notes and Changes:
Release for Advanced LIGO. Refer to DCN for list of changes since v1.
Related Documents:
Referenced by:

DCC Version 3.5.0, contact DCC Help