LIGO Document D0901519-v2
- Top half of Keel structure for Stage 2 of the aLIGO BSC ISI. Includes a breadboard pattern of threaded inserts for attaching Ballast masses as needed for balancing the stage.
- See DCN E1000129 for changes made since v1 release.
- held on 18 Feb 2010 in 75ADV-S096429
DCC Version 3.4.0, contact
Document Database Administrators