LIGO Document D1000634-v1
Home
Recent Changes
Topics
Login
TCS CO2P Table Assembly, H1/L1
Document #:
LIGO-D1000634-v1
Document type:
D - Drawings
Other Versions:
LIGO-D1000634-v2
24 Mar 2016, 12:36
Abstract:
For aLIGO this is the assembly of components required for the CO2 Laser Projection system at H2, excluding a chiller, associated plumbing, and power supply cables/wires.
Files in Document:
D1000634-v1_TCS CO2P TABLE ASSY, H1-L1.PDF
(760.9 kB)
ICS/JIRA Record:
ICS_LINK
Topics:
Preliminary Design
Fabrication
Final Design
Auxiliary Optics
Authors:
Mindy Jacobson
Aidan Brooks
Alastair Heptonstall
Keywords:
TCS
CO2
Laser
Table
Notes and Changes:
-v1 indicates the as-built configurations for the X- and Y-arm CO2 laser projection systems
Related Documents:
LIGO-D1200953:
Periscope Assembly, In Air, aLIGO TCS CO2 Laser Projection Table, H1, L1
LIGO-D1300508:
aLIGO TCS CO2P Enclosure Patch Panel Assy, Laser End
LIGO-D1300764:
aLIGO TCS CO2P Enclosure Patch Panel Assy, Periscope End
LIGO-D1101509:
Pico Motor Driver Chassis
LIGO-D1300649:
aLIGO TCS ISS and Interface Chassis
LIGO-D1300366:
TCS IR Sensor Comparator Box
Home
Recent Changes
Topics
Login
DCC
Version 3.5.0
, contact
DCC Help