LIGO Document D1002870-x0
- The following links are an attempt to cover all of the information for the advanced LIGO
1) Flange Layout + type
2) cable lengths
3) bracket location
4) cable count
5) flange identifier e.g. MC3 to D6 via CB6 in HAM3L
6) and related input documents
- 1) The HAM flange tetris (see below in related documents)
2) The BSC flange tetris (coming soon)
3) The chamber designations for aLIGO are given in the files for LHO and LLO respectively:
* D0901477-v2 file, Vacuum Chamber Designations for LHO aLIGO
* D0901490-v1 file, Vacuum Chamber Designations for LLO aLIGO
4) The designations (naming conventions) for the feedthrough ports (optical and electrical) are given in these drawings:
* D980227-x0, Naming Conventions, BSC Ports
* D980226-x0, Naming Conventions for Ports on HAM Chamber
* D980228-x0, Naming Conventions for Ports on Adapter
5) The orientation of the chambers (0 degree and support tubes for BSC chambers) is given in the following iLIGO drawings for LHO:
* D961165-v1, LIGO Vacuum Equipment Arrangement Plan, Corner Station, Washington Site
* D961169-v1, LIGO Vacuum Equipment Arrangement Plan, X-End Station, Washington Site
* D961171-v1, LIGO Vacuum Equipment Arrangement Plan, Y-End Station, Washington Site
and for iLIGO LLO in these drawings:
* D970383-v1, LIGO Vacuum Equipment Arrangement Plan, Corner Station, Louisiana Site
* D970384-v1, LIGO Vacuum Equipment Arrangement Plan, X-End Station, Louisiana Site
* D970385-v1, LIGO Vacuum Equipment Arrangement Plan, Y-End Station, Louisiana Site
In aLIGO, the BSC chambers in the corner stations and end stations of both observatories are not moved, so the orientation is the same as in iLIGO. However, at LHO the chambers from the mid-station are relocated to the end stations as H2 end test mass chambers. The orientation of these relocated BSC, H2 end chambers is the same as the corresponding BSC, H1 end chambers in the same end station.
See also:
* D0901469-v5, aLIGO LHO X-End Layout
* D0901467-v5, aLIGO LHO Y-End Layout
6) Advanced LIGO BSC and HAM ISI Conventions, G1000125
- LIGO-D1002892: aLIGO Flange Layout Document v14
- LIGO-E1000760: Cable Lengths, Corner Station, H1 & H2
- LIGO-D1003092: Flange Layout – L1 Beam Splitter Chamber 5 (BSC5) ETMY
- LIGO-D0901490: aLIGO LIVINGSTON SYSTEM LAYOUT
- LIGO-D980227: Naming Conventions, BSC Ports
- LIGO-D980226: Naming Conventions for Ports on HAM Chamber
- LIGO-D980228: Naming Conventions for Ports on Adapter
- LIGO-D961165: LIGO Vacuum Equipment Reissued to LIGO for Information - Equipment Arrangement Plan, Corner Station, Washington Site
- LIGO-D961169: LIGO Vacuum Equipment Issued for As Built - Equipment Arrangement, Right End Station, Area 500, Washington Site
- LIGO-D961171: Equipment Arrangement, Left End Station, Washington, LIGO Vacuum Equipment, Rev. 05 - AS BUILT
- LIGO-D970383: Equipment Arrangement Plan, Area 600, Corner Station, Louisiana, LIGO Vacuum Equipment
- LIGO-D970384: Equipment Arrangement, Right End Station, Area 800, Louisiana, LIGO Vacuum Equipment
- LIGO-D970385: Equipment Arrangement, Left End Station - Area 700, Louisiana, LIGO Vacuum Equipment
- LIGO-D0901467: aLIGO Systems Layout LHO Y-End Station
- LIGO-G1000125: aLIGO BSC-ISI, HAM-ISI, and HEPI Basis and Naming Conventions
- LIGO-D990684: Final "As-built" Vacuum Equipment Documents & Drawings for Initial LIGO
- LIGO-T1000569: LLO Training Quad Vacuum Cable Test Results
- LIGO-D1001347: aLIGO, ASSY, DB25 CABLE BRACKET, BSC TABLE
- LIGO-E1000054: Cabling Provisions for aLIGO HAM ISI
DCC Version 3.5.0, contact
DCC Help