LIGO Document D1201390-v2
- Installation of October 11, 2012
The only optics installed are the ones which allow the REFL, POP/ALS and PSL beams to be routed to ISCT1.
- Fixed a couple of typos
**OBSOLETE (DO NOT USE), HAM1 is now fully populated at both sites**
DCC Version 3.5.0, contact
DCC Help