LIGO Document E080208-v13

HLTS Assembly Procedure

Document #:
LIGO-E080208-v13
Document type:
E - Engineering documents
Other Versions:
LIGO-E080208-v15
09 Apr 2013, 14:04
LIGO-E080208-v11
04 May 2012, 13:38
Abstract:
These are the assembly instructions for the HLTS.
Keywords:
SUS HLTS assembly
Notes and Changes:
Major changes:
Added a more detailed overview of the assembly process.
Sections have been rearranged into a more logical order.
Removed references to installing Mounting Pad Front Brackets (D0900627).
Added wording that Bottom Mass Upper Earthquake Stops are canted outboard by 5 degrees.

Still to be done:
Revise torque values as needed.
Fill in new sections added in this version.
Update figures.
Update magnet gluing references.
Update balancing procedure.
Add section on glass optic installation.


DCC Version 3.4.2, contact Document Database Administrators