LIGO Document E0900480-v3
Home
Recent Changes
Topics
Login
FTIR Testing to Qualify Parts for LIGO UHV Service
Document #:
LIGO-E0900480-v3
Document type:
E - Engineering documents
Other Versions:
LIGO-E0900480-v6
10 Jun 2022, 07:19
LIGO-E0900480-v5
10 Oct 2017, 10:31
LIGO-E0900480-v4
03 Jun 2011, 09:57
LIGO-E0900480-v2
26 Mar 2010, 07:22
Abstract:
FTIR Testing to Qualify Parts for LIGO UHV Service
Files in Document:
E0900480-v3 FTIR testing.pdf
(43.8 kB)
Other Files:
E0900480-v3 FTIR testing.doc
(449.5 kB)
Topics:
Fabrication
Vacuum
Authors:
Dennis Coyne
Notes and Changes:
Section 5 was changed to explicitly state that a pre-bake FTIR is preferred, a post-bake FTIR is acceptable, but both are not required. In addition the criteria for surfaces and holes are defined for a post-bake FTIR.
Related Documents:
LIGO-E010613:
Generic Requirements & Standards for Detector Subsystems
LIGO-E960022:
LIGO Clean and Bake Methods and Procedures
LIGO-E960050:
LIGO Vacuum Compatible Materials List
LIGO-E0900479:
Instructions for taking Low Volatility Residue (LVR) Wipe Samples
Home
Recent Changes
Topics
Login
DCC
Version 3.5.0
, contact
DCC Help