LIGO Document E1000191-x0
- DCN to release ARM cavity baffle drawings for LASTI
- 1. Intitial release for LASTI
2. Parts were manufactured, tested and shipped to LASTI on September 2010.
3. Some parts will be revised and redesigned to conform to the regular ARM cavity baffle after releasing this LASTI document.
DCC Version 3.5.0, contact
DCC Help