- acceptance documents for the OBS1 PSL installed at LLO
- PSL-L1 14-Nov-2012, Acceptance Review Team (Peter Fritschel, Valera Frolov and Dennis Coyne) have provisionally accepted the PSL-L1. There are some minor actions yet to be completed (which are listed in the "check list" document).
Systems Engineering has reviewed and accepted this Fabrication Acceptance Review as well.
V3: added links to LAE and table testing under 6.3.c
the to-do list give in the notes of V2 of this document were transfered to section 5 of E1100716