LIGO Document E1200385-v2

H2 Pre-Stabilized Laser Subsystem Testing and Acceptance

Document #:
LIGO-E1200385-v2
Document type:
E - Engineering documents
Other Versions:
Abstract:
Test results and reference measurements of the aLIGO H2 PSL after installation in December 2011. The document furthermore includes the same measurements taken after the H2 PSL was moved to the H1 location (after the decission to install the third IFO in India).
Files in Document:
Other Files:
Authors:
Notes and Changes:
Aug 2013 measurements are added

the data-files of the measurements are attached to version v1 of this document and to E1300129-v1

Referenced by:

DCC Version 3.5.0, contact DCC Help