LIGO Document E1201054-x0
- RF16-1C and RF16-2C Labels on Field Rack ISC R2 on WFS I & Q Demodulator and 2-Channel Demodulator swapped.
Cable RF13-1B and RF13-2B Labels on Field Rack ISC R1 swapped and cable RF12-1 moved to the first channel.
2 CH Phase Discriminator Field Rack ISC R1 name changed to 79.4/158.8MHz.
Picomotor Controller 4 location labeled as IOT2L
Shutter Controller 1 location labeled as IOT2L
Picomotor Controller 3 location labeled as IOT2L
Shutter Controller 2 location labeled as ISCT1
Shutter Controller 3 location labeled as ISCT1
Picomotor Controller 7 location labeled as ISCT6
DCC Version 3.5.0, contact
DCC Help