LIGO Document E1300079-v6

Whitening Chassis Channel Assignment

Document #:
LIGO-E1300079-v6
Document type:
E - Engineering documents
Other Versions:
LIGO-E1300079-v12
07 Aug 2024, 15:30
LIGO-E1300079-v11
26 Aug 2022, 17:06
LIGO-E1300079-v10
01 Feb 2019, 11:20
LIGO-E1300079-v9
27 Jun 2017, 09:12
LIGO-E1300079-v8
22 Jan 2017, 19:49
LIGO-E1300079-v7
27 Jun 2016, 13:21
LIGO-E1300079-v5
14 Jan 2015, 12:47
LIGO-E1300079-v4
05 Dec 2014, 10:05
LIGO-E1300079-v3
28 Jun 2013, 14:04
Abstract:
Channel assignment of the analog whitening filters within the slow controls.
Files in Document:
Other Files:
Authors:
Notes and Changes:
Added an additional WFS chain at the AS port
H1.ASC.As_A.Rf90.Whiten (BIO 3 chassis 3, leapfrog)
H1.ASC.As_B.Rf90.Whiten (BIO 4 chassis 4)
Removed references to in-air WFS

DCC Version 3.5.0, contact DCC Help