LIGO Document E1300717-v1
- This is an inventory of the optical-lever pylons for H1 and the third interferometer, I1. Time constraints prevent me from entering this into the ICS, so I am posting scans of my handwritten notes. Also included are partial assemblies of installed hardware at LHO.
DCC Version 3.5.0, contact
DCC Help