LIGO Document E1400047-v1
- The arm initial alignment (dither alignment) code needs the green arm transmitted signals to be available in the ASC front-end. Those signals are currently only available in Beckhoff corner system. A DB9 cable and 4 ADC channels are required to make the signals available
-
- pdf (ECR_ALS2ASC.pdf, 18.0 kB)
- Other Files:
- word (ECR_ALS2ASC.docm, 24.4 kB)
DCC Version 3.5.0, contact
DCC Help