LIGO Document E1500178-x0
- Fabrication acceptance for the ISC Slow Controls is performed by going through the DCC tree for Slow Controls:
E1200224.
This file card serves to capture the review team's approval of the slow controls fabrication, via the sign-off field.
- Approved by Ben Abbott and Stan Whitcomb for the ISC Acceptance Review Team with punch list items documented in LIGO-E1400172-v9: Punch List for ISC Fabrication Acceptance Review
DCC Version 3.5.0, contact
DCC Help