LIGO Document E1600373-v3
- Sketch for post O2 proposals for laying out HAM1. Includes
1. Second pre-Mode Cleaner (SMC)
2. In-vacuum jitter measurement
3. In-vacuum POP WFS
4. In-vacuum IMC LSC and ASC detectors
5. Second REFL detector for noise correlation studies
- POP WFS moved into HAM3;
Added beam dump for IMC reflection beam;
Added camera path for SMC beam