LIGO Document L1000022-v1
- Some RAL parts were bead blasted and a waiver was requested.
22nd April 2015. A file called "BS structure acceptance criteria" has been added which captures email trail and summarizes final decision. The decision was to rework the bead-blasted parts.
DCC Version 3.5.0, contact
DCC Help