LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
M0900136-v2 |
Restricted Work Alone Policy |
Charles Taylor et al. |
Safety
Policies
|
23 Jun 2018 |
C1106833-v2 |
SOW LHO Landscape Maintenance and Tumbleweed Removal |
John Worden et al. |
Operations Business
Observatory Facilities
|
11 Sep 2015 |
E1000654-v5 |
Specification for LIGO BSC Work Platforms |
John Worden et al. |
Installation
|
19 Oct 2023 |
E1000046-v1 |
Vacuum System Viton O-ring Procurement Specification |
John Worden et al. |
Vacuum
|
02 Mar 2023 |
D1400148-v1 |
LHO LSB Floor Plan |
John Worden |
Observatory Facilities
|
18 Nov 2021 |
D961094-v2 |
Horizontal Access Module Assembly (HAM), LIGO Vacuum Equipment |
Dennis Coyne |
Document Migration
Vacuum
|
29 Jun 2021 |
D990684-v1 |
Final "As-built" Vacuum Equipment Documents & Drawings for Initial LIGO |
John Worden et al. |
Vacuum
|
05 Jan 2021 |
D961174-v1 |
LIGO Vacuum Equipment Issued for As Built - Piping Arrangement Plan, Corner Station, Washington Site |
John Worden |
Document Migration
|
16 Sep 2020 |
E0900402-v1 |
Specification for SS Plate |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001347-v2 |
GNB FDR Submittal A18 |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001348-v2 |
GNB FDR Submittal MCA |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001352-v1 |
GNB FDR Submittal Misc |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001349-v2 |
GNB FDR Submittal MCB |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001345-v2 |
GNB FDR Submittal A16 |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001351-v1 |
GNB FDR Submittal Bellows |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
D1100110-v1 |
Adapter A-16 |
John Worden et al. |
Installation
|
16 Sep 2020 |
C1001350-v2 |
GNB FDR Submittal Mid Station Spool |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
C1001346-v2 |
GNB FDR Submittal A17 |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
E0900406-v1 |
Specification for SS Rolling and Machining. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
E0900405-v1 |
Specification for SS Flange Forgings. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
D0902635-v1 |
Annulus Piping Detail. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
D961175-v1 |
LIGO Vacuum Equipment Reissued for Construction as Noted - Piping Arrangement Elevations, Corner Station, Washington Site |
John Worden |
Document Migration
|
16 Sep 2020 |
E0900007-v1 |
Air Bake Oven |
John Worden et al. |
Requirements
|
22 May 2019 |
M1300164-v8 |
3rd IFO Long-Term Storage Acceptance and Punchlist |
Calum Torrie et al. |
System Engineering
Installation
LIGO-India
|
01 Apr 2015 |
T1000489-v9 |
Specification for LIGO Installation Cleanrooms |
John Worden et al. |
Procurements
Installation
|
01 Aug 2018 |
D1300733-v2 |
LHO Staging Building-aLIGO Facility Modification Plan |
John Worden et al. |
Observatory Facilities
|
27 Sep 2017 |
E1300450-v6 |
FMP Acceptance-Facility Modifications |
Carolyn Peterson et al. |
Observatory Facilities
|
26 Sep 2017 |
D1002509-v1 |
H2 Electronics building - concrete work |
John Worden et al. |
Procurements
Observatory Facilities
|
03 May 2017 |
D1003017-v1 |
H2 Electronics Modular Building Electrical Plan |
John Worden et al. |
Observatory Facilities
|
03 May 2017 |
D1100814-v2 |
H2 Electronics Building HVAC Plan |
John Worden et al. |
Observatory Facilities
|
03 May 2017 |
D1003016-v1 |
H2 Electronics Modular Building Plan |
John Worden et al. |
Observatory Facilities
|
03 May 2017 |
D0810022-v1 |
LHO Warehouse Modifications Architectural Plan |
John Worden et al. |
Procurements
|
03 May 2017 |
D0810023-v1 |
LHO Warehouse Modifications Reflected Ceiling Plan |
John Worden et al. |
Procurements
|
03 May 2017 |
D0810024-v1 |
LHO Warehouse Modifications Electrical Plan |
John Worden et al. |
Procurements
|
03 May 2017 |
D0810025-v1 |
LHO Warehouse Modifications Mechanical HVAC Plan |
John Worden et al. |
Procurements
|
03 May 2017 |
D0810026-v1 |
LHO Warehouse Modifications Curtain Wall and HVAC Sections |
John Worden et al. |
Procurements
|
03 May 2017 |
D0810027-v1 |
LHO Warehouse Modifications Mechanical Schedules |
John Worden et al. |
Procurements
|
03 May 2017 |
D1300361-v2 |
Drawing for LHO Roofing bid package. |
John Worden et al. |
Procurements
Observatory Facilities
|
03 May 2017 |
E1300301-v2 |
Specification for LHO Roofing task. |
John Worden et al. |
Observatory Facilities
Procurements
|
03 May 2017 |
F030014-v2 |
Clean and Bake Request Form |
John Worden et al. |
Policies
Assembly
|
18 Apr 2011 |
D1600459-v1 |
LHO LSB Drawings ZIP file |
John Worden |
Observatory Facilities
|
29 Nov 2016 |
E1600272-v1 |
HVAC / FMCS Screen shots |
John Worden et al. |
Procurements
Observatory Facilities
|
29 Aug 2016 |
L1500103-v1 |
Technical Review Board (TRB) report: Should We Insulate the Beamtube? |
Dennis Coyne et al. |
System Engineering
Vacuum
Technical Review Board
|
15 Dec 2015 |
T1400535-v2 |
Experience with discharging the ETMY test mass at LHO in August 2014 |
Gerardo Moreno et al. |
Commissioning
Suspensions
Vacuum
|
29 Sep 2015 |
L1000022-v1 |
VRB response to waiver request L0900058 |
John Worden et al. |
Vacuum
|
22 Apr 2015 |
L1200067-v1 |
VRB Reply to Optics Cleaning and Baking proposal. (L1100046) |
John Worden |
Vacuum
|
11 Mar 2015 |
L1000346-v1 |
VRB response to waiver request - vibratory tumbling for deburring. |
John Worden |
Vacuum
|
11 Mar 2015 |
L1000178-v1 |
VRB response to L0900066-v: Small quantity of small commercial Viton O-Rings |
John Worden |
System Engineering
Vacuum
|
11 Mar 2015 |
L080102-x0 |
VRB Response to request to relax machining fluid requirements for small parts |
John Worden |
Document Migration
|
11 Mar 2015 |
L070097-x0 |
VRB waiver re: thin film polarizers |
John Worden |
Document Migration
|
11 Mar 2015 |
L070091-x0 |
VRB Response to IO Group request for waivers. |
John Worden |
Document Migration
|
11 Mar 2015 |
D1002843-v1 |
aLIGO Installation, LHO X-End Station, Cartridge & Cleanroom, Layout |
John Worden et al. |
Installation
Observatory Facilities
|
14 Jan 2015 |
D1001797-v2 |
aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout |
Dennis Coyne |
Installation
|
14 Jan 2015 |
D1002847-v1 |
aLigo Installation, LLO Corner Station, Cartridge + Cleanroom, Layout |
John Worden et al. |
Installation
Observatory Facilities
|
14 Jan 2015 |
C1400943-v1 |
SOW LIGO Hanford DCS Computer Room Air Conditioning |
John Worden |
Observatory Facilities
Procurements
|
07 Oct 2014 |
D1400304-v1 |
LHO DCS Facility HVAC Plan and Sections |
John Worden |
Observatory Facilities
|
30 Sep 2014 |
D1400305-v1 |
LHO DCS Facility Reflected Ceiling Plan |
John Worden |
Observatory Facilities
|
30 Sep 2014 |
D1400306-v1 |
LHO DCS Facility Curtain Plan and Details |
John Worden |
Observatory Facilities
|
30 Sep 2014 |
D1400307-v1 |
LHO DCS Facility Schedules, Notes, and Details |
John Worden |
Observatory Facilities
|
30 Sep 2014 |
D1400308-v1 |
LHO DCS Facility Electrical/Data Site Plan |
John Worden |
Observatory Facilities
|
30 Sep 2014 |
C1101241-v1 |
Septum Plate H1, L1 PRC |
John Worden |
Vacuum
|
16 Jul 2014 |
C1101242-v1 |
Septum Plate H2 PRC |
John Worden |
Vacuum
|
16 Jul 2014 |
G060218-x0 |
Facility Modifications & Preparation (FMP): Requirements and Design Breakout Presentation - NSF Review of Advanced LIGO Project |
Dennis Coyne et al. |
Document Migration
|
20 May 2014 |
D960036-x0 |
Rough Pump Located in Beam Tube Enclosure |
John Worden |
Document Migration
|
03 Apr 2014 |
D950146-x0 |
Ham Port Relocation, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950143-x0 |
End Station Washington |
John Worden |
Document Migration
|
03 Apr 2014 |
D950142-x0 |
Mid Station Washington |
John Worden |
Document Migration
|
03 Apr 2014 |
D950137-x0 |
BSC, New Port Locations, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950136-x0 |
Plan "A-A", E Port Locations, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950135-x0 |
BSC Chamber, Detector Equipment Reserved Space, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950134-x0 |
BSC Chamber, Detector Equipment Reserved Space, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950133-x0 |
Ham Chamber, Detector Equipment Reserved Space, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
D950132-x0 |
Ham Chamber, Detector Equipment Reserved Space, Preliminary |
John Worden |
Document Migration
|
03 Apr 2014 |
G960243-x0 |
Vacuum Equipment Prototype Results - Science & Integration Meeting, 12 December 1996 |
John Worden |
Document Migration
|
14 Mar 2014 |
G950069-x0 |
Vacuum Equipment Review |
John Worden |
Document Migration
|
03 Mar 2014 |
E1400072-v1 |
PSI LN2 Calculations |
John Worden |
Vacuum
|
19 Feb 2014 |
G950009-x0 |
Presentation to CBI/PSI for Vacuum Equipment Phase A Update Meeting |
John Worden |
Document Migration
|
18 Feb 2014 |
L1000357-v3 |
Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension |
Douglas Cook et al. |
Final Design
Reviews
Suspensions
|
05 Feb 2014 |
D1300970-v1 |
Wedged Washer-Style Shim |
Mindy Jacobson et al. |
Vacuum
Assembly
Auxiliary Optics
|
01 Nov 2013 |
C1302049-v3 |
Statement of Work for insulation removal at LHO |
John Worden |
Procurements
Observatory Facilities
Vacuum
|
26 Aug 2013 |
C1301598-v2 |
Invitation To Bid for the LIGO Hanford Re-roof |
Rudy Arvizu et al. |
Operations
Procurements
|
10 May 2013 |
G950041-x0 |
Vacuum Equipment Interfaces |
John Worden |
Document Migration
|
02 May 2013 |
G950025-x0 |
Vacuum Equipment Viewgraphs NSF Presentation |
John Worden |
Document Migration
|
02 May 2013 |
G950010-x0 |
Kickoff Meeting - Vacuum Equipment Phase A |
John Worden |
Document Migration
|
02 May 2013 |
G940005-x0 |
Vacuum Equipment Specification Review, 31 August 1994 |
John Worden |
Document Migration
|
23 Apr 2013 |
D1002400-v1 |
aLigo Installation, LHO Corner Station, Cartridge + Cleanroom, Layout |
John Worden et al. |
Installation
System Engineering
|
12 Dec 2012 |
D1200882-v1 |
Septum Viewport Protector for back of vacuum sealing surface |
Gerardo Moreno et al. |
Vacuum
Conceptual Design
|
14 Jun 2012 |
E940002-x0 |
Vacuum Equipment Specification-LIGO Facility (Old LIGO #1100003), Revision 2 |
John Worden |
Document Migration
|
12 Jun 2012 |
C1200346-v2 |
SOW LIGO Hanford H1 Electronics Air Conditioning |
John Worden |
Observatory Facilities
Procurements
|
17 Jan 2012 |
D1200028-v1 |
LIGO H1 Electronics HVAC Plan |
John Worden |
Observatory Facilities
Procurements
|
17 Jan 2012 |
D1200029-v1 |
LIGO H1 Electronics HVAC Plan and Equipment Schedules |
John Worden |
Procurements
Observatory Facilities
|
17 Jan 2012 |
E000120-x0 |
Hanford Checklist - BSC Door Removal |
John Worden |
Document Migration
|
22 Nov 2011 |
C1106855-v1 |
LHO Landscaping Photos - Tumbleweeds |
John Worden |
Observatory Facilities
Operations Business
|
25 Oct 2011 |
C1106854-v1 |
LHO Landscaping Photos |
John Worden |
Operations Business
Observatory Facilities
|
25 Oct 2011 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Procurements
Cleaning
Integration
Fabrication
Vacuum
|
17 Aug 2011 |
C1104440-v2 |
Statement or Work for H2 Electronics Building HVAC |
John Worden |
Procurements
Observatory Facilities
|
02 Jun 2011 |
F030015-v1 |
LIGO Vacuum Bake Oven Procedure and Check List Form |
John Worden |
Policies
|
09 May 2011 |
G1100469-v3 |
FMP Technical - NSF review April2011 |
John Worden |
Observatory Facilities
|
05 May 2011 |
E1000711-v3 |
ALIGO LA Corner Station VE Installation Specification |
John Worden et al. |
Installation
|
11 Apr 2011 |
E1000712-v3 |
Anchor Bolt Installation |
John Worden et al. |
Installation
|
06 Apr 2011 |
E1000708-v1 |
WA Corner Station Installation |
Jodi Fauver et al. |
Installation
|
29 Mar 2011 |
E0900410-v4 |
Vacuum Component List |
John Worden et al. |
Vacuum
|
21 Mar 2011 |
E1000718-v1 |
Specification for Vacuum/Clean Air Piping |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000717-v1 |
Specification for Piping Thermal Insulation |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000713-v1 |
Specification for Piping Design and Material |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000715-v1 |
Specification for Pipe Cleaning |
John Worden et al. |
Installation
|
03 Mar 2011 |
D1003179-v2 |
aLIGO Installation, LHO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
28 Feb 2011 |
D1003180-v2 |
aLIGO Installation, LLO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
24 Feb 2011 |
D961176-v1 |
LIGO Vacuum Equipment Issued for As Built - Piping Arrangement Sections, Corner Station, Washington Site |
John Worden |
Document Migration
|
18 Feb 2011 |
E1000707-v5 |
WA Mid/End VE Installation |
John Worden et al. |
Installation
|
04 Feb 2011 |
D1100113-v1 |
Mid-Station Spool-LHO |
John Worden et al. |
Installation
|
21 Jan 2011 |
D1100111-v1 |
Adapter A-17 |
John Worden et al. |
Installation
|
21 Jan 2011 |
E1000716-v1 |
Component Alignment Procedure |
John Worden et al. |
Installation
|
20 Jan 2011 |
E1000719-v1 |
Contamination Control for Adv. LIGO Vacuum Equipment Installation |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003175-v2 |
aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003176-v2 |
aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
C1001535-v7 |
Statement of Work for LIGO Installation Cleanrooms |
John Worden et al. |
Installation
Procurements
|
20 Jan 2011 |
C1002236-v8 |
SOW Fabrication of aLIGO SEI Install Test Stands |
John Worden et al. |
Installation
Procurements
|
07 Jan 2011 |
D1003178-v1 |
aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
D1003177-v1 |
aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
C1002426-v6 |
Statement of Work for BSC Work Platforms |
John Worden et al. |
Installation
|
02 Dec 2010 |
E1000714-x0 |
Vacuum Valves |
John Worden et al. |
Installation
|
16 Nov 2010 |
C1001836-v1 |
Specification for De-Installation - Washington site. |
John Worden et al. |
Observatory Facilities
Installation
Procurements
|
11 Nov 2010 |
C1002031-v2 |
SOW for H2 Building concrete pad |
John Worden et al. |
Procurements
|
12 Oct 2010 |
|
|
|
None
|
|
D0902632-v7 |
MCA Spool |
John Worden et al. |
Vacuum
|
18 May 2010 |
D0902631-v5 |
MCB Spool |
John Worden et al. |
Vacuum
|
18 May 2010 |
D1000188-v1 |
44 5/8" Grooved and slotted flange |
John Worden et al. |
Vacuum
|
11 May 2010 |
E0900411-v4 |
Specification for Vacuum Equipment Design and Fabrication |
John Worden et al. |
Vacuum
|
08 Apr 2010 |
D1000245-v1 |
IO Tubes CORNER STATION LAYOUT |
John Worden et al. |
Vacuum
|
02 Feb 2010 |
E960085-v2 |
Specification for O-Ring Procurement |
John Worden et al. |
Fabrication
Vacuum
|
22 Jan 2010 |
E0900439-v1 |
Specification for SS Bellows |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900431-v1 |
Specification for O-Ring Installation |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900430-v1 |
Specification for Cleanliness Testing |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900429-v1 |
Specification for Raw Material Handling |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900428-v1 |
Specification for Welding Repairs |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902728-v1 |
Tie Rod assembly 1 1/4 inch |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902687-v3 |
External Loads at Mid Station Spool |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
G0901032-v1 |
Photos of LIGO Facility |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0902724-v2 |
84.25 IN Flange - Flat Faced (PSI Ref. V0494127) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Vacuum
Integration
System Engineering
|
11 Jan 2010 |
D0902729-v1 |
Sample 60 inch Vacuum Test Cover |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0902727-v1 |
Tie Rod assembly 1 inch |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961105-v1 |
Grooved flange 84.25 inch (Ref V0494021) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961104-v1 |
Flange Grooved 72.25 inch (Ref V0494020 ) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961111-v1 |
Flange 60.5 inch Grooved and Slotted |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D970409-v1 |
Flange flat faced 60.5 inch (Ref V0494097) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
E0900408-v1 |
Specification for Welding Inspection. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900404-v1 |
Specification for Vacuum component leak checking. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900407-v2 |
Specification for Vacuum component Bake-Out |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900409-v1 |
Specification for Black Light Inspection. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
E0900403-v2 |
Specification for Vacuum component cleaning. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
D0902630-v1 |
Mid Station Spool |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0902633-v1 |
Sample drawing package |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0902636-v1 |
Shipping Cover Air Purification System |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0902629-x0 |
Vacuum Spool A-18 |
John Worden |
Vacuum
|
23 Nov 2009 |
D0902627-x0 |
Vacuum Spool A-16 |
John Worden |
Vacuum
|
23 Nov 2009 |
D0902628-x0 |
Vacuum Spool A-17 |
John Worden |
Vacuum
|
23 Nov 2009 |
D0902634-x0 |
Flange designs |
John Worden |
Vacuum
|
09 Nov 2009 |
L0900024-v1 |
VRB response to nickel-phosphorous plating issues. |
John Worden |
Vacuum
|
26 Feb 2009 |
L080044-v1 |
In response to L080042-00, Is 303 stainless steel acceptable in the LIGO Vacuum system? |
John Worden |
Vacuum
|
15 Jan 2009 |
T070122-x0 |
Facilities Modifications and Preparations Conceptual Design |
Betsy Weaver et al. |
Document Migration
|
19 Jun 2007 |
G060219-x0 |
Facility Modifications and Preparation (FMP) |
Dennis Coyne et al. |
Document Migration
|
19 May 2006 |
G060152-x0 |
Environmental Disturbances: Early S5 and S4 - LSC Meeting, March 19-22, 2006, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Apr 2006 |
G050217-x0 |
S4 Environmental Disturbances - LSC Meeting, March 20-23, 2005, Livingston LA |
Douglas Cook et al. |
Document Migration
|
28 Mar 2005 |
G040391-x0 |
Progress Since March on S3 Environmental Disturbances - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Nathan Hindman et al. |
Document Migration
|
19 Aug 2004 |
G030329-x0 |
Accoustic Mitigation Team Progress Report |
Douglas Cook et al. |
Document Migration
|
09 Jul 2003 |
E000119-x0 |
Hanford Checklist - Vent Isolatable Volumes |
John Worden |
Document Migration
|
02 Mar 2000 |
E000121-x0 |
Hanford Checklist - Spool Removal |
John Worden |
Document Migration
|
02 Mar 2000 |
E000118-x0 |
Hanford Checklist - Isolatable Volume Pumpdown |
John Worden |
Document Migration
|
02 Mar 2000 |
E000047-x0 |
Pumping the Beam Tube with the Vacuum Equipment-Check List |
John Worden |
Document Migration
|
27 Jan 2000 |
E000046-x0 |
Beam Tube Opening and Closing Procedures |
Rainer Weiss et al. |
Document Migration
|
27 Jan 2000 |
T980239-x0 |
Large Gate Valve Soft Closure Notes |
Psi Psi et al. |
Document Migration
|
01 Feb 1999 |
T980099-x0 |
Gate Valve Acoustic and Vibration Test |
Rainer Weiss et al. |
Document Migration
|
21 Oct 1998 |
T970111-x0 |
Data from Beam Tube Pump Down II |
Warren Carpenter et al. |
Document Migration
|
08 Jul 1997 |
D950131-x0 |
LVEA Corner Station - Crane Arrangement and Hook Coverage, Preliminary |
John Worden |
Document Migration
|
09 Mar 1996 |
G950083-x0 |
NSF Presentation |
John Worden |
Document Migration
|
05 Oct 1995 |
T950025-x0 |
Proposed Alternate Leak Check Method for Beam Tube Module |
John Worden |
Document Migration
|
21 Apr 1995 |
T950040-x0 |
Action Item 37 - Hydrogen and Getter Pumps |
John Worden |
Document Migration
|
18 Jan 1995 |