LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E0900023-v14 |
PROCESS FOR MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO |
Douglas Cook et al. |
Basic R&D
System Engineering
|
27 Oct 2021 |
M0900136-v2 |
Restricted Work Alone Policy |
Charles Taylor et al. |
Policies
Safety
|
23 Jun 2018 |
D1100291-v6 |
aLIGO IAS LHO Monuments |
Douglas Cook et al. |
Installation
Auxiliary Optics
|
30 Oct 2013 |
E1200392-v9 |
Initial Alignment Procedure - LBSC2 As Built |
Jason Oberling et al. |
Installation
|
10 Mar 2014 |
T1400160-v8 |
Optical Lever Inspection and Hanford |
Thomas Vo et al. |
Installation
Auxiliary Optics
|
16 May 2017 |
E1400205-v4 |
IAS LHO Primary Optics As Built Alignment Summary |
Jason Oberling et al. |
Installation
Auxiliary Optics
|
26 Jul 2016 |
E1400204-v5 |
IAS LLO Primary Optics As Built Alignment Summary |
Jason Oberling et al. |
Auxiliary Optics
Installation
|
24 Jul 2016 |
T1500137-v1 |
3IFO IAS Cross Check and Custody (BOM for IAS) |
Jodi Fauver et al. |
System Engineering
|
14 Jun 2016 |
T1500132-v2 |
3IFO IAS Storage Verification |
Jodi Fauver et al. |
System Engineering
|
30 Mar 2015 |
T1000230-v7 |
Initial Alignment Subsystem (IAS), Final Design Document |
Scott Shankle et al. |
Reviews
Final Design
|
26 Mar 2015 |
T1500081-v2 |
3IFO OpLev Inventory Spreadsheets |
Douglas Cook et al. |
Auxiliary Optics
|
18 Mar 2015 |
E1100734-x0 |
Advanced LIGO Initial Alignment Procedures |
Douglas Cook et al. |
Installation
|
10 Mar 2015 |
E1200485-x0 |
AOS IAS - Initial Alignment Document Tree (Index) |
Douglas Cook |
Auxiliary Optics
Document Migration
|
05 Mar 2015 |
E1100690-v10 |
Initial Alignment Procedure - WBSC8 As Built |
Jason Oberling et al. |
Installation
|
11 Jun 2014 |
E1101071-v5 |
Initial Alignment Procedure - WBSC6 As Built |
Douglas Cook et al. |
Installation
Auxiliary Optics
|
05 Jun 2014 |
E1200795-v6 |
Initial Alignment Procedure - WBSC2 As Built |
Jason Oberling et al. |
Installation
|
02 Jun 2014 |
E1200956-v7 |
Initial Alignment Procedure - LBSC4 As Built |
Jason Oberling et al. |
Auxiliary Optics
Installation
|
02 Jun 2014 |
E1100784-v8 |
Initial Alignment Procedure - LHAM4 and LHAM5 As Built |
Ken Mason et al. |
Installation
|
23 May 2014 |
E1100783-v9 |
Initial Alignment Procedure - LHAM2 and LHAM3 As Built |
Douglas Cook et al. |
Installation
|
22 May 2014 |
G990007-x0 |
Large Optics Suspension Assemblies (LOS) - PAC 6 Meeting Presentation, 20-21 May 1999 |
Douglas Cook |
Document Migration
|
16 May 2014 |
E1200393-v6 |
Initial Alignment Procedure - LBSC3 As Built |
Jason Oberling et al. |
Installation
|
05 May 2014 |
E1200957-v5 |
Initial Alignment Procedure - LBSC5 As Built |
Douglas Cook et al. |
Auxiliary Optics
Installation
|
04 Apr 2014 |
G980044-x0 |
LIGO Hanford Laser Safety Presentation Viewgraphs |
Douglas Cook |
Document Migration
|
18 Mar 2014 |
D0902780-v3 |
Mass jack optic support block |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
L1000357-v3 |
Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension |
Douglas Cook et al. |
Suspensions
Final Design
Reviews
|
05 Feb 2014 |
D1200076-v3 |
Alignment Monument Layout, LHO Y-End Station, BSC Mechanical Test Stands |
Douglas Cook et al. |
Auxiliary Optics
Installation
|
17 Jan 2014 |
E1101072-x0 |
Initial Alignment Procedure -LHAM6 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1100782-x0 |
Initial Alignment Procedure -LHAM1 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
Suspensions
Commissioning
System Engineering
Fabrication
Subsystem Test
Basic R&D
System Test
Auxiliary Optics
Core Optics
|
25 Mar 2013 |
D1003196-v3 |
aLIGO TCS 10-in Custom Viewport Flange |
Cheryl Vorvick et al. |
Auxiliary Optics
Vacuum
Preliminary Design
Fabrication
Final Design
|
01 Feb 2013 |
D1101596-v2 |
Alignment Monument Layout, LHO Corner Station, BSC Mechanical Test Stands |
Douglas Cook et al. |
Auxiliary Optics
|
04 Sep 2012 |
E000095-x0 |
Document Change Notice (DCN) |
Douglas Cook |
Document Migration
|
28 Jun 2012 |
E000094-x0 |
Document Change Notice (DCN) |
Douglas Cook |
Document Migration
|
28 Jun 2012 |
E000078-x0 |
Document Change Notice (DCN) |
Douglas Cook |
Document Migration
|
28 Jun 2012 |
E000077-x0 |
Document Change Notice (DCN) |
Douglas Cook |
Document Migration
|
28 Jun 2012 |
E000059-x0 |
Document Change Notice (DCN) |
Douglas Cook et al. |
Document Migration
|
28 Jun 2012 |
D1200832-x0 |
IAS PIPE BRIDGE EXTENTION ANGLE PLATE |
Douglas Cook |
Auxiliary Optics
Installation
|
04 Jun 2012 |
D1003193-v3 |
aLIGO TCS Viewport Enclosure Assembly, H2 CO2 Laser Projection |
Cheryl Vorvick et al. |
Final Design
Preliminary Design
Auxiliary Optics
Vacuum
|
22 Aug 2011 |
D080631-v3 |
O-Ring, 3in Viewports |
Douglas Cook et al. |
Risk Management
Fabrication
Vacuum
|
26 Jul 2011 |
T0900239-v1 |
AOS: Optical Lever and Viewport Conceptual Design |
Robert Schofield et al. |
Auxiliary Optics
|
19 May 2009 |
G1100430-v5 |
AOS - IAS Techincal Review - NSF 2011 |
Douglas Cook |
Meeting
NSF
|
05 May 2011 |
D1002650-v1 |
IAS Layout for H2 FMx, ITMx |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002651-v1 |
IAS Layout for H2 FMy, ITMy |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002643-v1 |
IAS Layout for H1 ITMx |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002653-v1 |
IAS Layout for H2 ETMy |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002647-v1 |
IAS Layout for H1 ETMy |
Douglas Cook et al. |
Auxiliary Optics
|
08 Nov 2010 |
D1002652-x0 |
IAS Layout for H2 ETMx |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002649-x0 |
IAS Layout for H1 SR3, SR2, SRM |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002648-x0 |
IAS Layout for H1 PR3, PR2, PRM |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002646-x0 |
IAS Layout for H1 ETMx |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
D1002645-x0 |
IAS Layout for H1 BS |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
D1002644-x0 |
IAS Layout for H1 ITMy |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
T1000049-v3 |
Procedure for monolithic rehang at LASTI |
Douglas Cook et al. |
Suspensions
Subsystem Test
|
25 Feb 2010 |
L1000003-v3 |
Ear Fabrication Readiness Review |
Gregg Harry et al. |
Suspensions
Final Design
Reviews
|
15 Jan 2010 |
T0900595-v1 |
Production Readiness review for Test Mass and Suspension Mass Ears Questions from the Committee |
Gregg Harry et al. |
Suspensions
Final Design
|
25 Nov 2009 |
T0900055-v1 |
Rehang of the Quad NP with glass masses but metal wires (January 12-23 2009) |
Douglas Cook et al. |
Suspensions
|
29 Apr 2009 |
M080034-v1 |
Magnet Swap Review for Enhanced LIGO |
Norna Robertson |
Reviews
Suspensions
Upgrades
|
13 Mar 2009 |
T080053-x0 |
Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses |
Betsy Weaver et al. |
Document Migration
|
06 Mar 2008 |
T060024-x0 |
Advanced LIGO Mode Cleaner Wire Suspension Preliminary Design Review Report |
GariLynn Billingsley et al. |
Document Migration
|
16 Jan 2008 |
E040179-x0 |
Process Traveler - LIGO PSL Laser |
Douglas Cook |
Document Migration
|
03 Dec 2007 |
T050245-x0 |
Advanced LIGO Suspension Ribbon/Fiber/Ear/Bonding Preliminary Design Review Report |
GariLynn Billingsley et al. |
Document Migration
|
24 Oct 2007 |
T070229-x0 |
AdLIGO PSL Infrastructure PDR Summary |
Douglas Cook |
Document Migration
|
02 Oct 2007 |
T040009-x0 |
Report of the Core Optics Components Design Requirements Review Committee |
Douglas Cook et al. |
Document Migration
|
16 Aug 2007 |
T070094-x0 |
Photon Calibrators Upgrade Proposal |
Douglas Cook et al. |
Document Migration
|
25 Jul 2007 |
T070085-x0 |
Revised PSL table mode matching for eLigo |
Douglas Cook et al. |
Document Migration
|
13 Jun 2007 |
D060532-x0 |
Dial Indicator Bracket 5 |
Douglas Cook |
Document Migration
|
05 Dec 2006 |
D040279-x0 |
triple pendelum retro reflector mount |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040289-x0 |
Transport frame |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040288-x0 |
Laser Diode Crosshair Mount |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040283-x0 |
Pusher Bar Foe COC and SOS Installations |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040287-x0 |
PAM Screw |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040277-x0 |
Intitial Alignment Laser Autocollimator Periscope |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040285-x0 |
TFE Blocks for HAM and BSC Installations |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040286-x0 |
Computer Table |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D040281-x0 |
Three Point Lifting Fixture for HAM Installations |
Douglas Cook |
Document Migration
|
30 Nov 2006 |
D060374-x0 |
CABLE SUPPORT |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040292-x0 |
Theodolite mounting dimensions |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D060424-x0 |
DIAL INDICATOR GUSSET |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D060433-x0 |
DIAL INDICATOR BRACKET 3 |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040295-x0 |
Granite Tri-Square |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D060432-x0 |
DIAL INDICATOR BRACKET 2 |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040294-x0 |
Alignment Irises |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040291-x0 |
TFE Screw Cap |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D060423-x0 |
DIAL INDICATOR MOUNT |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040290-x0 |
Piezo Actuator Mount |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D060427-x0 |
DIAL INDICATOR BRACKET 1 |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
D040293-x0 |
Tilt Table Breadboard Clamps |
Douglas Cook |
Document Migration
|
29 Nov 2006 |
G060040-x0 |
4ITM07 Postmortem - LSC Meeting, March 19-22, 2006, Hanford WA |
Helena Armandula et al. |
Document Migration
|
14 Apr 2006 |
G060050-x0 |
Cleanliness Issues for Advanced LIGO Installations - LSC Meeting, March 19-22, 2006, Hanford WA |
Douglas Cook |
Document Migration
|
14 Apr 2006 |
G050217-x0 |
S4 Environmental Disturbances - LSC Meeting, March 20-23, 2005, Livingston LA |
Douglas Cook et al. |
Document Migration
|
28 Mar 2005 |
E021000-x0 |
SPECIFICATION - Earthquake and Safety Stop Design Requirements |
Mark Barton et al. |
Document Migration
|
09 Aug 2004 |
E040277-x0 |
Installation Procedure for Advanced LIGO Mode Cleaner into LASTI HAM |
Douglas Cook et al. |
Document Migration
|
09 Aug 2004 |
G030660-x0 |
Losses in LHO HR Surfaces - LSC Meeting, November 10th - 13th, Hanford WA |
David Barker et al. |
Document Migration
|
19 Nov 2003 |
G030640-x0 |
Acoustic Mitigation Status for S3 - LSC Meeting, November 10th - 13th, Hanford WA |
Douglas Cook et al. |
Document Migration
|
14 Nov 2003 |
G030496-x0 |
Acoustic Mitigation Progress - LSC Meeting, August 18th - 21st, Hannover, Germany |
Douglas Cook et al. |
Document Migration
|
10 Sep 2003 |
G030329-x0 |
Accoustic Mitigation Team Progress Report |
Douglas Cook et al. |
Document Migration
|
09 Jul 2003 |
D030310-x0 |
Auxillary Optical Lever QPD Mounts |
Douglas Cook |
Document Migration
|
08 Jul 2003 |
D030309-x0 |
ITM (BSC) Translation Fixture |
Douglas Cook |
Document Migration
|
08 Jul 2003 |
T030022-x0 |
Installation Specification - BSC7 ITMx Replacement |
Douglas Cook |
Document Migration
|
08 Jul 2003 |
D030134-x0 |
Molded Bumper Insert for the 1/4-20 SOS Earthquake Stops |
Douglas Cook |
Document Migration
|
19 Mar 2003 |
D020699-x0 |
1/4-20 Earthquake Stop Screw with 1mm Dia. Glass Rod |
Douglas Cook |
Document Migration
|
19 Mar 2003 |
D030135-x0 |
Molded O-Rings for 1/4-20 SOS Earthquake Stops |
Douglas Cook |
Document Migration
|
19 Mar 2003 |
D030141-x0 |
1mm Fused Silica Rod for 1/4-20 Earthquake Stops |
Douglas Cook |
Document Migration
|
19 Mar 2003 |
G020396-x0 |
Environmental Disturbances (Including S1-Stoppers) - LSC Meeting, August 19th - 22nd, Hanford WA |
Betsy Weaver et al. |
Document Migration
|
05 Sep 2002 |
D020421-x0 |
MMT2 Beam Blocking Baffle |
Douglas Cook |
Document Migration
|
15 Aug 2002 |
T020106-x0 |
2K MMT2 & MC2 beam blocking baffle pics |
Douglas Cook |
Document Migration
|
15 Aug 2002 |
D020185-x0 |
LIGO Hanford Laser Safety System 1 Corner Station |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020186-x0 |
LIGO Hanford Laser Safety System 2 Mid & End Station |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020176-x0 |
PSL Reference Cavity Test Components |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020184-x0 |
RF Laser Mount |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
T020002-x0 |
LIGO Hanford Observatory Optical Lever Calibration |
Douglas Cook |
Document Migration
|
16 Jan 2002 |
E000116-x0 |
Installation Specification: Procedure for using SUS Controller Pitch and Yaw Monitor Signals with Optical Lever Signals to Realign Large Suspended Optics, Rev. 01 |
Douglas Cook |
Document Migration
|
03 Oct 2000 |
E000444-x0 |
Installation Specification: ETMy In-Situ Cleaning, Rev. A |
Betsy Weaver et al. |
Document Migration
|
03 Oct 2000 |
T000005-x0 |
2k FMy Pendulum Q |
Betsy Weaver et al. |
Document Migration
|
29 Sep 2000 |
E000181-x0 |
Process Traveler |
Douglas Cook |
Document Migration
|
08 Aug 2000 |
E000182-x0 |
Process Traveler |
Douglas Cook |
Document Migration
|
08 Aug 2000 |
E000117-x0 |
Installation Specification: ETMy Realignment and Related Tasks |
Betsy Weaver et al. |
Document Migration
|
21 Mar 2000 |
E000106-x0 |
Optical Lever Calibration |
Douglas Cook |
Document Migration
|
10 Mar 2000 |
E000062-x0 |
LOS Installation Procedures for BSC Chambers, Rev. C |
Douglas Cook |
Document Migration
|
18 Feb 2000 |
E000061-x0 |
LOS Installation Procedures for HAM Chambers, Rev. C |
Douglas Cook |
Document Migration
|
18 Feb 2000 |
T980046-x0 |
Water Quality Report from Anatek Labs, Inc. |
Douglas Cook |
Document Migration
|
27 May 1998 |