Document List by Author

Jodi Fauver of LIGO - Hanford Observatory is listed as an author on the following documents:
(List events moderated by Jodi Fauver)

LIGO-Number Title Author(s) Topic(s) Last Updated
T1200220-v5 LHO H1 Viewports-As Installed Lisa Austin et al. Auxiliary Optics
Installation
15 Apr 2015
F1500003-v3 Third IFO Component Request Form and Procedure Dennis Coyne et al. Operations
System Engineering
24 Apr 2024
E1000654-v5 Specification for LIGO BSC Work Platforms John Worden et al. Installation
19 Oct 2023
E1201035-v25 aLIGO Chamber Entry & Exit Procedures Calum Torrie et al. System Engineering
Safety
27 Mar 2023
E0900047-v23 LIGO Contamination Control Plan Betsy Weaver et al. Risk Management
Observatory Facilities
Cleaning
17 Sep 2020
D1100112-v1 Adapter A-18 Jodi Fauver et al. Installation
16 Sep 2020
D1100110-v1 Adapter A-16 John Worden et al. Installation
16 Sep 2020
T1500105-v1 3IFO Viewport Inventory Jodi Fauver et al. System Engineering
17 Jul 2019
M1300164-v8 3rd IFO Long-Term Storage Acceptance and Punchlist Calum Torrie et al. Installation
System Engineering
LIGO-India
01 Apr 2015
T1000489-v9 Specification for LIGO Installation Cleanrooms John Worden et al. Installation
Procurements
01 Aug 2018
D1300733-v2 LHO Staging Building-aLIGO Facility Modification Plan John Worden et al. Observatory Facilities
27 Sep 2017
E1300450-v6 FMP Acceptance-Facility Modifications Carolyn Peterson et al. Observatory Facilities
26 Sep 2017
F030014-v2 Clean and Bake Request Form John Worden et al. Assembly
Policies
18 Apr 2011
T1500137-v1 3IFO IAS Cross Check and Custody (BOM for IAS) Jodi Fauver et al. System Engineering
14 Jun 2016
T1500135-v2 3IFO Viewport Cross Check and Custody Jodi Fauver et al. System Engineering
19 May 2016
D1300461-v1 aLIGO PSL Reference Cavity Jodi Fauver et al. Laser Systems
19 Oct 2015
G1500720-v2 Technical Progress-3IFO for NSF Review 2015 Jodi Fauver NSF
Reports
Activity
03 Jun 2015
T1500119-v2 3IFO ISC Cross Check and Custody Jodi Fauver et al. System Engineering
01 Apr 2015
T1500133-v2 3IFO SEI Combined Cross Check and Custody Jodi Fauver et al. System Engineering
31 Mar 2015
T1500111-v3 3IFO TCS Cross Check and Custody Jodi Fauver et al. System Engineering
31 Mar 2015
T1500132-v2 3IFO IAS Storage Verification Jodi Fauver et al. System Engineering
30 Mar 2015
T1500107-v5 3IFO SUS Cross Check and Custody Jodi Fauver et al. System Engineering
30 Mar 2015
T1500128-v2 3IFO INS/FMP Cross Check and Custody Jodi Fauver et al. System Engineering
30 Mar 2015
T1500106-v3 3IFO SLC aka Baffles Cross Check and Custody Jodi Fauver et al. System Engineering
26 Mar 2015
T1500124-v1 3IFO IO Cross Check and Custody Jodi Fauver et al. Input Optics
25 Mar 2015
T1500108-v2 3IFO OpLev Cross Check and Custody Jodi Fauver et al. System Engineering
23 Mar 2015
T1500091-v1 3IFO PSL ISS Photodetector Array Inventory Peter King Email Gary Davis et al. Project Controls
20 Mar 2015
T1500104-v1 3IFO COC Inventory Jodi Fauver et al. Core Optics
20 Mar 2015
T1500110-v1 3IFO COC Cross Check and Inventory Jodi Fauver et al. System Engineering
20 Mar 2015
T1500112-v2 3IFO SLC BOM Mitchell Robinson et al. System Engineering
20 Mar 2015
T1500109-v1 3IFO PCal Cross Check and Custody Jodi Fauver et al. System Engineering
20 Mar 2015
T1400712-v1 aLIGO OpLev BOM Spreadsheets OBSOLETE Jodi Fauver et al. System Engineering
18 Mar 2015
T1500081-v2 3IFO OpLev Inventory Spreadsheets Douglas Cook et al. Auxiliary Optics
18 Mar 2015
T1500083-v1 3IFO PSL Table Contents Packing Lists/Inventory Gary Davis et al. Project Controls
System Engineering
04 Mar 2015
D1002843-v1 aLIGO Installation, LHO X-End Station, Cartridge & Cleanroom, Layout John Worden et al. Installation
Observatory Facilities
14 Jan 2015
D1002847-v1 aLigo Installation, LLO Corner Station, Cartridge + Cleanroom, Layout John Worden et al. Observatory Facilities
Installation
14 Jan 2015
T1200149-v1 Cleaning Procedure for Optics Lens Caps Calum Torrie et al. Cleaning
19 Aug 2014
T1400056-x0 3IFO Viewport Requirements by Chamber (LTS) Calum Torrie et al. Requirements
13 Feb 2014
T1300093-v7 Prudential Body Box Results Kaitlin Gushwa et al. System Engineering
Basic R&D
01 Nov 2013
T1200148-v2 SLC 3rd IFO Inventory Lisa Austin et al. Installation
Auxiliary Optics
Final Design
Procurements
27 Sep 2013
D1002400-v1 aLigo Installation, LHO Corner Station, Cartridge + Cleanroom, Layout John Worden et al. Installation
System Engineering
12 Dec 2012
None
C1201946-v2 Garb Laundry and Maintenance SOW Jodi Fauver et al. Procurements
29 Feb 2012
E1000711-v3 ALIGO LA Corner Station VE Installation Specification John Worden et al. Installation
11 Apr 2011
E1000712-v3 Anchor Bolt Installation John Worden et al. Installation
06 Apr 2011
E1000708-v1 WA Corner Station Installation Jodi Fauver et al. Installation
29 Mar 2011
E1000718-v1 Specification for Vacuum/Clean Air Piping John Worden et al. Installation
03 Mar 2011
E1000717-v1 Specification for Piping Thermal Insulation John Worden et al. Installation
03 Mar 2011
E1000713-v1 Specification for Piping Design and Material John Worden et al. Installation
03 Mar 2011
E1000715-v1 Specification for Pipe Cleaning John Worden et al. Installation
03 Mar 2011
D1003179-v2 aLIGO Installation, LHO Corner Station Vacuum Equipment Layout John Worden et al. Installation
28 Feb 2011
D1003180-v2 aLIGO Installation, LLO Corner Station Vacuum Equipment Layout John Worden et al. Installation
24 Feb 2011
E1000707-v5 WA Mid/End VE Installation John Worden et al. Installation
04 Feb 2011
D1100113-v1 Mid-Station Spool-LHO John Worden et al. Installation
21 Jan 2011
D1100111-v1 Adapter A-17 John Worden et al. Installation
21 Jan 2011
E1000716-v1 Component Alignment Procedure John Worden et al. Installation
20 Jan 2011
E1000719-v1 Contamination Control for Adv. LIGO Vacuum Equipment Installation John Worden et al. Installation
20 Jan 2011
D1003175-v2 aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003176-v2 aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
C1001535-v7 Statement of Work for LIGO Installation Cleanrooms John Worden et al. Installation
Procurements
20 Jan 2011
C1002236-v8 SOW Fabrication of aLIGO SEI Install Test Stands John Worden et al. Installation
Procurements
07 Jan 2011
D1003178-v1 aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
D1003177-v1 aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
C1002426-v6 Statement of Work for BSC Work Platforms John Worden et al. Installation
02 Dec 2010
E1000714-x0 Vacuum Valves John Worden et al. Installation
16 Nov 2010
None
G1000478-v2 LIGO Clean and Bake Best Practices Jodi Fauver System Engineering
28 Apr 2010

Number of documents found: 67


DCC Version 3.5.0, contact DCC Help