Document List by Author

Lisa Austin of LIGO - California Institute of Technology is listed as an author on the following documents:
(List events moderated by Lisa Austin)

LIGO-Number Title Author(s) Topic(s) Last Updated
D1101562-v1 Arm Cavity Baffle Photo Detector Holder (for YAG-444 Silicon PD Package) Lisa Austin Auxiliary Optics
29 Oct 2024
T1200220-v5 LHO H1 Viewports-As Installed Lisa Austin et al. Installation
Auxiliary Optics
15 Apr 2015
D1101885-v2 aLIGO AOS ITM ELLIPTICAL BAFFLE SUSPENSION ASSY Jesse Terrazas et al. Basic R&D
Auxiliary Optics
27 Jun 2012
D1003183-v1 aLIGO_Manifold Cryo Baffle_Radial Segment Assembly Tim Nguyen Basic R&D
Auxiliary Optics
04 Aug 2011
D1300646-v1 Bracket Shim Lisa Austin et al. Assembly
25 Jul 2013
D1002084-v3 aLIGO_AOS_Manifold Cryo Baffle_Outer Ring Assy Tim Nguyen et al. Installation
Assembly
Auxiliary Optics
30 Jul 2013
D0900778-v2 Faraday Isolator Magnet Attachment Plate Manuel Ruiz Auxiliary Optics
Basic R&D
10 Jul 2012
E1100810-v14 Arm Cavity Baffle Installation/De-installation Procedure Lisa Austin et al. Installation
Auxiliary Optics
06 Dec 2016
E1100267-v1 6 inch Vacuum Viewport Window Peter Fritschel Auxiliary Optics
Vacuum
25 Mar 2011
T1100445-v2 AOS SLC: Signal Recycling Cavity Baffles Final Design Michael Smith et al. Auxiliary Optics
Final Design
13 Oct 2011
E1300577-v7 SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document Michael Smith et al. Auxiliary Optics
Assembly
Installation
10 May 2017
T1000746-v1 Viewports Subsystem Final Design Document Michael Smith et al. Auxiliary Optics
Final Design
13 Mar 2011
T1200313-v3 BS Elliptical Baffle Final Design Michael Smith et al. Auxiliary Optics
Final Design
15 Dec 2016
T1100165-v2 AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR Lisa Austin et al. Final Design
Auxiliary Optics
14 Dec 2016
E1100718-v8 Mode Cleaner Tube Baffle Assembly and Installation Procedure Lisa Austin et al. Assembly
Auxiliary Optics
Installation
06 Dec 2016
E1000563-v7 DCN - Release of Output Faraday Isolator Assembly Manuel Ruiz et al. Final Design
Auxiliary Optics
11 Dec 2015
E1200914-v130 aLIGO AOS SLC and TMS Inventory Lisa Austin et al. Assembly
Auxiliary Optics
Installation
Cleaning
17 Apr 2015
T1000311-v7 aLIGO TransMonSUS Assembly & Installation Hazards Analysis Ken Mailand et al. Final Design
Auxiliary Optics
Safety
21 Jan 2015
E1201012-v8 TransMonSUS Assembly & Installation Procedure Ken Mailand et al. Final Design
Auxiliary Optics
Sensing and Control
22 Oct 2014
E1200498-x0 aLIGO, AOS, View Ports Lisa Austin Auxiliary Optics
04 Aug 2014
E1200499-x0 aLIGO, AOS, TMS Lisa Austin et al. Auxiliary Optics
07 Jul 2014
E1200050-v2 DCN -TMS Various Releases and Revisions for production Craig Conley et al. Change Control
Auxiliary Optics
20 Jun 2014
E1100730-v5 HAM and BSC SEI In-Vacuum Cabling Counts including payload cables as well as BSC SLC ACB and BSC TCS Calum Torrie et al. System Engineering
18 Jun 2014
D1300791-v1 OFI EQ Stops for magnets Lisa Austin Assembly
21 Feb 2014
E1100491-v6 SLC Mode Cleaner Tube Baffle Install Hazard Analysis Michael Smith et al. Safety
Auxiliary Optics
20 Feb 2014
E1000890-v8 SLC Arm Cavity Baffle Install Hazard Analysis Michael Smith et al. Safety
Auxiliary Optics
Final Design
Installation
20 Feb 2014
E1100984-v8 SLC Signal Recycling Cavity Baffle Install Hazard Analysis Michael Smith et al. Safety
Auxiliary Optics
20 Feb 2014
E1300634-v6 Advanced LIGO AOS ETM Arm Cavity Baffle Assembly Procedure Lisa Austin Auxiliary Optics
Assembly
19 Feb 2014
T1100468-v4 Stray Light Control - Baffle Locales Lisa Austin Installation
Auxiliary Optics
26 Oct 2011
T1200148-v2 SLC 3rd IFO Inventory Lisa Austin et al. Procurements
Auxiliary Optics
Final Design
Installation
27 Sep 2013
E1100867-v17 Advanced LIGO AOS ITM Arm Cavity Baffle Assembly Procedure Stephany Foley et al. Auxiliary Optics
Assembly
24 Sep 2013
T1300340-x0 AOS SLC Signal Recycling Cavity Baffles Assembly and Installation Lisa Austin et al. Installation
Assembly
Auxiliary Optics
13 Sep 2013
D1000549-v6 aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY Craig Conley et al. Auxiliary Optics
Installation
Final Design
Integration
23 Aug 2013
T1100446-v4 ITM Elliptical Baffle FD Michael Smith et al. Auxiliary Optics
Final Design
14 Aug 2013
E1300409-v3 Install Manifold/Cryo Baf LHO ETM X Test Michael Smith et al. Auxiliary Optics
Subsystem Test
02 Aug 2013
D1300658-x0 Manifold Cryopump Baffle Alignment Tool Lisa Austin Auxiliary Optics
Installation
25 Jul 2013
D1200525-v6 aLIGO TMS Mass Base Assembly Craig Conley et al. Suspensions
Auxiliary Optics
22 Jul 2013
D1101527-v6 aLIGO TMS Mass Secondary Assembly Craig Conley et al. Auxiliary Optics
Final Design
Suspensions
19 Jul 2013
D1300645-x0 FHCS, modified Lisa Austin et al. Assembly
18 Jul 2013
E1200497-x0 aLIGO, AOS, SLC Lisa Austin Auxiliary Optics
17 Jul 2013
D1200120-v4 aLIGO TMS Upper Stage Blade Cartridge Craig Conley et al. Suspensions
Auxiliary Optics
15 Jul 2013
D1300622-v1 Titanium Threaded Stud, cut to size Lisa Austin Auxiliary Optics
Assembly
11 Jul 2013
D1001005-v7 SLC ARM CAVITY BAFFLE BLADE ASSY Niem Nguyen et al. Modelling
Auxiliary Optics
03 Jul 2013
D1300616-x0 Manifold Cryopump Magnet Gap Tool Lisa Austin Assembly
Auxiliary Optics
03 Jul 2013
E1300420-v2 Manifold/cryo baffle Blade Balance Weight Michael Smith et al. Auxiliary Optics
Final Design
21 Jun 2013
E1100312-v1 DCN - AOS SLC Fixtures and Tooling Lisa Austin Installation
Auxiliary Optics
Assembly
18 Jun 2013
E1100842-v8 Specification for Oxidation of Polished Mirror (Super #8) Stainless Steel for aLIGO Baffles and Beam Dumps Heidy Kelman et al. Auxiliary Optics
Fabrication
17 Jun 2013
E1000458-v3 BOM-aLIGO TMS SEISMIC STOP SAFETY STRUCTURE Craig Conley Auxiliary Optics
01 Apr 2012
E1100837-v2 BOM HAM SCRAPER BAFFLE ASSEMBLY Michael Hillard et al. Final Design
Auxiliary Optics
02 May 2013
E1101001-v1 Signal Recycling Cavity Baffles Production Plan Michael Smith et al. Auxiliary Optics
Final Design
29 Apr 2013
E1101023-v1 Signal Recycling Cavity Baffles Fabrication and Installation Test Plan Michael Smith et al. Auxiliary Optics
Final Design
29 Apr 2013
E1200677-v5 Advanced LIGO AOS ITM Elliptical Baffle Assembly Procedure Lisa Austin et al. Auxiliary Optics
Assembly
23 Apr 2013
E070124-v3 Septum Window Coating Specification Lisa Austin et al. Fabrication
Auxiliary Optics
18 Mar 2013
E1101021-v4 AOS SLC ITM Elliptical Baffle Installation Procedure Michael Smith et al. Auxiliary Optics
Installation
14 Feb 2013
D1200781-v2 aLIGO_AOS_ACB Suspension Rod Tim Nguyen et al. Basic R&D
Auxiliary Optics
04 Feb 2013
E1100335-v10 DCN to Release Arm Cavity Baffle Revisions Lisa Austin et al. Fabrication
Installation
Auxiliary Optics
Assembly
03 Jan 2013
D1201508-x0 OFI Wire Loop Tool Lisa Austin Assembly
Auxiliary Optics
30 Nov 2012
D1201364-v1 Nickel Plated Drill Bushing Lisa Austin et al. Procurements
Auxiliary Optics
Assembly
13 Nov 2012
E1201011-x0 TransMonSUS Assembly & Installation Procedure Ken Mailand et al. Auxiliary Optics
Sensing and Control
Final Design
12 Nov 2012
D1201361-v1 SLC Baffle Earthquake Stop Sleeve Lisa Austin et al. Final Design
Auxiliary Optics
01 Nov 2012
E1200660-v3 AOS SLC BS Elliptical Baffle Installation Procedure Michael Smith et al. Auxiliary Optics
Final Design
02 Aug 2012
E1200662-v2 AOS SLC BS Elliptical Baffle Production Plan Michael Smith et al. Final Design
Auxiliary Optics
30 Jul 2012
E1101152-x0 DCN- Various TMS Telecope, Table and integration Components Craig Conley et al. Change Control
Auxiliary Optics
27 Apr 2012
C1202433-v4 Statement of Work Manifold Cryopump Tube Baffle ITM Weldment Assembly Lisa Austin Auxiliary Optics
Fabrication
Procurements
20 Apr 2012
E1100289-v2 DCN-Release of ALIGO SRM AR BAFFLE ASSY Lisa Austin Auxiliary Optics
Assembly
18 Apr 2012
E1000470-v3 BOM - AdLIGO_AOS_Damper Holder Assy Manuel Ruiz et al. Final Design
Auxiliary Optics
18 Apr 2012
E1100311-v2 BOM FOR ALIGO SRM AR BAFFLE ASSEMBLY Lisa Austin Auxiliary Optics
Assembly
16 Apr 2012
E1100391-v2 BOM FOR aLIGO SR3 HR-AR BAFFLE ASSY Norris Kilpatrick et al. Assembly
Auxiliary Optics
16 Apr 2012
G1200154-v8 AOS SLC Stray Light Control and Viewports Lisa Austin et al. NSF
Auxiliary Optics
09 Apr 2012
C1201789-v2 SOW - TMS Top Mass, machined parts Lisa Austin Procurements
Auxiliary Optics
03 Apr 2012
D1200434-v1 OFI Wedge Prism, 1.0 Inch Lisa Austin Installation
Auxiliary Optics
12 Mar 2012
C1107670-v3 Statement of Work - Cleaning of LHO Mode Cleaner Tube Baffles parts Lisa Austin Cleaning
Auxiliary Optics
04 Jan 2012
D1000684-v2 SLC TUBE LOWER MTG PLATE Niem Nguyen et al. Auxiliary Optics
Modelling
23 Nov 2011
E1100733-v1 6 inch Vacuum Viewport Window, uncoated Lisa Austin Auxiliary Optics
Vacuum
02 Aug 2011
D1101548-v1 Uncoated high quality, non-wedged, 6" Viewport, Optic Lisa Austin Auxiliary Optics
Vacuum
02 Aug 2011
C1104703-v1 SOW for 6 inch Viewport Clamps and Flanges Lisa Austin Auxiliary Optics
Procurements
20 Jun 2011
D1101528-v1 Flat Washer Natural Beige Color, #10 Screw Lisa Austin Auxiliary Optics
Assembly
28 Jul 2011
D1101529-v1 Flat Washer Natural Beige Color, 1/4 Screw Lisa Austin Auxiliary Optics
Assembly
28 Jul 2011
C1105144-v1 Statement of Work, Fabrication of Viewport Guard Assembly Lisa Austin Procurements
Auxiliary Optics
21 Jul 2011
C1101260-v1 Statement of Work (SOW) for Mode Cleaner Tube Baffle Assembly Heidy Kelman et al. Procurements
Fabrication
Auxiliary Optics
Final Design
08 Jul 2011
C1104441-v1 Statement of Work for High Quality, Wedged, Windows Lisa Austin Procurements
Auxiliary Optics
16 Jun 2011
E070069-v1 SPECIFICATION - High Quality Window Polish, Advanced LIGO GariLynn Billingsley et al. Auxiliary Optics
Document Migration
16 Jun 2011
C1101402-v3 Arm Cavity Baffle Statement of Work (Machined Parts) Lisa Austin Auxiliary Optics
Procurements
08 Mar 2011
E1100050-v5 Responses to AOS SLC ACB FDR Questions Mohana Mageswaran et al. Auxiliary Optics
Final Design
08 Apr 2011
E1100082-v1 DCN to Release Arm Cavity Baffle Photo-Detector Piece Parts Lisa Austin Auxiliary Optics
Procurements
06 Apr 2011
E1000285-v2 DCN TO RELEASE SLC ARM CAVITY BAFFLE TWO HOLE DRAWINGS Lisa Austin et al. Auxiliary Optics
Fabrication
28 Feb 2011
E1000868-v2 DCN TO RELEASE SLC ARM CAVITY BAFFLE ONE HOLE DRAWINGS Lisa Austin et al. Fabrication
Auxiliary Optics
24 Feb 2011

Number of documents found: 87


DCC Version 3.5.0, contact DCC Help