LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1101775-v6 |
aLIGO, ELECTRICAL FEEDTHROUGH TYPES, TYPICAL SUBFLANGES, AND PORT CONFIGURATIONS |
Eduardo Sanchez |
System Engineering
Installation
Integration
|
12 May 2016 |
T2400167-v1 |
Updated model of the D-R isotherm applied to large UHV vacuum systems based on the framework originally developed by R. Weiss for iLIGO |
Albert Lazzarini et al. |
Integration
Vacuum
Other data analysis
Operations
Modelling
|
25 Jun 2024 |
E1200225-v8 |
Coding Standard for TwinCAT Slow Controls Software |
Daniel Sigg |
State Control and Monitoring
|
05 Mar 2024 |
D1101847-v5 |
aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMX, L1 |
Aidan Brooks et al. |
Integration
Preliminary Design
Fabrication
System Engineering
Final Design
Auxiliary Optics
Vacuum
|
23 Oct 2019 |
D1101846-v1 |
aLIGO TCS HWS Optics Assembly In Vacuum, L1 HAM4 |
Aidan Brooks et al. |
Preliminary Design
Integration
Vacuum
Fabrication
System Engineering
Final Design
Auxiliary Optics
|
24 May 2012 |
D1101848-v1 |
aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMY, L1 |
Aidan Brooks et al. |
Final Design
Fabrication
System Engineering
Auxiliary Optics
Vacuum
Integration
Preliminary Design
|
03 May 2012 |
E1600151-x0 |
aLIGO, PSL, Intensity Stabilization (ISS) Second Loop |
Jeffrey Kissel |
Sensing and Control
Laser Systems
Input Optics
Integration
|
23 Jun 2023 |
D1700361-v3 |
Layout of SLC Baffles with new 2017 SLiC Baffles |
Eduardo Sanchez et al. |
System Engineering
Integration
|
22 Jun 2023 |
E1400144-x0 |
aLIGO,DAQ,PEM |
Robert Schofield et al. |
Integration
Data Acquisition System
|
19 May 2023 |
E1200568-v3 |
Procedure to move BS SUS from container to SEI ISI on test stand |
Janeen Romie et al. |
Integration
Suspensions
|
19 Oct 2022 |
T1100232-x0 |
aLIGO Damping Loop Design and Performance (Level 2.0 Design) |
Jeffrey Kissel |
Suspensions
Integration
Requirements
Subsystem Test
Commissioning
|
19 Sep 2022 |
T1300559-v1 |
Changing the ISI CPS offsets to the Cartesian (CART) Basis |
Brian Lantz et al. |
Seismic Isolation
Integration
|
09 May 2022 |
G1300086-v2 |
HAM6 Coordinate System Definitions |
Jeffrey Kissel |
Suspensions
Integration
Seismic Isolation
Modelling
Sensing and Control
System Engineering
Commissioning
Final Design
|
08 Mar 2015 |
T2000417-v7 |
NCAL Prototype H1 Surveying Distance Measurement |
Timesh Mistry et al. |
Integration
Basic R&D
|
25 Jun 2021 |
S1202314-x0 |
L1-VDC-YC2 DC Power Supply Rack |
David Kinzel |
System Engineering
Installation
Integration
|
26 Apr 2021 |
S1202313-x0 |
L1-VDC-YC1 DC Power Supply Rack |
David Kinzel |
Integration
Installation
System Engineering
|
26 Apr 2021 |
S1202312-x0 |
L1-VDC-XC2 DC Power Supply Rack |
David Kinzel |
Installation
System Engineering
Integration
|
26 Apr 2021 |
S1202311-x0 |
L1-VDC-XC1 DC Power Supply Rack |
David Kinzel |
Integration
System Engineering
Installation
|
26 Apr 2021 |
T2000407-v3 |
Instrument Science White Paper 2020 |
Peter Fritschel et al. |
Upgrades
Detector
Basic R&D
Integration
|
31 Aug 2020 |
T1900409-v5 |
Instrument Science White Paper 2019 |
Brian Lantz et al. |
Basic R&D
Installation
Detector
Integration
|
06 Nov 2019 |
G0900436-v1 |
eLIGO: So how's it turning out? |
Michael Zucker et al. |
System Test
Detector
Upgrades
Installation
Meeting
Commissioning
Integration
|
30 Jul 2019 |
G1800953-v1 |
[GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network |
Jeffrey Kissel |
Observatory Facilities
Integration
Astrophysics / Multi-messenger
Preliminary Design
Upgrades
Calibration
Basic R&D
Modelling
Sensing and Control
System Engineering
External Collaboration
GW source predictions
|
12 Mar 2019 |
T1800414-v3 |
ISI Models Sensor-Correction update for Control During Earthquakes |
Brian Lantz |
Seismic Isolation
Integration
|
14 Dec 2018 |
G1800399-v1 |
Seismic Control during Earthquakes: Review of new technique |
Brian Lantz et al. |
Seismic Isolation
Integration
|
14 Dec 2018 |
M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
System Test
Operations
Detector
Policies
Installation
Commissioning
Final Design
System Engineering
Fabrication
Integration
Conceptual Design
Requirements
Subsystem Test
|
07 Jun 2018 |
D1101385-v3 |
India1-MC3 Optic Assembly |
Janeen Romie et al. |
Suspensions
Integration
|
23 Jan 2018 |
D1101383-v3 |
India1-MC1 Optic Assembly |
Janeen Romie et al. |
Suspensions
Integration
|
23 Jan 2018 |
D1101365-v2 |
L1-MC1 Optic Assembly |
Janeen Romie et al. |
Integration
Suspensions
|
23 Jan 2018 |
D1101376-v2 |
H1-MC3 Optic Assembly |
Janeen Romie et al. |
Integration
Suspensions
|
23 Jan 2018 |
E1700390-v1 |
(OPOS) Optical Parametric Oscillator Suspension Controls Arrangement Poster |
Jeffrey Kissel |
Squeezer
Sensing and Control
Final Design
Assembly
Suspensions
Subsystem Test
Integration
|
13 Nov 2017 |
T1700481-v3 |
Technical notes - Increased damping time on the ISI |
Brian Lantz |
Seismic Isolation
Integration
|
06 Nov 2017 |
D1300020-v3 |
ALIGO, SUS, HSTS STRUCTURE, FC SPRAY GUARD ASSY. |
Eduardo Sanchez |
Installation
Fabrication
System Engineering
Integration
|
04 Sep 2014 |
G1700809-v1 |
What Does Low Frequency Control Look Like in the 2G+ and 3G Era? |
Jeffrey Kissel |
State Control and Monitoring
Conceptual Design
Integration
Suspensions
Basic R&D
System Engineering
Sensing and Control
Upgrades
Squeezer
Seismic Isolation
|
12 Jun 2017 |
E1200031-x0 |
aLIGO Optical Levers Assembly and Installation Documents |
Eric James |
Integration
|
10 May 2017 |
D1101463-v7 |
CABLE HARNESS ROUTING CONFIGURATION, HAM 3 |
Eduardo Sanchez |
Installation
Preliminary Design
Integration
Conceptual Design
|
10 Apr 2017 |
G1501372-v1 |
O1 DARM Loop Design Comprisons and Critiques |
Jeffrey Kissel |
Incoming Inspection
Integration
Sensing and Control
Modelling
Calibration
|
07 Mar 2017 |
S1202300-x0 |
L1-SUS-R3 HAM4 Field Rack |
Anna Aitken |
Installation
System Engineering
Integration
|
08 Aug 2012 |
G1400001-v3 |
The Status of Advanced LIGO: Light at the End of the Tunnels! |
Jeffrey Kissel et al. |
Core Optics
Suspensions
State Control and Monitoring
Integration
Laser Systems
Data Acquisition System
Input Optics
Public Talk / Colloquium
Seismic Isolation
Auxiliary Optics
Commissioning
System Engineering
Sensing and Control
|
17 Aug 2016 |
G1601604-v1 |
Seismic Isolation and Alignment - the road ahead |
Brian Lantz |
Seismic Isolation
Commissioning
Integration
|
16 Aug 2016 |
E1600204-v1 |
ECR: PSL frontend should handle a binary output ON/OFF request as true binary, not a 16 bit integer |
Keita Kawabe |
Laser Systems
Integration
|
12 Jul 2016 |
D1101429-v4 |
ALIGO, BSC FLOORING ORIENTATION DETAILS |
Eduardo Sanchez |
Installation
Integration
|
14 Jun 2016 |
D1200111-v2 |
CABLE HARNESS ROUTING CONFIGURATION, LBSC5 / WBSC10 |
Eduardo Sanchez |
System Engineering
Preliminary Design
Integration
|
14 Jun 2016 |
G1401291-v3 |
aLIGO HSTS Damping Loop Design Comparison |
Jeffrey Kissel et al. |
Suspensions
Integration
Commissioning
Sensing and Control
Modelling
|
25 May 2016 |
G1401290-v1 |
aLIGO HSTS "Level 2" Damping Loop Design |
Betsy Weaver et al. |
Seismic Isolation
Modelling
Sensing and Control
Commissioning
Suspensions
Integration
|
25 May 2016 |
D1300031-v3 |
ALIGO, SUS, BS STRUCTURE, FC SPRAY GUARD ASSY. |
Eduardo Sanchez |
System Engineering
Fabrication
Final Design
Integration
|
02 May 2016 |
P1400074-v5 |
Self Amplified Lock of a Ultra-narrow Linewidth Optical Cavity |
Kiwamu Izumi et al. |
Commissioning
Basic R&D
Modelling
Integration
|
08 Jan 2016 |
D1200895-v1 |
DC Power Supply Rack VDC-C6 |
David Kinzel |
Integration
Installation
System Engineering
|
16 Nov 2015 |
D1200893-v1 |
DC Power Supply Rack VDC-C4 |
David Kinzel |
Installation
System Engineering
Integration
|
10 Nov 2015 |
E1500002-v2 |
MSR and END Station Fiber Patches Spreadsheet |
David Kinzel |
Integration
Observatory Facilities
|
28 Aug 2015 |
T1500406-v3 |
SEI watchdog update - saturation history update |
Hugo Paris et al. |
Seismic Isolation
Integration
|
12 Aug 2015 |
E1500325-v1 |
ECR - Update SEI watchdogs with better handling of saturation history |
Brian Lantz |
Seismic Isolation
Integration
|
30 Jul 2015 |
T1400012-v1 |
Jan 2014 ISI update |
Brian Lantz et al. |
Seismic Isolation
Integration
|
24 Jun 2015 |
G1500668-v1 |
Squeezing now and in the future: the road to 10 dB |
Katherine Dooley et al. |
Requirements
Integration
Commissioning
Basic R&D
Sensing and Control
Meeting
Squeezer
|
01 Jun 2015 |
G1500694-x0 |
Keeping a good lock |
Keita Kawabe |
Meeting
Commissioning
Integration
|
20 May 2015 |
D1200881-x0 |
Rack Dnumbers |
David Kinzel |
System Engineering
Installation
Integration
|
07 Apr 2015 |
G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
Suspensions
Assembly
Subsystem Test
Requirements
Integration
System Test
Commissioning
Installation
|
08 Mar 2015 |
G1301007-v1 |
Advanced LIGO OMC Operation and Characterization |
William Korth |
Sensing and Control
Integration
|
08 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Integration
Basic R&D
Sensing and Control
|
05 Mar 2015 |
L1500028-v1 |
Documentation of Two Hour Lock Milestone for H1 |
Peter Fritschel et al. |
Integration
|
02 Mar 2015 |
E1400335-x0 |
DCN, REVISED END STATION SYSTEM LAYOUT |
Eduardo Sanchez |
System Engineering
Installation
Integration
|
09 Feb 2015 |
E1400104-x0 |
ECR: Replacing the Cart-Bias custom ramp parts with cdsFiltCrtl2 blocks |
Brian Lantz et al. |
Seismic Isolation
State Control and Monitoring
Integration
|
29 Jan 2015 |
T1200040-v3 |
L1 HAM3 Gouy Telescope Preparation |
Valery Frolov et al. |
Integration
Subsystem Test
Sensing and Control
Fabrication
Installation
|
21 Jan 2015 |
G1100873-v4 |
aLIGO TCS HWS Reference Dimensions to ETM Telescope (H2 ETMY) |
Aidan Brooks et al. |
Installation
Auxiliary Optics
Fabrication
System Engineering
Final Design
Vacuum
Integration
|
19 Jan 2015 |
D1300075-v4 |
CABLE HARNESS ROUTING CONFIGURATION, HAM 1 |
Eduardo Sanchez |
System Engineering
Installation
Integration
|
19 Jan 2015 |
G1401362-v1 |
HEPI update, bias hold and watchdog |
Brian Lantz et al. |
Integration
Installation
Seismic Isolation
|
08 Dec 2014 |
E1300632-x0 |
aLIGO, Integration Testing, Full Interferometer Test |
Daniel Sigg |
Integration
|
06 Dec 2014 |
G1400397-v2 |
Advanced LIGO Integration: timeline scenario for 2014 |
Peter Fritschel |
Integration
|
12 Nov 2014 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Integration
Suspensions
Installation
Modelling
Meeting
Basic R&D
Commissioning
Seismic Isolation
|
21 Oct 2014 |
G1401237-v1 |
Advanced LIGO Commissioning Overview |
Daniel Sigg |
Integration
|
15 Oct 2014 |
E1300626-x0 |
aLIGO, Integration Testing |
Daniel Sigg |
Integration
|
06 Oct 2014 |
T1200418-v4 |
LLO MC2 Violin Mode Q |
Mark Barton et al. |
Modelling
Subsystem Test
Integration
Suspensions
|
09 Sep 2014 |
G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
Subsystem Test
Requirements
Integration
Suspensions
Assembly
Commissioning
Installation
System Test
|
22 Aug 2014 |
L1400119-v1 |
Documentation of Two Hour Lock Milestone for L1 |
Peter Fritschel et al. |
Integration
|
30 Jul 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Integration
Data Acquisition System
Suspensions
Installation
Final Design
System Engineering
Seismic Isolation
System Test
|
10 Jul 2014 |
E1300630-x0 |
aLIGO, Integration Testing, HIFO-XY Test |
Daniel Sigg |
Integration
|
08 Jul 2014 |
L1400110-x0 |
Executive Summary of the LHO HIFO-XY Test |
Daniel Sigg et al. |
Integration
|
08 Jul 2014 |
E1300627-x0 |
aLIGO, Integration Testing, One Arm Test |
Daniel Sigg |
Integration
|
24 Jun 2014 |
E1400213-x0 |
DCN, Initial release of aLIGO, SUS, BS WIRE SHIELDING BAFFLE ASSY. AND ASSOCIATED DOCS. |
Eduardo Sanchez |
Suspensions
Integration
Installation
System Engineering
Fabrication
|
20 Jun 2014 |
E1300803-x0 |
Changes Resulting from the L1 DRMI Testing |
Peter Fritschel et al. |
Integration
Commissioning
|
20 Jun 2014 |
E1400300-x0 |
Changes Resulting from Input Mode Cleaner Testing |
Dennis Coyne |
Integration
Commissioning
|
19 Jun 2014 |
E1300628-x0 |
aLIGO, Integration Testing, Input Mode Cleaner Test |
Daniel Sigg et al. |
Integration
|
19 Jun 2014 |
E1200930-v2 |
ECR, End Station EtherCAT Chassis Modification for TCS |
Aidan Brooks et al. |
Installation
Auxiliary Optics
Data Acquisition System
Integration
Requirements
|
19 Jun 2014 |
E1300631-x0 |
aLIGO, Integration Testing, Dual Recycled Michelson Test |
Daniel Sigg |
Integration
|
19 Jun 2014 |
E1300809-v1 |
ECR - remove the IPC links in ISI which come from SUS |
Brian Lantz |
Integration
Suspensions
Seismic Isolation
|
19 Jun 2014 |
E1300495-v3 |
LLO DRMI In-air Check List |
Valery Frolov |
Commissioning
Integration
|
18 Jun 2014 |
T1400011-v1 |
Integration Testing: Systems meeting discussion, 15 Jan 2014 |
Peter Fritschel |
Commissioning
Integration
|
18 Jun 2014 |
G1300602-v2 |
LLO ISC Software Overview (for DRMI test) |
Anamaria Effler et al. |
Integration
Sensing and Control
|
18 Jun 2014 |
T1300991-v1 |
PRMI Locking Procedure |
Ryan DeRosa et al. |
Commissioning
Integration
|
18 Jun 2014 |
T1300174-v2 |
Commissioning Advanced LIGO’s HIFO-Y |
Daniel Sigg et al. |
System Engineering
Commissioning
Integration
|
18 Jun 2014 |
L1300176-v1 |
Executive Summary of the LHO HIFO-Y Test |
Daniel Sigg et al. |
Integration
|
18 Jun 2014 |
L1300219-v1 |
Summary of the H1 Input Mode Cleaner Testing |
Paul Fulda et al. |
Integration
|
18 Jun 2014 |
T1100201-v4 |
Commissioning the Advanced LIGO L1 Input Mode Cleaner |
Peter Fritschel et al. |
Integration
Input Optics
|
18 Jun 2014 |
E1400002-v1 |
ECR - Acquisition of FSS RFPD DC signal |
Kiwamu Izumi |
Integration
Commissioning
|
16 Jun 2014 |
D1301036-v1 |
aLIGO, SYS, 1" DIA WITNESS OPTIC |
Eduardo Sanchez |
Installation
System Engineering
Integration
|
13 Jun 2014 |
G1400193-v2 |
Initial alignment plan |
Sheila Dwyer et al. |
Integration
Meeting
|
12 Jun 2014 |
G1400551-v1 |
System Integration Status and Challenges, Post Project Commissioning Plans to Meet Science Goals |
Daniel Sigg |
Integration
|
27 May 2014 |
G1400529-v2 |
Commissioning of Advanced LIGO |
Kiwamu Izumi |
Commissioning
Integration
|
25 May 2014 |
G1400560-v2 |
Simulation Study for aLIGO lock acquisition |
Kiwamu Izumi et al. |
Integration
Modelling
|
24 May 2014 |
T1400053-v2 |
Integration testing report for the L1 DRMI |
Peter Fritschel et al. |
Integration
|
19 May 2014 |
T1400298-v1 |
Simulation study for aLIGO lock acquisition |
Kiwamu Izumi et al. |
Meeting
Modelling
Commissioning
Integration
|
03 May 2014 |
T1400284-v2 |
Glitches in the Blend Switch - Origin and Fix |
Brian Lantz |
Seismic Isolation
State Control and Monitoring
Integration
Suspensions
|
17 Apr 2014 |
T1300014-v5 |
Aligo, BSC Flooring + HAM ISI, Witness Sample Placement Requirements |
Eduardo Sanchez |
Integration
Installation
System Engineering
|
28 Mar 2014 |
E1200030-x0 |
aLIGO Optical Levers Final Design Documents |
Eric James |
Integration
|
25 Mar 2014 |
E1300939-v3 |
Procedure For Attachment Of The Pcal Periscope Alignment Target To ETM Quad Frame |
Craig Conley et al. |
Auxiliary Optics
Integration
|
31 Jan 2014 |
G1301210-v1 |
Software Watchdogs for SUS + ISI + HEPI |
Brian Lantz et al. |
Integration
Suspensions
Seismic Isolation
Data and Computing
|
29 Jan 2014 |
T1200437-v3 |
Advanced LIGO Interferometer Integration |
Peter Fritschel et al. |
Integration
Commissioning
|
11 Dec 2013 |
T1300936-v1 |
HEPI model updates Nov 2013 |
Brian Lantz et al. |
Integration
Seismic Isolation
Installation
|
09 Dec 2013 |
E1300872-v1 |
ECR - HEPI model updates Nov 2013 |
Brian Lantz et al. |
Integration
Seismic Isolation
|
09 Dec 2013 |
E1300906-v1 |
HEPI script updates Nov 2013 |
Brian Lantz |
Integration
Seismic Isolation
|
09 Dec 2013 |
E1300907-v1 |
update to SEI watchdog data rate in the science frames |
Brian Lantz |
Seismic Isolation
Data Acquisition System
Integration
|
09 Dec 2013 |
E1200639-v1 |
aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System |
Aidan Brooks et al. |
System Test
System Engineering
Auxiliary Optics
Installation
Integration
Subsystem Test
|
22 Nov 2013 |
D1300227-x0 |
aLIGO Pcal Development Layout |
Craig Conley |
Integration
Auxiliary Optics
Installation
|
11 Sep 2013 |
E1300629-x0 |
aLIGO, Integration Testing, HIFO-Y Test |
Daniel Sigg |
Integration
|
27 Aug 2013 |
D1000549-v6 |
aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY |
Craig Conley et al. |
Installation
Auxiliary Optics
Final Design
Integration
|
23 Aug 2013 |
L1200261-v2 |
Executive Summary of the One Arm Test |
Daniel Sigg et al. |
Integration
|
16 Aug 2013 |
G1300719-v3 |
Performance of the Advanced LIGO Input Optics |
Chris Mueller |
Integration
Subsystem Test
Input Optics
Public Talk / Colloquium
Commissioning
|
09 Jul 2013 |
E1300249-v2 |
ECR - Change Locating Dimensions of Oplev/Pcal Receiver Installations in all End VEAs |
Craig Conley |
Change Control
Integration
Installation
Auxiliary Optics
|
10 May 2013 |
G1300437-v1 |
aLIGO Installed A-1 Adapter Measurements, Oplev/Pcal Receiver Side (LHO, LLO) |
Craig Conley |
Integration
Installation
Auxiliary Optics
|
09 Apr 2013 |
D1300263-v1 |
ALIGO, AOS, VIEWPORT LEAK TEST FIXTURE, PROOF TEST CAP ASSY. FOR [H1/L1] CO2P V.P. |
Eduardo Sanchez |
Integration
Installation
Fabrication
|
28 Mar 2013 |
G1300258-v1 |
Arm Length Stabilization at LHO |
Daniel Sigg |
Integration
|
17 Mar 2013 |
T1100080-v3 |
Commissioning Advanced LIGO's First Arm Cavity |
Daniel Sigg et al. |
System Engineering
Commissioning
Integration
|
17 Mar 2013 |
L1300018-v2 |
Summary of the L1 Input Mode Cleaner Testing |
Peter Fritschel et al. |
Integration
|
16 Feb 2013 |
G1201295-v2 |
Magnetic coupling to test mass suspensions. |
Peter Fritschel |
Subsystem Test
Integration
Suspensions
|
02 Jan 2013 |
D1201460-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations |
Craig Conley |
Integration
Installation
Auxiliary Optics
Commissioning
|
12 Nov 2012 |
D1201459-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations |
Craig Conley |
Auxiliary Optics
Installation
Commissioning
Integration
|
12 Nov 2012 |
E1200908-v1 |
Electronics and Optics Change Request from the One Arm Test |
Daniel Sigg |
Integration
|
19 Oct 2012 |
E1200621-x0 |
BOM and Formal Drawing Tree, aLIGO TCS HWS Table Assembly, HAM4 |
Mindy Jacobson |
Assembly
Integration
Fabrication
System Engineering
Auxiliary Optics
Installation
|
13 Jun 2012 |
D1200900-x0 |
DC Power Supply Rack VDC-YC2 |
David Kinzel |
Integration
System Engineering
Installation
|
12 Jun 2012 |
D1200898-x0 |
DC Power Supply Rack VDC-XC2 |
David Kinzel |
System Engineering
Installation
Integration
|
12 Jun 2012 |
D1200896-x0 |
DC Power Supply Rack VDC-C7 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
D1200894-x0 |
DC Power Supply Rack VDC-C5 |
David Kinzel |
Integration
System Engineering
Installation
|
12 Jun 2012 |
D1200891-x0 |
DC Power Supply Rack VDC-C2 |
David Kinzel |
System Engineering
Installation
Integration
|
12 Jun 2012 |
D1200892-x0 |
DC Power Supply Rack VDC-C3 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
D1200890-x0 |
DC Power Supply Rack VDC-C1 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
G1200588-v1 |
aLIGO Integration status for 23 May 2012 meeting |
Peter Fritschel |
Integration
|
23 May 2012 |
D1101849-v1 |
aLIGO TCS HWS OPTICS ASSY In Vac, L1 HAM5 |
Aidan Brooks et al. |
Integration
Preliminary Design
Fabrication
System Engineering
Final Design
Auxiliary Optics
Vacuum
|
04 May 2012 |
T1000075-v2 |
Advanced Interferometer Configurations White Paper |
Rana Adhikari et al. |
Integration
Upgrades
Basic R&D
Sensing and Control
System Engineering
|
26 Apr 2012 |
E080462-v1 |
Infrasonic Microphone and PEM++ |
Gabor Szeifert et al. |
Preliminary Design
Computing/archiving
Conceptual Design
Integration
Observatory Facilities
Requirements
Data Acquisition System
Data and Computing
Other data analysis
System Test
Calibration
Upgrades
Basic R&D
Data quality / vetoes
Sensing and Control
Fabrication
|
01 Apr 2012 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Fabrication
Vacuum
Cleaning
Procurements
Integration
|
17 Aug 2011 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Integration
System Engineering
Vacuum
|
11 Jan 2010 |
T980044-v1 |
Determination of Global and Local Coordinate Axes for the LIGO Sites |
Albert Lazzarini |
Installation
System Engineering
Vacuum
Integration
|
11 May 2009 |
D950148-v2 |
LVEA and VEA Foundations Relative to the Beam Tube Center Line |
Dennis Coyne |
Integration
Vacuum
System Engineering
Installation
|
10 May 2009 |