Document List by Topic

These documents on Integration (subtopic of Activity) are available:
(List events on Integration)

LIGO-Number Title Author(s) Topic(s) Last Updated
D1101775-v6 aLIGO, ELECTRICAL FEEDTHROUGH TYPES, TYPICAL SUBFLANGES, AND PORT CONFIGURATIONS Eduardo Sanchez System Engineering
Installation
Integration
12 May 2016
T2400167-v1 Updated model of the D-R isotherm applied to large UHV vacuum systems based on the framework originally developed by R. Weiss for iLIGO Albert Lazzarini et al. Integration
Vacuum
Other data analysis
Operations
Modelling
25 Jun 2024
E1200225-v8 Coding Standard for TwinCAT Slow Controls Software Daniel Sigg State Control and Monitoring
05 Mar 2024
D1101847-v5 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMX, L1 Aidan Brooks et al. Integration
Preliminary Design
Fabrication
System Engineering
Final Design
Auxiliary Optics
Vacuum
23 Oct 2019
D1101846-v1 aLIGO TCS HWS Optics Assembly In Vacuum, L1 HAM4 Aidan Brooks et al. Preliminary Design
Integration
Vacuum
Fabrication
System Engineering
Final Design
Auxiliary Optics
24 May 2012
D1101848-v1 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMY, L1 Aidan Brooks et al. Final Design
Fabrication
System Engineering
Auxiliary Optics
Vacuum
Integration
Preliminary Design
03 May 2012
E1600151-x0 aLIGO, PSL, Intensity Stabilization (ISS) Second Loop Jeffrey Kissel Sensing and Control
Laser Systems
Input Optics
Integration
23 Jun 2023
D1700361-v3 Layout of SLC Baffles with new 2017 SLiC Baffles Eduardo Sanchez et al. System Engineering
Integration
22 Jun 2023
E1400144-x0 aLIGO,DAQ,PEM Robert Schofield et al. Integration
Data Acquisition System
19 May 2023
E1200568-v3 Procedure to move BS SUS from container to SEI ISI on test stand Janeen Romie et al. Integration
Suspensions
19 Oct 2022
T1100232-x0 aLIGO Damping Loop Design and Performance (Level 2.0 Design) Jeffrey Kissel Suspensions
Integration
Requirements
Subsystem Test
Commissioning
19 Sep 2022
T1300559-v1 Changing the ISI CPS offsets to the Cartesian (CART) Basis Brian Lantz et al. Seismic Isolation
Integration
09 May 2022
G1300086-v2 HAM6 Coordinate System Definitions Jeffrey Kissel Suspensions
Integration
Seismic Isolation
Modelling
Sensing and Control
System Engineering
Commissioning
Final Design
08 Mar 2015
T2000417-v7 NCAL Prototype H1 Surveying Distance Measurement Timesh Mistry et al. Integration
Basic R&D
25 Jun 2021
S1202314-x0 L1-VDC-YC2 DC Power Supply Rack David Kinzel System Engineering
Installation
Integration
26 Apr 2021
S1202313-x0 L1-VDC-YC1 DC Power Supply Rack David Kinzel Integration
Installation
System Engineering
26 Apr 2021
S1202312-x0 L1-VDC-XC2 DC Power Supply Rack David Kinzel Installation
System Engineering
Integration
26 Apr 2021
S1202311-x0 L1-VDC-XC1 DC Power Supply Rack David Kinzel Integration
System Engineering
Installation
26 Apr 2021
T2000407-v3 Instrument Science White Paper 2020 Peter Fritschel et al. Upgrades
Detector
Basic R&D
Integration
31 Aug 2020
T1900409-v5 Instrument Science White Paper 2019 Brian Lantz et al. Basic R&D
Installation
Detector
Integration
06 Nov 2019
G0900436-v1 eLIGO: So how's it turning out? Michael Zucker et al. System Test
Detector
Upgrades
Installation
Meeting
Commissioning
Integration
30 Jul 2019
G1800953-v1 [GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network Jeffrey Kissel Observatory Facilities
Integration
Astrophysics / Multi-messenger
Preliminary Design
Upgrades
Calibration
Basic R&D
Modelling
Sensing and Control
System Engineering
External Collaboration
GW source predictions
12 Mar 2019
T1800414-v3 ISI Models Sensor-Correction update for Control During Earthquakes Brian Lantz Seismic Isolation
Integration
14 Dec 2018
G1800399-v1 Seismic Control during Earthquakes: Review of new technique Brian Lantz et al. Seismic Isolation
Integration
14 Dec 2018
M1500313-v2 Process Flow for Engineering Operations of the LIGO Detector Systems Dennis Coyne et al. System Test
Operations
Detector
Policies
Installation
Commissioning
Final Design
System Engineering
Fabrication
Integration
Conceptual Design
Requirements
Subsystem Test
07 Jun 2018
D1101385-v3 India1-MC3 Optic Assembly Janeen Romie et al. Suspensions
Integration
23 Jan 2018
D1101383-v3 India1-MC1 Optic Assembly Janeen Romie et al. Suspensions
Integration
23 Jan 2018
D1101365-v2 L1-MC1 Optic Assembly Janeen Romie et al. Integration
Suspensions
23 Jan 2018
D1101376-v2 H1-MC3 Optic Assembly Janeen Romie et al. Integration
Suspensions
23 Jan 2018
E1700390-v1 (OPOS) Optical Parametric Oscillator Suspension Controls Arrangement Poster Jeffrey Kissel Squeezer
Sensing and Control
Final Design
Assembly
Suspensions
Subsystem Test
Integration
13 Nov 2017
T1700481-v3 Technical notes - Increased damping time on the ISI Brian Lantz Seismic Isolation
Integration
06 Nov 2017
D1300020-v3 ALIGO, SUS, HSTS STRUCTURE, FC SPRAY GUARD ASSY. Eduardo Sanchez Installation
Fabrication
System Engineering
Integration
04 Sep 2014
G1700809-v1 What Does Low Frequency Control Look Like in the 2G+ and 3G Era? Jeffrey Kissel State Control and Monitoring
Conceptual Design
Integration
Suspensions
Basic R&D
System Engineering
Sensing and Control
Upgrades
Squeezer
Seismic Isolation
12 Jun 2017
E1200031-x0 aLIGO Optical Levers Assembly and Installation Documents Eric James Integration
10 May 2017
D1101463-v7 CABLE HARNESS ROUTING CONFIGURATION, HAM 3 Eduardo Sanchez Installation
Preliminary Design
Integration
Conceptual Design
10 Apr 2017
G1501372-v1 O1 DARM Loop Design Comprisons and Critiques Jeffrey Kissel Incoming Inspection
Integration
Sensing and Control
Modelling
Calibration
07 Mar 2017
S1202300-x0 L1-SUS-R3 HAM4 Field Rack Anna Aitken Installation
System Engineering
Integration
08 Aug 2012
G1400001-v3 The Status of Advanced LIGO: Light at the End of the Tunnels! Jeffrey Kissel et al. Core Optics
Suspensions
State Control and Monitoring
Integration
Laser Systems
Data Acquisition System
Input Optics
Public Talk / Colloquium
Seismic Isolation
Auxiliary Optics
Commissioning
System Engineering
Sensing and Control
17 Aug 2016
G1601604-v1 Seismic Isolation and Alignment - the road ahead Brian Lantz Seismic Isolation
Commissioning
Integration
16 Aug 2016
E1600204-v1 ECR: PSL frontend should handle a binary output ON/OFF request as true binary, not a 16 bit integer Keita Kawabe Laser Systems
Integration
12 Jul 2016
D1101429-v4 ALIGO, BSC FLOORING ORIENTATION DETAILS Eduardo Sanchez Installation
Integration
14 Jun 2016
D1200111-v2 CABLE HARNESS ROUTING CONFIGURATION, LBSC5 / WBSC10 Eduardo Sanchez System Engineering
Preliminary Design
Integration
14 Jun 2016
G1401291-v3 aLIGO HSTS Damping Loop Design Comparison Jeffrey Kissel et al. Suspensions
Integration
Commissioning
Sensing and Control
Modelling
25 May 2016
G1401290-v1 aLIGO HSTS "Level 2" Damping Loop Design Betsy Weaver et al. Seismic Isolation
Modelling
Sensing and Control
Commissioning
Suspensions
Integration
25 May 2016
D1300031-v3 ALIGO, SUS, BS STRUCTURE, FC SPRAY GUARD ASSY. Eduardo Sanchez System Engineering
Fabrication
Final Design
Integration
02 May 2016
P1400074-v5 Self Amplified Lock of a Ultra-narrow Linewidth Optical Cavity Kiwamu Izumi et al. Commissioning
Basic R&D
Modelling
Integration
08 Jan 2016
D1200895-v1 DC Power Supply Rack VDC-C6 David Kinzel Integration
Installation
System Engineering
16 Nov 2015
D1200893-v1 DC Power Supply Rack VDC-C4 David Kinzel Installation
System Engineering
Integration
10 Nov 2015
E1500002-v2 MSR and END Station Fiber Patches Spreadsheet David Kinzel Integration
Observatory Facilities
28 Aug 2015
T1500406-v3 SEI watchdog update - saturation history update Hugo Paris et al. Seismic Isolation
Integration
12 Aug 2015
E1500325-v1 ECR - Update SEI watchdogs with better handling of saturation history Brian Lantz Seismic Isolation
Integration
30 Jul 2015
T1400012-v1 Jan 2014 ISI update Brian Lantz et al. Seismic Isolation
Integration
24 Jun 2015
G1500668-v1 Squeezing now and in the future: the road to 10 dB Katherine Dooley et al. Requirements
Integration
Commissioning
Basic R&D
Sensing and Control
Meeting
Squeezer
01 Jun 2015
G1500694-x0 Keeping a good lock Keita Kawabe Meeting
Commissioning
Integration
20 May 2015
D1200881-x0 Rack Dnumbers David Kinzel System Engineering
Installation
Integration
07 Apr 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel Suspensions
Assembly
Subsystem Test
Requirements
Integration
System Test
Commissioning
Installation
08 Mar 2015
G1301007-v1 Advanced LIGO OMC Operation and Characterization William Korth Sensing and Control
Integration
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Integration
Basic R&D
Sensing and Control
05 Mar 2015
L1500028-v1 Documentation of Two Hour Lock Milestone for H1 Peter Fritschel et al. Integration
02 Mar 2015
E1400335-x0 DCN, REVISED END STATION SYSTEM LAYOUT Eduardo Sanchez System Engineering
Installation
Integration
09 Feb 2015
E1400104-x0 ECR: Replacing the Cart-Bias custom ramp parts with cdsFiltCrtl2 blocks Brian Lantz et al. Seismic Isolation
State Control and Monitoring
Integration
29 Jan 2015
T1200040-v3 L1 HAM3 Gouy Telescope Preparation Valery Frolov et al. Integration
Subsystem Test
Sensing and Control
Fabrication
Installation
21 Jan 2015
G1100873-v4 aLIGO TCS HWS Reference Dimensions to ETM Telescope (H2 ETMY) Aidan Brooks et al. Installation
Auxiliary Optics
Fabrication
System Engineering
Final Design
Vacuum
Integration
19 Jan 2015
D1300075-v4 CABLE HARNESS ROUTING CONFIGURATION, HAM 1 Eduardo Sanchez System Engineering
Installation
Integration
19 Jan 2015
G1401362-v1 HEPI update, bias hold and watchdog Brian Lantz et al. Integration
Installation
Seismic Isolation
08 Dec 2014
E1300632-x0 aLIGO, Integration Testing, Full Interferometer Test Daniel Sigg Integration
06 Dec 2014
G1400397-v2 Advanced LIGO Integration: timeline scenario for 2014 Peter Fritschel Integration
12 Nov 2014
T1400672-x0 Report from the Commissioning Workshop on Suspensions at Virgo Jeffrey Kissel et al. Integration
Suspensions
Installation
Modelling
Meeting
Basic R&D
Commissioning
Seismic Isolation
21 Oct 2014
G1401237-v1 Advanced LIGO Commissioning Overview Daniel Sigg Integration
15 Oct 2014
E1300626-x0 aLIGO, Integration Testing Daniel Sigg Integration
06 Oct 2014
T1200418-v4 LLO MC2 Violin Mode Q Mark Barton et al. Modelling
Subsystem Test
Integration
Suspensions
09 Sep 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel Subsystem Test
Requirements
Integration
Suspensions
Assembly
Commissioning
Installation
System Test
22 Aug 2014
L1400119-v1 Documentation of Two Hour Lock Milestone for L1 Peter Fritschel et al. Integration
30 Jul 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. Integration
Data Acquisition System
Suspensions
Installation
Final Design
System Engineering
Seismic Isolation
System Test
10 Jul 2014
E1300630-x0 aLIGO, Integration Testing, HIFO-XY Test Daniel Sigg Integration
08 Jul 2014
L1400110-x0 Executive Summary of the LHO HIFO-XY Test Daniel Sigg et al. Integration
08 Jul 2014
E1300627-x0 aLIGO, Integration Testing, One Arm Test Daniel Sigg Integration
24 Jun 2014
E1400213-x0 DCN, Initial release of aLIGO, SUS, BS WIRE SHIELDING BAFFLE ASSY. AND ASSOCIATED DOCS. Eduardo Sanchez Suspensions
Integration
Installation
System Engineering
Fabrication
20 Jun 2014
E1300803-x0 Changes Resulting from the L1 DRMI Testing Peter Fritschel et al. Integration
Commissioning
20 Jun 2014
E1400300-x0 Changes Resulting from Input Mode Cleaner Testing Dennis Coyne Integration
Commissioning
19 Jun 2014
E1300628-x0 aLIGO, Integration Testing, Input Mode Cleaner Test Daniel Sigg et al. Integration
19 Jun 2014
E1200930-v2 ECR, End Station EtherCAT Chassis Modification for TCS Aidan Brooks et al. Installation
Auxiliary Optics
Data Acquisition System
Integration
Requirements
19 Jun 2014
E1300631-x0 aLIGO, Integration Testing, Dual Recycled Michelson Test Daniel Sigg Integration
19 Jun 2014
E1300809-v1 ECR - remove the IPC links in ISI which come from SUS Brian Lantz Integration
Suspensions
Seismic Isolation
19 Jun 2014
E1300495-v3 LLO DRMI In-air Check List Valery Frolov Commissioning
Integration
18 Jun 2014
T1400011-v1 Integration Testing: Systems meeting discussion, 15 Jan 2014 Peter Fritschel Commissioning
Integration
18 Jun 2014
G1300602-v2 LLO ISC Software Overview (for DRMI test) Anamaria Effler et al. Integration
Sensing and Control
18 Jun 2014
T1300991-v1 PRMI Locking Procedure Ryan DeRosa et al. Commissioning
Integration
18 Jun 2014
T1300174-v2 Commissioning Advanced LIGO’s HIFO-Y Daniel Sigg et al. System Engineering
Commissioning
Integration
18 Jun 2014
L1300176-v1 Executive Summary of the LHO HIFO-Y Test Daniel Sigg et al. Integration
18 Jun 2014
L1300219-v1 Summary of the H1 Input Mode Cleaner Testing Paul Fulda et al. Integration
18 Jun 2014
T1100201-v4 Commissioning the Advanced LIGO L1 Input Mode Cleaner Peter Fritschel et al. Integration
Input Optics
18 Jun 2014
E1400002-v1 ECR - Acquisition of FSS RFPD DC signal Kiwamu Izumi Integration
Commissioning
16 Jun 2014
D1301036-v1 aLIGO, SYS, 1" DIA WITNESS OPTIC Eduardo Sanchez Installation
System Engineering
Integration
13 Jun 2014
G1400193-v2 Initial alignment plan Sheila Dwyer et al. Integration
Meeting
12 Jun 2014
G1400551-v1 System Integration Status and Challenges, Post Project Commissioning Plans to Meet Science Goals Daniel Sigg Integration
27 May 2014
G1400529-v2 Commissioning of Advanced LIGO Kiwamu Izumi Commissioning
Integration
25 May 2014
G1400560-v2 Simulation Study for aLIGO lock acquisition Kiwamu Izumi et al. Integration
Modelling
24 May 2014
T1400053-v2 Integration testing report for the L1 DRMI Peter Fritschel et al. Integration
19 May 2014
T1400298-v1 Simulation study for aLIGO lock acquisition Kiwamu Izumi et al. Meeting
Modelling
Commissioning
Integration
03 May 2014
T1400284-v2 Glitches in the Blend Switch - Origin and Fix Brian Lantz Seismic Isolation
State Control and Monitoring
Integration
Suspensions
17 Apr 2014
T1300014-v5 Aligo, BSC Flooring + HAM ISI, Witness Sample Placement Requirements Eduardo Sanchez Integration
Installation
System Engineering
28 Mar 2014
E1200030-x0 aLIGO Optical Levers Final Design Documents Eric James Integration
25 Mar 2014
E1300939-v3 Procedure For Attachment Of The Pcal Periscope Alignment Target To ETM Quad Frame Craig Conley et al. Auxiliary Optics
Integration
31 Jan 2014
G1301210-v1 Software Watchdogs for SUS + ISI + HEPI Brian Lantz et al. Integration
Suspensions
Seismic Isolation
Data and Computing
29 Jan 2014
T1200437-v3 Advanced LIGO Interferometer Integration Peter Fritschel et al. Integration
Commissioning
11 Dec 2013
T1300936-v1 HEPI model updates Nov 2013 Brian Lantz et al. Integration
Seismic Isolation
Installation
09 Dec 2013
E1300872-v1 ECR - HEPI model updates Nov 2013 Brian Lantz et al. Integration
Seismic Isolation
09 Dec 2013
E1300906-v1 HEPI script updates Nov 2013 Brian Lantz Integration
Seismic Isolation
09 Dec 2013
E1300907-v1 update to SEI watchdog data rate in the science frames Brian Lantz Seismic Isolation
Data Acquisition System
Integration
09 Dec 2013
E1200639-v1 aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System Aidan Brooks et al. System Test
System Engineering
Auxiliary Optics
Installation
Integration
Subsystem Test
22 Nov 2013
D1300227-x0 aLIGO Pcal Development Layout Craig Conley Integration
Auxiliary Optics
Installation
11 Sep 2013
E1300629-x0 aLIGO, Integration Testing, HIFO-Y Test Daniel Sigg Integration
27 Aug 2013
D1000549-v6 aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY Craig Conley et al. Installation
Auxiliary Optics
Final Design
Integration
23 Aug 2013
L1200261-v2 Executive Summary of the One Arm Test Daniel Sigg et al. Integration
16 Aug 2013
G1300719-v3 Performance of the Advanced LIGO Input Optics Chris Mueller Integration
Subsystem Test
Input Optics
Public Talk / Colloquium
Commissioning
09 Jul 2013
E1300249-v2 ECR - Change Locating Dimensions of Oplev/Pcal Receiver Installations in all End VEAs Craig Conley Change Control
Integration
Installation
Auxiliary Optics
10 May 2013
G1300437-v1 aLIGO Installed A-1 Adapter Measurements, Oplev/Pcal Receiver Side (LHO, LLO) Craig Conley Integration
Installation
Auxiliary Optics
09 Apr 2013
D1300263-v1 ALIGO, AOS, VIEWPORT LEAK TEST FIXTURE, PROOF TEST CAP ASSY. FOR [H1/L1] CO2P V.P. Eduardo Sanchez Integration
Installation
Fabrication
28 Mar 2013
G1300258-v1 Arm Length Stabilization at LHO Daniel Sigg Integration
17 Mar 2013
T1100080-v3 Commissioning Advanced LIGO's First Arm Cavity Daniel Sigg et al. System Engineering
Commissioning
Integration
17 Mar 2013
L1300018-v2 Summary of the L1 Input Mode Cleaner Testing Peter Fritschel et al. Integration
16 Feb 2013
G1201295-v2 Magnetic coupling to test mass suspensions. Peter Fritschel Subsystem Test
Integration
Suspensions
02 Jan 2013
D1201460-v1 aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations Craig Conley Integration
Installation
Auxiliary Optics
Commissioning
12 Nov 2012
D1201459-v1 aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations Craig Conley Auxiliary Optics
Installation
Commissioning
Integration
12 Nov 2012
E1200908-v1 Electronics and Optics Change Request from the One Arm Test Daniel Sigg Integration
19 Oct 2012
E1200621-x0 BOM and Formal Drawing Tree, aLIGO TCS HWS Table Assembly, HAM4 Mindy Jacobson Assembly
Integration
Fabrication
System Engineering
Auxiliary Optics
Installation
13 Jun 2012
D1200900-x0 DC Power Supply Rack VDC-YC2 David Kinzel Integration
System Engineering
Installation
12 Jun 2012
D1200898-x0 DC Power Supply Rack VDC-XC2 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200896-x0 DC Power Supply Rack VDC-C7 David Kinzel Installation
System Engineering
Integration
12 Jun 2012
D1200894-x0 DC Power Supply Rack VDC-C5 David Kinzel Integration
System Engineering
Installation
12 Jun 2012
D1200891-x0 DC Power Supply Rack VDC-C2 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200892-x0 DC Power Supply Rack VDC-C3 David Kinzel Installation
System Engineering
Integration
12 Jun 2012
D1200890-x0 DC Power Supply Rack VDC-C1 David Kinzel Installation
System Engineering
Integration
12 Jun 2012
G1200588-v1 aLIGO Integration status for 23 May 2012 meeting Peter Fritschel Integration
23 May 2012
D1101849-v1 aLIGO TCS HWS OPTICS ASSY In Vac, L1 HAM5 Aidan Brooks et al. Integration
Preliminary Design
Fabrication
System Engineering
Final Design
Auxiliary Optics
Vacuum
04 May 2012
T1000075-v2 Advanced Interferometer Configurations White Paper Rana Adhikari et al. Integration
Upgrades
Basic R&D
Sensing and Control
System Engineering
26 Apr 2012
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Preliminary Design
Computing/archiving
Conceptual Design
Integration
Observatory Facilities
Requirements
Data Acquisition System
Data and Computing
Other data analysis
System Test
Calibration
Upgrades
Basic R&D
Data quality / vetoes
Sensing and Control
Fabrication
01 Apr 2012
C1105429-v3 SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay Richard Bagley et al. Fabrication
Vacuum
Cleaning
Procurements
Integration
17 Aug 2011
D0900928-v2 D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO John Worden et al. Integration
System Engineering
Vacuum
11 Jan 2010
T980044-v1 Determination of Global and Local Coordinate Axes for the LIGO Sites Albert Lazzarini Installation
System Engineering
Vacuum
Integration
11 May 2009
D950148-v2 LVEA and VEA Foundations Relative to the Beam Tube Center Line Dennis Coyne Integration
Vacuum
System Engineering
Installation
10 May 2009

Number of documents found: 142


DCC Version 3.5.0, contact DCC Help