LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1001575-v10 |
aLIGO SEI (Seismic) Sensor (Sensors) and Actuator (Actuators) Electronics Chains |
Jeffrey Kissel |
Assembly
Seismic Isolation
Final Design
Commissioning
|
20 Feb 2024 |
G1100431-v1 |
aLIGO Active Seismic Isolation |
Jeffrey Kissel |
Commissioning
Final Design
Subsystem Test
Installation
Seismic Isolation
|
15 Sep 2023 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Calibration
Commissioning
|
23 Jun 2023 |
P1200087-v58 |
Prospects for Observing and Localizing Gravitational-Wave Transients with Advanced LIGO, Advanced Virgo and KAGRA |
LIGO Scientific Collaboration et al. |
Commissioning
Astrophysics / Multi-messenger
GW Bursts
Compact Binaries
|
01 Aug 2022 |
G1300086-v2 |
HAM6 Coordinate System Definitions |
Jeffrey Kissel |
Sensing and Control
Modelling
Seismic Isolation
System Engineering
Integration
Final Design
Commissioning
Suspensions
|
08 Mar 2015 |
T070107-v7 |
BOSEM Test Specification |
Stuart Aston et al. |
Suspensions
Commissioning
|
09 Mar 2016 |
T0900023-v2 |
(OMC) DC (DCPD) readout (Power) Normalization (Linearization) |
Sam Waldman |
Sensing and Control
Commissioning
|
25 Jun 2021 |
D1500308-v1 |
Common Mode Servo Card, 40m Revisions |
Rana Adhikari et al. |
Sensing and Control
Commissioning
|
11 Dec 2015 |
T070082-v1 |
LIGO I mirror scattering loss by microroughness |
Hiro Yamamoto |
Core Optics
Commissioning
|
06 Apr 2009 |
G1400001-v3 |
The Status of Advanced LIGO: Light at the End of the Tunnels! |
Jeffrey Kissel et al. |
Input Optics
Seismic Isolation
Laser Systems
System Engineering
Sensing and Control
Public Talk / Colloquium
State Control and Monitoring
Integration
Data Acquisition System
Commissioning
Auxiliary Optics
Suspensions
Core Optics
|
17 Aug 2016 |
T1500120-v1 |
Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades |
Jeffrey Kissel et al. |
Commissioning
Auxiliary Optics
Core Optics
Suspensions
Sensing and Control
Conceptual Design
System Engineering
Upgrades
Seismic Isolation
|
26 May 2016 |
G1401291-v3 |
aLIGO HSTS Damping Loop Design Comparison |
Jeffrey Kissel et al. |
Suspensions
Integration
Commissioning
Sensing and Control
Modelling
|
25 May 2016 |
G1401290-v1 |
aLIGO HSTS "Level 2" Damping Loop Design |
Betsy Weaver et al. |
Sensing and Control
Modelling
Seismic Isolation
Integration
Commissioning
Suspensions
|
25 May 2016 |
G1400151-x0 |
aLIGO HLTS "Level 2" Damping Loop Design |
Jeffrey Kissel |
Modelling
Sensing and Control
Commissioning
Suspensions
|
25 May 2016 |
G1600447-v3 |
FINESSE - Numerical Simulations for Optical Design and Commissioning |
Daniel Toyra et al. |
Modelling
Commissioning
|
17 May 2016 |
P1500237-v11 |
GW150914: The Advanced LIGO Detectors in the Era of First Discoveries |
LIGO Scientific Collaboration et al. |
Commissioning
|
04 Apr 2016 |
G1600276-v1 |
Automation of the ISS second loop: issues and mitigations |
Kiwamu Izumi |
Commissioning
|
15 Feb 2016 |
G1600150-v1 |
H1 Calibrated Sensitivity Spectra Oct 24 2015 (Representative for O1) |
Daniel Sigg |
Detector Characterization
Sensing and Control
Calibration
Commissioning
|
18 Jan 2016 |
G1600151-v1 |
L1 Calibrated Sensitivity Spectra Oct 24 2015 (Representative for O1) |
Daniel Sigg |
Sensing and Control
Detector Characterization
Calibration
Commissioning
|
18 Jan 2016 |
P1400074-v5 |
Self Amplified Lock of a Ultra-narrow Linewidth Optical Cavity |
Kiwamu Izumi et al. |
Commissioning
Integration
Basic R&D
Modelling
|
08 Jan 2016 |
G1501380-v1 |
Ideas for RF Glictch Identification / Mitigation |
Koji Arai |
Sensing and Control
Commissioning
|
12 Nov 2015 |
T1300690-v1 |
TwinCAT EPICS IOC Documentation |
Maggie Tse |
Commissioning
Sensing and Control
|
23 Oct 2015 |
E1101149-v19 |
HEPI Pier Components - LHO |
Eric Allwine et al. |
Seismic Isolation
Commissioning
|
21 Oct 2015 |
G1501223-v3 |
H1 Calibrated Sensitivity Spectra Oct 1 2015 (Representative for Start of O1) |
Jeffrey Kissel |
Commissioning
Calibration
Detector Characterization
Sensing and Control
|
19 Oct 2015 |
G1401213-v1 |
Update on the charging issues at aLIGO |
Borja Sorazu |
Meeting
Commissioning
Suspensions
|
29 Sep 2015 |
T1400535-v2 |
Experience with discharging the ETMY test mass at LHO in August 2014 |
Gerardo Moreno et al. |
Vacuum
Commissioning
Suspensions
|
29 Sep 2015 |
T1400182-v1 |
Simulations of effects of LLO mode-mismatches on PRFPMI error signals |
Charlotte Bond et al. |
Commissioning
|
28 Sep 2015 |
G1500823-v4 |
H1 Calibrated Sensitivity Spectra Jun 9 2015 (Best for ER7) |
Jeffrey Kissel |
Calibration
Commissioning
Detector Characterization
Sensing and Control
|
09 Jul 2015 |
G1500711-v1 |
Status of LIGO |
Daniel Sigg |
Commissioning
|
17 Jun 2015 |
G1500645-v3 |
Sensing and control problems in low finesse cavities, or "how (not) to hop" |
Paul Fulda et al. |
Sensing and Control
Commissioning
|
02 Jun 2015 |
G1500668-v1 |
Squeezing now and in the future: the road to 10 dB |
Katherine Dooley et al. |
Integration
Commissioning
Squeezer
Sensing and Control
Meeting
Basic R&D
Requirements
|
01 Jun 2015 |
G1500694-x0 |
Keeping a good lock |
Keita Kawabe |
Commissioning
Integration
Meeting
|
20 May 2015 |
T1300552-v3 |
OMC DCPD characterization for aLIGO transition |
William Korth et al. |
Commissioning
Sensing and Control
|
16 May 2015 |
G1500643-v1 |
Lessons learned from commissioning of Advanced Detectors |
Daniel Sigg |
Commissioning
|
16 May 2015 |
G1500414-v4 |
aLIGO commissioning update |
Lisa Barsotti |
Commissioning
|
16 Apr 2015 |
G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
Installation
Assembly
Requirements
Integration
Commissioning
Suspensions
Subsystem Test
System Test
|
08 Mar 2015 |
L1300207-v1 |
aLIGO OMC installation/commissioning notes |
William Korth |
Commissioning
Installation
Sensing and Control
|
06 Mar 2015 |
D1300606-v2 |
ALS Faraday Isolator Fixed Base |
Bram Slagmolen et al. |
Commissioning
Sensing and Control
|
05 Mar 2015 |
D1300611-v1 |
ALS Faraday Isolator Adjustable Spacer |
Bram Slagmolen |
Sensing and Control
Commissioning
|
05 Mar 2015 |
D1300610-v1 |
ALS Faraday Isolator Adjustable Base |
Bram Slagmolen |
Commissioning
Sensing and Control
|
05 Mar 2015 |
T1200429-v1 |
Arm Length Stabilisation - FIBRE Phase-Locked-Loop |
Bram Slagmolen et al. |
Commissioning
Sensing and Control
|
04 Mar 2015 |
E1100822-v33 |
aLIGO BSC-ISI, Cables inventory and Installation Location |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
26 Feb 2015 |
D1500062-v1 |
CARM handoff signal diagram |
Eleanor King |
Sensing and Control
Commissioning
|
11 Feb 2015 |
P1400234-v3 |
In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances |
Chris Mueller et al. |
Commissioning
Sensing and Control
|
09 Feb 2015 |
D1300777-v1 |
aLIGO Pcal Tooling, Viewport Beam Target Assembly |
Craig Conley |
Auxiliary Optics
Commissioning
Installation
|
05 Feb 2015 |
G1400710-v1 |
L1 TransMonEY Telescope Focal Tuning Results |
Adam Mullavey et al. |
Commissioning
Auxiliary Optics
|
21 Jan 2015 |
G1401271-v1 |
Optical lever Laser Diode Laser glitches and repairs |
Suresh Doravari |
Commissioning
Suspensions
|
07 Jan 2015 |
E1400218-v2 |
HTTS Test Reports |
Bram Slagmolen |
Sensing and Control
Commissioning
|
27 Nov 2014 |
E1000496-x0 |
aLIGO SUS BSFM Testing and Commissioning Documentation |
Derek Bridges et al. |
Suspensions
Commissioning
Subsystem Test
Assembly
|
25 Nov 2014 |
G1401257-v1 |
Initial alignment at LHO: status and plans |
Kiwamu Izumi et al. |
Commissioning
|
28 Oct 2014 |
G1401253-v1 |
LHO Interferometer locking status (Commissioning F2F meeting) |
Alexa N Staley et al. |
Commissioning
|
28 Oct 2014 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Basic R&D
Modelling
Seismic Isolation
Installation
Meeting
Commissioning
Integration
Suspensions
|
21 Oct 2014 |
G1401248-v1 |
Photos From Oct 2014 SEI & SUS Commissioning Workshop @ VIRGO |
Jeffrey Kissel et al. |
Vacuum
Seismic Isolation
Commissioning
Suspensions
|
21 Oct 2014 |
E1400312-x0 |
Electronics and Optics Change Request from the HIFO-XY Test |
Daniel Sigg |
Commissioning
|
19 Oct 2014 |
T1300359-v1 |
How to Handle Small Optics |
Daniel Sigg |
Commissioning
|
14 Oct 2014 |
T1400633-x0 |
Designing a frequency offset locking loop for 40m prototype Arm Length Stabilization System |
Akhil Reddy et al. |
Sensing and Control
Commissioning
|
29 Sep 2014 |
T1400585-v1 |
Matrix calculations for the angular control of H1 OMC |
Koji Arai et al. |
Sensing and Control
Commissioning
|
04 Sep 2014 |
G1401078-v1 |
Advanced LIGO Commissioning Overview |
Peter Fritschel |
Commissioning
|
27 Aug 2014 |
G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
Subsystem Test
System Test
Integration
Commissioning
Suspensions
Requirements
Installation
Assembly
|
22 Aug 2014 |
T1300155-v2 |
Alignment sensing control signals of DRMI |
Keiko Kokeyama et al. |
Squeezer
Commissioning
|
15 Aug 2014 |
T010061-x0 |
ISC Electrooptic Shutter: Angle and Temperature Tolerance |
Jameson Graef Rollins et al. |
Commissioning
Sensing and Control
|
14 Aug 2014 |
P1400148-v1 |
Techniques for Resonant Optical Interferometry with Applications to the Advanced LIGO Gravitaional Wave Detectors. |
Chris Mueller |
State Control and Monitoring
Commissioning
Final Design
Laser Systems
Input Optics
Sensing and Control
|
04 Aug 2014 |
G1400785-v1 |
Notes on DRMI locking at LLO |
Kiwamu Izumi |
Commissioning
|
31 Jul 2014 |
D1300608-v1 |
ALS Mad-City Labs Spacer |
Bram Slagmolen |
Commissioning
Sensing and Control
|
08 Jul 2014 |
D1300607-v1 |
ALS Mad-City Labs Base |
John Miller et al. |
Sensing and Control
Commissioning
|
08 Jul 2014 |
E1300803-x0 |
Changes Resulting from the L1 DRMI Testing |
Peter Fritschel et al. |
Integration
Commissioning
|
20 Jun 2014 |
E1400300-x0 |
Changes Resulting from Input Mode Cleaner Testing |
Dennis Coyne |
Commissioning
Integration
|
19 Jun 2014 |
E1201027-v1 |
ECR: Replacement of the coil-series resistors in the HAM-A coil drivers |
David Feldbaum |
Input Optics
Upgrades
Requirements
Sensing and Control
Final Design
Commissioning
Suspensions
|
19 Jun 2014 |
G1301192-v3 |
Simulink/Front Model & MEDM Screen Mods from ECR E1300578 |
Jeffrey Kissel |
Sensing and Control
Commissioning
Suspensions
|
19 Jun 2014 |
G1300138-v1 |
Noise Budget Infrastructure |
Christopher Wipf |
Commissioning
|
19 Jun 2014 |
G1301269-v1 |
DRMI Noise Budget |
Denis Martynov |
Commissioning
|
19 Jun 2014 |
G1400651-v1 |
DRFPMI NB snapshot |
Christopher Wipf |
Commissioning
|
19 Jun 2014 |
E1200044-x0 |
aLIGO BSC-HEPI, LHO BSC6: Phase I Testing Report |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
18 Jun 2014 |
E1200043-x0 |
aLIGO BSC-HEPI, LHO BSC8: Phase I Testing Report |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
18 Jun 2014 |
E1100740-v7 |
aLIGO BSC-ISI, Seismometers Installation Location |
Vincent Lhuillier |
Commissioning
Seismic Isolation
|
18 Jun 2014 |
E1100741-v1 |
aLIGO BSC-ISI, Actuators Installation Location |
Vincent Lhuillier |
Commissioning
Seismic Isolation
|
18 Jun 2014 |
T1300126-v1 |
IMC Autolocker |
Adam Mullavey et al. |
Sensing and Control
Commissioning
|
18 Jun 2014 |
E1300495-v3 |
LLO DRMI In-air Check List |
Valery Frolov |
Commissioning
Integration
|
18 Jun 2014 |
T1400011-v1 |
Integration Testing: Systems meeting discussion, 15 Jan 2014 |
Peter Fritschel |
Commissioning
Integration
|
18 Jun 2014 |
T1300991-v1 |
PRMI Locking Procedure |
Ryan DeRosa et al. |
Integration
Commissioning
|
18 Jun 2014 |
T1300174-v2 |
Commissioning Advanced LIGO’s HIFO-Y |
Daniel Sigg et al. |
System Engineering
Commissioning
Integration
|
18 Jun 2014 |
D1400191-x0 |
FI2 635S Micro Laser Fermion II |
Michael Vargas |
Subsystem Test
Commissioning
|
18 Jun 2014 |
E1400002-v1 |
ECR - Acquisition of FSS RFPD DC signal |
Kiwamu Izumi |
Integration
Commissioning
|
16 Jun 2014 |
T1400368-v1 |
Advanced LIGO Operations Commissioning Plan |
Peter Fritschel et al. |
Commissioning
|
11 Jun 2014 |
P1300001-v1 |
[Thesis] Multi-Color Interferometry for Lock Acquisition of Laser Interferometric Gravitational-wave Detectors |
Kiwamu Izumi et al. |
Commissioning
Thesis/Dissertation
|
10 Jun 2014 |
G1400529-v2 |
Commissioning of Advanced LIGO |
Kiwamu Izumi |
Integration
Commissioning
|
25 May 2014 |
T1400298-v1 |
Simulation study for aLIGO lock acquisition |
Kiwamu Izumi et al. |
Integration
Commissioning
Meeting
Modelling
|
03 May 2014 |
D1002969-v9 |
Broadband Photodetector (BBPD) Schematic |
Matthew Evans |
Sensing and Control
Commissioning
Preliminary Design
|
01 Apr 2014 |
G1400137-v1 |
ISI tuning vs interferometer states and seismic input |
Lisa Barsotti |
Commissioning
|
25 Feb 2014 |
T1400047-v1 |
Power Recycling Probe Experiment Proposal |
Chris Mueller |
Sensing and Control
Commissioning
|
06 Feb 2014 |
E1300966-v1 |
aLIGO IO H1 EOM in-situ characterization |
Kiwamu Izumi et al. |
Commissioning
|
20 Jan 2014 |
T1300629-x0 |
SEI Guardians |
Brian Lantz |
State Control and Monitoring
Commissioning
Seismic Isolation
|
20 Jan 2014 |
T1300435-v1 |
Suspension Module Guardian Design |
Jeffrey Kissel et al. |
Suspensions
Preliminary Design
Commissioning
State Control and Monitoring
|
20 Jan 2014 |
T1200307-v4 |
Early aLIGO Configurations: example scenarios toward design sensitivity |
Lisa Barsotti et al. |
Commissioning
|
15 Jan 2014 |
T1300954-v2 |
Investigation of beam clipping in the Power Recycling Cavity of Advanced LIGO using FINESSE |
Charlotte Bond et al. |
Core Optics
Commissioning
|
16 Dec 2013 |
T1200437-v3 |
Advanced LIGO Interferometer Integration |
Peter Fritschel et al. |
Integration
Commissioning
|
11 Dec 2013 |
G1200632-v3 |
Towards Applied Heirarchical Control |
Jeffrey Kissel |
Suspensions
Preliminary Design
Commissioning
Seismic Isolation
Sensing and Control
|
11 Dec 2013 |
G1300530-v2 |
The aLIGO Guardian |
Jeffrey Kissel |
State Control and Monitoring
Commissioning
Preliminary Design
|
11 Dec 2013 |
G1300561-v1 |
aLIGO BSFM "Level 2" Damping Loop Design |
Jeffrey Kissel |
Suspensions
Commissioning
|
11 Dec 2013 |
G1300537-v3 |
aLIGO QUAD "Level 2" Damping Loop Design |
Jeffrey Kissel |
Commissioning
Suspensions
|
11 Dec 2013 |
D1300778-v2 |
aLIGO Pcal Tooling, Viewport Beam Target |
Craig Conley |
Auxiliary Optics
Commissioning
Installation
|
07 Dec 2013 |
G1300909-v1 |
Mode matching investigations at LLO |
Lisa Barsotti et al. |
Sensing and Control
Commissioning
|
06 Sep 2013 |
E1300656-v1 |
Electronics and Optics Change Request from the HIFO-Y Test |
Daniel Sigg |
Commissioning
|
03 Sep 2013 |
G1300830-v1 |
sustools.py, a Python module for SUS |
Mark Barton |
Suspensions
Commissioning
|
12 Aug 2013 |
G1300524-v1 |
The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition |
Adam Mullavey et al. |
Sensing and Control
Commissioning
|
09 Jul 2013 |
G1300719-v3 |
Performance of the Advanced LIGO Input Optics |
Chris Mueller |
Input Optics
Public Talk / Colloquium
Subsystem Test
Integration
Commissioning
|
09 Jul 2013 |
E1300578-v1 |
ECR: Topology Changes to SUS models as a result of ISC Informed Interaction |
Jeffrey Kissel |
Suspensions
Commissioning
Change Control
|
02 Jul 2013 |
T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
System Test
Commissioning
|
18 Jun 2013 |
G1300624-v1 |
Identifying and mitigating scattered light noise in LIGO - GEO scattering workshop |
Robert Schofield |
Commissioning
|
10 Jun 2013 |
D1300513-v1 |
HIFO-Y(Half Interferomter Y) expected power budget for initial alignment |
Kiwamu Izumi |
Commissioning
|
06 Jun 2013 |
G1300576-x0 |
Building up a commissioning network |
Lisa Barsotti |
Commissioning
|
20 May 2013 |
G1300554-v1 |
First Lessons from the Advanced LIGO Integration Testing |
Daniel Sigg |
Commissioning
|
16 May 2013 |
G1300533-v1 |
Status update of aLIGO lock acquisition simulation (20130503) |
Kiwamu Izumi |
Commissioning
|
03 May 2013 |
G1300119-v2 |
Friendly Power Shutdown for LLO Corner Buildings |
David Kinzel |
Laser Systems
Vacuum
Observatory Facilities
Seismic Isolation
System Engineering
Input Optics
Sensing and Control
Policies
Data and Computing
Core Optics
Suspensions
Auxiliary Optics
Commissioning
Data Acquisition System
|
11 Apr 2013 |
G1300434-v1 |
Update from the AEI 10m Prototype |
Tobin Fricke |
Public Talk / Colloquium
Installation
Commissioning
|
07 Apr 2013 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
Core Optics
Suspensions
Auxiliary Optics
Commissioning
System Test
Subsystem Test
Fabrication
System Engineering
Basic R&D
|
25 Mar 2013 |
T1300158-v2 |
Arm cavity geometry for H1 ALS test with X and Y arm |
Keita Kawabe |
Sensing and Control
Commissioning
Core Optics
|
18 Mar 2013 |
T1100080-v3 |
Commissioning Advanced LIGO's First Arm Cavity |
Daniel Sigg et al. |
System Engineering
Commissioning
Integration
|
17 Mar 2013 |
G1300050-v3 |
Output Mode Cleaners |
Keita Kawabe et al. |
Commissioning
|
28 Jan 2013 |
G1201266-v1 |
Smoke, Mirrors, Big Bangs And Big Scientific Payoffs: An outline for using an interferometer network to conduct astronomy. |
Cristina Torres et al. |
Commissioning
Public Talk / Colloquium
Detector
Basic R&D
Data Analysis
Education, Outreach
|
13 Dec 2012 |
T1200450-v2 |
Cavity alignment fluctuations in the H2 One Arm Test |
Lisa Barsotti |
Commissioning
|
03 Dec 2012 |
G1200753-v1 |
aLIGO H2 One Arm Test Update |
Keita Kawabe et al. |
Detector
Commissioning
|
03 Dec 2012 |
G1201211-v1 |
Flow diagrams for HEPI actuators, bleed and operate mode |
Brian Lantz et al. |
Commissioning
Seismic Isolation
Assembly
|
26 Nov 2012 |
D1201460-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations |
Craig Conley |
Commissioning
Auxiliary Optics
Integration
Installation
|
12 Nov 2012 |
D1201459-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations |
Craig Conley |
Integration
Auxiliary Optics
Commissioning
Installation
|
12 Nov 2012 |
G1201058-v1 |
Cavity Error Calibration Notes for a Damped Triple Pendulum |
LVC |
Basic R&D
Commissioning
|
02 Oct 2012 |
T1200424-v1 |
Setting up the Physical Environment Monitoring System for Advanced LIGO |
Maggie Tse |
Commissioning
|
29 Aug 2012 |
T1200285-v1 |
Description of the Sensor Correction FIR & IIR Filter Components |
Brian Lantz |
Seismic Isolation
Commissioning
|
06 Jun 2012 |
T1200200-v1 |
H2 One Arm Test Beam Geometry |
Keita Kawabe et al. |
Commissioning
|
07 May 2012 |
T080144-v1 |
The Enhanced LIGO Output Mode Cleaners |
Sam Waldman |
Commissioning
Sensing and Control
|
24 Apr 2012 |
T1200172-v2 |
Installation and testing of L1 PSL table legs |
Riccardo DeSalvo et al. |
Laser Systems
Commissioning
|
15 Apr 2012 |
E080228-v1 |
L1 HAM6 ISI Mass Layout (As-Leveled) |
Michael Meyer |
Seismic Isolation
Commissioning
|
01 Apr 2012 |
T0900285-v2 |
L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) |
Jeffrey Kissel |
Commissioning
Final Design
Requirements
Seismic Isolation
|
12 Mar 2012 |
P1200020-x0 |
Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform |
Jeffrey Kissel et al. |
Seismic Isolation
Requirements
Final Design
Commissioning
Subsystem Test
|
27 Feb 2012 |
T0900508-v1 |
LLO OMC Mode Matching |
Katherine Dooley |
Modelling
Conceptual Design
Auxiliary Optics
Commissioning
|
23 Feb 2012 |
G1101190-v1 |
CDS Meeting: Daily News |
Rana Adhikari et al. |
Commissioning
Data Acquisition System
|
27 Oct 2011 |
G1101178-v1 |
Research activities at the Caltech 40m prototype |
Koji Arai |
Basic R&D
Sensing and Control
System Test
Commissioning
|
24 Oct 2011 |
T1100443-v1 |
H1 HAM6 vent plan for cleaning eLIGO OMC |
Keita Kawabe |
Commissioning
|
15 Aug 2011 |
G050111-v1 |
Summary of recent measurements of g factor changes induced by thermal loading in the H1 interferometer |
Joseph Betzwieser et al. |
Auxiliary Optics
Commissioning
Core Optics
Cleaning
|
07 Jun 2011 |
T050074-x0 |
Optical Absorption in Initial LIGO Interferometers |
Stefan Ballmer et al. |
Cleaning
Auxiliary Optics
Commissioning
Core Optics
|
05 Jun 2011 |
T1100246-v1 |
iLIGO L1, H1 and H2 Interferometer Resonances |
Dennis Coyne |
Auxiliary Optics
Commissioning
Suspensions
Core Optics
Input Optics
System Engineering
Seismic Isolation
|
04 May 2011 |
T1000242-v2 |
Hierarchical Control Theory for Advanced LIGO |
Brett Shapiro |
Commissioning
|
08 Mar 2011 |
E1000500-x0 |
aLIGO SUS Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Commissioning
Suspensions
Subsystem Test
|
28 Feb 2011 |
G080405-v1 |
Introduction to DC Readout |
Tobin Fricke |
Sensing and Control
Commissioning
|
14 Dec 2010 |
E1000510-x0 |
aLIGO SUS BSC Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Subsystem Test
Commissioning
Final Design
Suspensions
Assembly
|
04 Oct 2010 |
E1000511-x0 |
aLIGO SUS HAM Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Commissioning
Suspensions
Subsystem Test
Assembly
|
04 Oct 2010 |
T0900520-v4 |
Documenting Electronics using the DCC and the E-traveler |
Rich Abbott |
Commissioning
|
01 Oct 2010 |
G1000546-v1 |
Simulated Plant Approach |
Peter Michael Kalmus et al. |
Commissioning
Basic R&D
Modelling
Sensing and Control
|
15 Jul 2010 |
E1000002-v1 |
Certification for Viton for L1 HAM6 OMC damping struts |
Robert Taylor et al. |
Commissioning
Suspensions
Installation
Incoming Inspection
Seismic Isolation
|
11 Jan 2010 |
T0900518-v2 |
Quad Electronic and Optical Alignment Procedure |
Brett Shapiro |
Commissioning
|
15 Dec 2009 |
P0900119-v2 |
Commissioning of the tuned DC readout at GEO600 |
Hartmut Grote et al. |
Commissioning
|
29 Oct 2009 |
G0900349-v4 |
The Present and Near Future of LIGO |
Jeffrey Kissel |
Meeting
Installation
Upgrades
Basic R&D
Final Design
Commissioning
|
15 Jul 2009 |
G0900508-v1 |
The Status of GEO600 |
Hartmut Grote et al. |
Commissioning
|
01 Jul 2009 |
F080008-v8 |
Advanced LIGO Inventory Database PO/Line Parts Import Template |
Dwayne Giardina et al. |
Installation
Procurements
Commissioning
Quality Assurance
Operations Business
|
10 Jun 2009 |
G0900202-x0 |
Enhanced LIGO Commissioning Update |
Keita Kawabe |
Commissioning
|
17 Mar 2009 |
G0900141-v3 |
Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs |
Jeffrey Kissel |
Requirements
Seismic Isolation
Upgrades
Modelling
Commissioning
Final Design
|
13 Apr 2009 |
G080621-v1 |
The Status of Enhanced LIGO |
Aidan Brooks |
Seismic Isolation
Commissioning
|
02 Apr 2009 |
T0900113-v1 |
Recent Investigations/Modifications on the ISS |
Hartmut Grote |
Laser Systems
Commissioning
|
17 Mar 2009 |
G0900197-v1 |
Mitigation of environmental coupling for eLIGO |
Robert Schofield |
Commissioning
|
16 Mar 2009 |
G0900137-v1 |
Optimisation of the ISS |
Hartmut Grote |
Commissioning
Laser Systems
|
16 Mar 2009 |
E0900075-v1 |
Response to HAM-ISI Watchdog Committee Recommendations |
Jeffrey Kissel et al. |
Commissioning
Seismic Isolation
|
09 Mar 2009 |
T0810007-v2 |
Effect of ITM thermal lens in beam reflection |
Hiro Yamamoto |
Commissioning
Auxiliary Optics
|
27 Jan 2009 |