Document List by Author

Adam Mullavey of LIGO - Livingston Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
D1800270-v2 H1 ALS X-End Station Optical Table Layout (ISCTEX) - LHO actual installation Aidan Brooks et al. Auxiliary Optics
04 Apr 2024
D1800271-v3 L1 ALS X-End Station Optical Table Layout (ISCTEX) - LLO actual installation Aidan Brooks et al. Auxiliary Optics
04 Apr 2024
E2000162-v1 Review Report Final ISC Design for the A+ Filter Cavity Daniel Sigg et al. Squeezer
30 Mar 2020
D1201103-v16 ISCT1 Optical Layout Adam Mullavey et al. Sensing and Control
Installation
19 Jan 2015
E1900373-v1 Review Report Preliminary ISC Design for the A+ Filter Cavity Daniel Sigg et al. Sensing and Control
09 Jan 2020
E1900223-v1 Review Report Design Requirements and Concept for the A+ ISC Filter Cavity and Relay Optics Daniel Sigg et al. A+
Sensing and Control
15 Nov 2019
D1201448-v9 ISCTEX Optical Layout Bram Slagmolen et al. Sensing and Control
Installation
16 Mar 2015
T0900144-v7 Adv. LIGO Arm Length Stabilization Design Sam Waldman et al. Sensing and Control
Final Design
08 Nov 2018
T1000042-v2 aLIGO ISC Beam Steering - Tip-Tilt Mirror Design Bram Slagmolen et al. Sensing and Control
Final Design
11 Aug 2014
T1700343-v1 Non-Linear Angular Noise Coupling into Differential Arm Length Brian Seymour et al. Sensing and Control
19 Feb 2018
P1600285-v21 Validating gravitational-wave detections: The Advanced LIGO hardware injection system Christopher Biwer et al. Detector
20 Feb 2017
T1400349-v13 Documentation of the Advanced LIGO Hardware Injection Infrastructure Eric Thrane et al. Data analysis software
Data quality / vetoes
Compact Binaries
Continuous Wave
Computing/archiving
Stochastic
GW Bursts
26 Oct 2016
E1500291-x0 aLIGO, INJ Eric Thrane et al. Calibration
Compact Binaries
Continuous Wave
Detector Characterization
Stochastic
GW Bursts
27 Jul 2016
E1500272-v2 ECR: Move HAM6 BDV2 and corresponding V-beam dump to the upstream of QPD sled and beam splitter. Keita Kawabe et al. System Engineering
Sensing and Control
Installation
25 Jun 2015
T1200471-v7 PSL and ALS Mode Matching Solution on ISCT1 for the Half Interferometer (HIFO) Test - OBSOLETE Alberto Stochino et al. Basic R&D
25 Mar 2015
T1500012-v1 L1 OMC Controls Adam Mullavey et al. Sensing and Control
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Basic R&D
Integration
05 Mar 2015
G1400710-v1 L1 TransMonEY Telescope Focal Tuning Results Adam Mullavey et al. Commissioning
Auxiliary Optics
21 Jan 2015
T1400429-v1 As Built TransMon EY Telescope and Table (L1) Adam Mullavey et al. Sensing and Control
Installation
21 Jan 2015
G1400530-v1 L1 TransMon GREEN QPD sleds tuning (both EX and EY) Adam Mullavey et al. Sensing and Control
Installation
21 Jan 2015
T1100603-v2 TMS Telescope Alignment Procedure Keita Kawabe et al. Installation
Final Design
Auxiliary Optics
17 Nov 2014
D1400372-v1 Simple diagram of ALS optical layout Adam Mullavey et al. Sensing and Control
04 Nov 2014
P1100090-v5 Tip-Tilt Mirror Suspension: Beam Steering for the Advanced LIGO Sensing and Control Signals Bram Slagmolen et al. Sensing and Control
Basic R&D
11 Aug 2014
T1300126-v1 IMC Autolocker Adam Mullavey et al. Commissioning
Sensing and Control
18 Jun 2014
G1300524-v1 The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition Adam Mullavey et al. Commissioning
Sensing and Control
09 Jul 2013
T1300499-v1 ALS mode matching solutions Kiwamu Izumi et al. Sensing and Control
29 May 2013
T0900096-v1 Tip-Tilt Mirror Specifications and Design Bram Slagmolen et al. Sensing and Control
Basic R&D
24 Apr 2012
G0900577-v3 Arm Length Stabilization for Advanced Gravitational Wave Detectors Daniel Shaddock et al. Sensing and Control
Conceptual Design
11 Oct 2009
E080345-x0 Process Traveler - Tip Tilt Steel Parts Adam Mullavey Document Migration
22 Nov 2008
E080383-x0 Process Traveler - Tip Tilt Neo35 Magnets Adam Mullavey Document Migration
22 Nov 2008
E080495-x0 Process Traveler - LLO OMC Tip Tilts Adam Mullavey Document Migration
22 Nov 2008
E080414-x0 Process Traveler - Nickel Plated Screws Adam Mullavey Document Migration
22 Nov 2008
E080346-x0 Process Traveler - Tip Tilt Aluminium Parts Adam Mullavey Document Migration
22 Nov 2008
E080474-x0 Process Traveler - LLO TT replacement parts Adam Mullavey Document Migration
22 Nov 2008
T080139-x0 Adv. LIGO Arm Cavity Pre-Lock Acquisition System Yoichi Aso et al. Document Migration
23 Oct 2008
G080551-x0 Adv. LIGO Arm Length Stabilisation - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam Rana Adhikari et al. Document Migration
01 Oct 2008
E080098-x0 Process Traveler - Tip Tilt Suspension Bars Adam Mullavey Document Migration
12 May 2008
E080082-x0 Process Traveler - TOSEM Backplate Adam Mullavey Document Migration
12 May 2008
E080077-x0 Process Traveler - Socket Cap Screws Adam Mullavey Document Migration
25 Apr 2008

Number of documents found: 39


DCC Version 3.4.2, contact Document Database Administrators