Document List by Topic

These documents on Upgrades (subtopic of Activity) are available:
(List events on Upgrades)

LIGO-Number Title Author(s) Topic(s) Last Updated
M1500263-v1 Guidelines for Advanced LIGO Detector Upgrade Development Review Dennis Coyne Final Design
Fabrication
Upgrades
Conceptual Design
Requirements
Preliminary Design
System Engineering
Policies
05 Oct 2016
T2200287-v3 Report of the LSC Post-O5 Study Group Peter Fritschel et al. A#
Reports
Upgrades
07 May 2024
T2300041-v1 A♯ Strain Sensitivity Kevin Kuns et al. Upgrades
Conceptual Design
27 Jan 2023
D2200215-v1 OMC DCPD Whitening Filter Chassis Assembly (2x Channel, 1x OMC Version) Dean Schaetzl Sensing and Control
Upgrades
20 Jan 2023
M2100169-v2 Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 Sheila Rowan et al. Basic R&D
Upgrades
A+
Core Optics
Technical Review Board
Memorandum
04 Aug 2022
M2100135-v3 LIGO A+ and Virgo AdV+ selection process for O5 Test Mass Coating Michael Zucker et al. Core Optics
Technical Review Board
Memorandum
Basic R&D
Upgrades
A+
04 Aug 2022
M2100225-v1 Record of Agreement: O5 coating selection for LIGO A+ and Virgo AdV+ Michael Zucker et al. Basic R&D
A+
Collaboration
Upgrades
Core Optics
Advisory Boards (e.g., PAC, PAP, ...)
Technical Review Board
Memorandum
04 Aug 2022
G2101278-v1 Mariner: LIGO Voyager Prototype at the Caltech 40 m Lab (GWADW June-2021) Christopher Wipf et al. Basic R&D
Upgrades
15 Sep 2021
T1100068-v23 Photon Calibrator Preliminary/Final Design Document Jonathan Berliner et al. Calibration
Basic R&D
Upgrades
Detector Characterization
Assembly
Laser Systems
Requirements
Auxiliary Optics
Conceptual Design
Preliminary Design
06 Jul 2021
T2000407-v3 Instrument Science White Paper 2020 Peter Fritschel et al. Basic R&D
Upgrades
Integration
Detector
31 Aug 2020
T1900391-v1 Measuring mechanical loss in cryogenic gentle nodal suspension resonator Anna Roche et al. Upgrades
Basic R&D
Suspensions
Core Optics
03 Dec 2019
G0900436-v1 eLIGO: So how's it turning out? Michael Zucker et al. Installation
Commissioning
Detector
Integration
Meeting
System Test
Upgrades
30 Jul 2019
G0900460-v1 Near Term Upgrades after Advanced LIGO Rana Adhikari Upgrades
Core Optics
Sensing and Control
Observatory Facilities
30 Jul 2019
G1900970-v1 Cosmic Explorer status and update (for Dawn V) Evan Hall Upgrades
09 Jul 2019
G1900137-v2 LIGO Vacuum System Design, Construction, Features and Faults Michael Zucker et al. Vacuum
NSF
Upgrades
30 Apr 2019
G1900136-v2 Vacuum Requirements for Future Gravitational Wave Interferometers Michael Zucker et al. Vacuum
NSF
Upgrades
30 Apr 2019
G1900803-v1 Visualizing BNS and BBH detections for 2G and 3G detectors Evan Hall et al. Upgrades
Public Talk / Colloquium
Compact Binaries
Astrophysics / Multi-messenger
Conceptual Design
17 Apr 2019
P1900072-v1 Proceedings: NSF Workshop on Large Ultrahigh-Vacuum Systems for Frontier Scientific Research Fred Dylla et al. Basic R&D
Proposals
NSF
Collaboration
Upgrades
Advisory Boards (e.g., PAC, PAP, ...)
Vacuum
20 Mar 2019
P1000103-v1 [Thesis] Calibrating and Improving the Sensitivity of the LIGO Detectors Jeffrey Kissel Commissioning
Seismic Isolation
Calibration
Upgrades
Final Design
Modelling
16 Mar 2019
G1800953-v1 [GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network Jeffrey Kissel Upgrades
External Collaboration
Basic R&D
Calibration
Sensing and Control
Modelling
Integration
Observatory Facilities
Astrophysics / Multi-messenger
System Engineering
Preliminary Design
GW source predictions
12 Mar 2019
P1800304-v1 Metrics for next-generation gravitational-wave detectors Evan Hall et al. Conceptual Design
Observatory Facilities
GW Bursts
Compact Binaries
Basic R&D
Upgrades
05 Oct 2018
T1800084-v6 Horizon plots and noise curves for second- and third-generation detectors Evan Hall GW source predictions
Astrophysics / Multi-messenger
Compact Binaries
Modelling
Upgrades
Basic R&D
21 Jan 2019
G1801629-v2 Poster on Optic Cooling Cryo System Prototype Summer Project at Stanford Jaimi Salone et al. Basic R&D
Upgrades
Public Talk / Colloquium
Preliminary Design
31 Aug 2018
G1801680-v1 Can you get there from here? David McClelland et al. Proposals
A+
Upgrades
31 Aug 2018
G1801597-v1 Gravitational-wave Detectors: The US Landscape 2020–2030 and Beyond (A Personal Perspective) David Reitze Detector
Upgrades
Public Talk / Colloquium
30 Aug 2018
G1801657-v1 Towards 3G - an Australian update David McClelland Upgrades
29 Aug 2018
T1300756-v2 Status of UF Ring Heater Prototype development and testing Giacomo Ciani et al. Basic R&D
Upgrades
Auxiliary Optics
28 Jun 2018
L1800095-v1 TRB Report on the Stray Light Control Shroud for the Output Faraday Isolator (OFI) Dennis Coyne et al. Upgrades
Reviews
Auxiliary Optics
Reports
System Engineering
12 Jun 2018
E1800089-v7 Specification : 40m dichroic RC folding mirrors Gautam Venugopalan et al. Core Optics
Upgrades
21 May 2018
E1700425-v1 ECR to change OFI REFL Baffle to beam dump Janeen Romie et al. System Engineering
Upgrades
04 May 2018
E1700072-v6 Timeline for the aLIGO squeezing upgrade at LLO Lisa Barsotti et al. Upgrades
26 Sep 2017
G1701274-v1 Selected technical challenges for Cosmic Explorer Evan Hall Modelling
Upgrades
Basic R&D
Conceptual Design
06 Jul 2017
G1701266-v2 Squeezing highlights Lisa Barsotti Upgrades
06 Jul 2017
G1701205-v2 Welcome to the Third Dawn Workshop Albert Lazzarini Upgrades
Public relations
Organizational Relations
06 Jul 2017
E1700016-v9 Specification : 40m dichroic RC folding mirrors Gautam Venugopalan et al. Basic R&D
Upgrades
28 Jun 2017
G1700809-v1 What Does Low Frequency Control Look Like in the 2G+ and 3G Era? Jeffrey Kissel State Control and Monitoring
Sensing and Control
Suspensions
Integration
Upgrades
Basic R&D
Squeezer
Seismic Isolation
Conceptual Design
System Engineering
12 Jun 2017
G1700848-v1 LIGO Voyager Update Christopher Wipf Upgrades
Basic R&D
Detector
08 May 2017
G1700835-x0 Possible KAGRA Upgrades Yuta Michimura et al. Conceptual Design
Upgrades
07 May 2017
T1600055-v7 Real-Time Code Generator (RCG) Version 3.0 Release Notes Rolf Bork et al. Upgrades
Data Acquisition System
09 Nov 2016
T1400570-v7 RCG Version 2.9 Release Notes Rolf Bork et al. Upgrades
Data Acquisition System
09 Nov 2016
T1600290-v10 Modeling Loss and Thermal Noise in Silicon Gravitational Wave Detector Suspensions Nikhil Mathur et al. Conceptual Design
Suspensions
Modelling
Upgrades
04 Nov 2016
G1601479-v1 DAWN Workshop - Introduction to the Session B Panel on coordinated R&D Giovanni Losurdo Detector
Upgrades
08 Jul 2016
G1601483-v1 Contribution to the Session B Panel on coordinated R&D Pedro Marronetti Upgrades
NSF
08 Jul 2016
G1600769-v5 Projected sensitivities towards aLIGO+ Lisa Barsotti et al. Upgrades
07 Jul 2016
G1601461-v3 LIGO Voyager: a 3G interferometer in a 1G facility Rana Adhikari et al. Upgrades
07 Jul 2016
T1500120-v1 Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades Jeffrey Kissel et al. Suspensions
Sensing and Control
Core Optics
Upgrades
Seismic Isolation
Auxiliary Optics
Conceptual Design
Commissioning
System Engineering
26 May 2016
L1400164-v2 Initial, Enhanced, and Advanced LIGO brief chronology David Shoemaker Upgrades
Detector
31 May 2015
G1600194-v1 LIGO Roadmap Musing For Joint ET/LIGO future Meeting, February 2016 David Shoemaker Detector
Upgrades
Meeting
02 Feb 2016
D1500263-v1 LLO Staging Building Bathroom Upgrade Floorplans Timothy Nelson Upgrades
Observatory Facilities
10 Sep 2015
T1200221-v5 aLIGO PEM System Upgrade Robert Schofield et al. Upgrades
18 Aug 2015
G1500726-v1 Advanced Virgo short term upgrades Matteo Barsuglia et al. Detector
Upgrades
02 Jun 2015
G1500712-v1 Topologies and squeezing workshop summary Hartmut Grote et al. Basic R&D
Upgrades
28 May 2015
T1100044-v19 Advanced LIGO Photon Calibrator Design Requirements Jonathan Berliner et al. Laser Systems
Input Optics
Upgrades
Detector Characterization
Calibration
Basic R&D
Requirements
Auxiliary Optics
System Engineering
Vacuum
05 Feb 2015
P1500011-v1 Mechanical losses of oscillators fabricated in silicon wafers Leonid Prokhorov et al. Upgrades
Conceptual Design
22 Jan 2015
T1300433-v3 Instrument Science White Paper Rana Adhikari et al. Basic R&D
Upgrades
Core Optics
Laser Systems
Input Optics
Suspensions
Sensing and Control
System Engineering
Auxiliary Optics
Detector
Seismic Isolation
01 Dec 2014
T1400650-v1 Implementing Frequency Offset Locking of the Auxiliary lasers in the 40m Prototype Arm Length Stabilization System Andrew Hall et al. Upgrades
Auxiliary Optics
08 Nov 2014
Q1300010-v1 dcc Release 3.1.0 test doc Cleveland Mak et al. Temporary Test Document
Upgrades
System Test
22 Aug 2014
G1400899-v1 Frequency Offset Locking Andrew Hall et al. Auxiliary Optics
Upgrades
21 Aug 2014
E1300763-v2 ECR - RCG Code Change Request - RCG Version 2.8 Rolf Bork Data Acquisition System
Upgrades
19 Jun 2014
E1300534-v1 ECR - CDS Code Release RCG V2.7 Rolf Bork Change Control
Data Acquisition System
Upgrades
19 Jun 2014
E1201027-v1 ECR: Replacement of the coil-series resistors in the HAM-A coil drivers David Feldbaum Commissioning
Requirements
Upgrades
Sensing and Control
Suspensions
Input Optics
Final Design
19 Jun 2014
E1300671-v1 ECR - RCG Code Change Request - RCG Version 2.7.2 Rolf Bork Upgrades
Data Acquisition System
19 Jun 2014
T1200031-v3 LIGO III Strawman Design Workshop Report Rana Adhikari et al. Upgrades
Basic R&D
Conceptual Design
Detector
07 Apr 2014
D1300749-v1 testing the public view setting bug Cleveland Mak System Test
Upgrades
Temporary Test Document
11 Mar 2014
R1300030-v1 Vacuum Control System Upgrade Change Request Richard McCarthy et al. Operations Liens List
Upgrades
Operations
Vacuum
18 Dec 2013
E1300766-v3 the testing of BuGS 339, 340 and 341 plus other items on IE Cleveland Mak et al. System Test
Upgrades
Temporary Test Document
12 Nov 2013
T1300699-v1 ACB scatter various materials Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
T1300700-v1 ACB DLC coating on SS Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
T1300731-v1 Low-scatter Coating for SS Baffles Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300772-v1 CASI BRDF Data, #2 porcelain steel 57 deg inc Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300771-v1 Rai Weiss_porcelainized-steel_backscatter_4 Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300770-v1 CASI BRDF Data, #4 oxidized steel 3 deg inc Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300762-v1 CASI BRDF Data, #4 oxidized steel 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300764-v1 CASI BRDF Data, DLC 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300767-v1 CASI BRDF Data, DLC 15 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300768-v1 CASI BRDF Data, DLC 5 deg inc Michael Smith Auxiliary Optics
Upgrades
13 Sep 2013
T1300765-v1 BRDF Multi-AR SS 30 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300766-v1 BRDF Multi-AR SS 10 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
E1200535-v45 TMS WORK TO DO LIST GOING FORWARD Ken Mailand Auxiliary Optics
Upgrades
03 Sep 2013
T1300719-v1 BRDF Multi-AR SS 57 deg inc Michael Smith Auxiliary Optics
Upgrades
27 Aug 2013
T1300718-v1 BRDF Multi-AR SS 15 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300717-v1 BRDF Multi-AR SS 3 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300716-v1 ACB Multi-AR coating on SS Michael Smith Auxiliary Optics
Upgrades
27 Aug 2013
T1300713-v1 OFI Balance Weights for heavy table D0900015-v5 Michael Smith Auxiliary Optics
Upgrades
26 Aug 2013
T1300695-v1 BS Elliptical Baffle--Black Glass Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300692-v1 BS Elliptical Baffle Scatter_Black Glass Design Michael Smith Upgrades
15 Aug 2013
T1300591-v2 ITM Elliptical Baffle--Black Glass Hybrid Design Scattering Analysis Michael Smith Auxiliary Optics
Upgrades
15 Aug 2013
T1300691-v1 ACB upgrade SS with black glass Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300689-v2 ITM Elliptical Baffle Scatter_Black Glass Hybrid Michael Smith Auxiliary Optics
Upgrades
15 Aug 2013
T1300685-v1 ITM Elliptical Baffle Scattered Light Interference Effects Michael Smith Upgrades
Auxiliary Optics
14 Aug 2013
T1300657-v1 Analysis of DLC and Semiconductor AR Coatings for Stainless Steel Baffles Michael Smith Upgrades
Auxiliary Optics
30 Jul 2013
E1000886-v2 DCN-Revision of TMS Mirror Clamps Ken Mailand Auxiliary Optics
Upgrades
18 Jul 2013
T1300589-x0 ACB--Black Glass Hybrid Baffle Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
27 Jun 2013
D1300588-v1 ACB 1Hole with Black Glass Michael Smith Auxiliary Optics
Upgrades
21 Jun 2013
E1300411-v1 ECR for PEM upgrade Robert Schofield Upgrades
19 Jun 2013
G1200442-v1 Wideband, 3rd Generation, Gravitational-wave Antenna Rana Adhikari Upgrades
Basic R&D
26 Nov 2012
G1200573-v1 LIGO III Blue Concept Rana Adhikari Detector
Basic R&D
Upgrades
26 Nov 2012
T1200199-v2 Instrument Science White Paper LSC Upgrades
Basic R&D
Sensing and Control
Suspensions
Laser Systems
Input Optics
Core Optics
Seismic Isolation
Detector
Auxiliary Optics
30 Aug 2012
E1200786-x0 DCN for BSC-ISI Stage1 Add Dampers and remove Trim mass Sam Barnum Sensing and Control
Upgrades
28 Aug 2012
T1000075-v2 Advanced Interferometer Configurations White Paper Rana Adhikari et al. Sensing and Control
Integration
Upgrades
Basic R&D
System Engineering
26 Apr 2012
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Other data analysis
Upgrades
Fabrication
Basic R&D
Calibration
System Test
Sensing and Control
Integration
Computing/archiving
Data and Computing
Observatory Facilities
Data Acquisition System
Preliminary Design
Data quality / vetoes
Conceptual Design
Requirements
01 Apr 2012
E1100659-v1 DCN, aLIGO TCS Ring Heater Replacement Fixture Mindy Jacobson Vacuum
System Engineering
Auxiliary Optics
Installation
Fabrication
Upgrades
20 Jul 2011
E1100660-v1 BOM, aLIGO TCS Ring Heater Replacement Fixture Assembly Mindy Jacobson Vacuum
System Engineering
Auxiliary Optics
Installation
Upgrades
Final Design
12 Jul 2011
D070586-v1 HAM ISI, INSTALLATION FIXTURE, aLIGO Sam Barnum et al. Upgrades
Document Migration
Seismic Isolation
Installation
31 May 2011
D070591-v1 SPACER, HAM-ISI Installation Fixture Sam Barnum et al. Final Design
Upgrades
Seismic Isolation
29 Nov 2010
D070587-v1 External Stand, HAM-ISI Fixture Sam Barnum et al. Final Design
Document Migration
Upgrades
Seismic Isolation
21 Oct 2010
T0900289-v4 LIGO Instrument Science Priority Matrix David Shoemaker Upgrades
Collaboration
Basic R&D
Detector
02 Sep 2010
G1000323-v1 40m upgrade status Koji Arai Upgrades
Meeting
Sensing and Control
15 Jul 2010
G0900349-v4 The Present and Near Future of LIGO Jeffrey Kissel Installation
Commissioning
Basic R&D
Meeting
Upgrades
Final Design
15 Jul 2009
G0900523-v1 The transition to GEO HF Harald Lueck Detector
Upgrades
06 Jul 2009
G0900520-v2 Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer David Yeaton-Massey et al. Upgrades
30 Jun 2009
G0900141-v3 Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs Jeffrey Kissel Commissioning
Requirements
Seismic Isolation
Upgrades
Modelling
Final Design
13 Apr 2009
M080034-v1 Magnet Swap Review for Enhanced LIGO Norna Robertson Upgrades
Reviews
Suspensions
13 Mar 2009
G090004-v1 Advanced LIGO and the Second Generation of Gravitational Wave Detection Robert Ward Upgrades
06 Mar 2009
E0900008-v1 Traveler for Vacuum Bake Parts Charles Osthelder Upgrades
27 Feb 2009
D0900311-x0 Signal Breakout Circuit Board Rich Abbott Sensing and Control
Upgrades
24 Feb 2009

Number of documents found: 116


DCC Version 3.5.0, contact DCC Help