LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1200519-x0 |
aLIGO, AOS, TCS |
Mindy Jacobson |
System Engineering
Subsystem Test
System Test
Auxiliary Optics
Installation
Vacuum
|
16 Nov 2012 |
E1000369-x0 |
aLIGO Testing and Commissioning Documentation |
Dennis Coyne |
System Engineering
Subsystem Test
System Test
|
24 Jun 2022 |
T0900140-v1 |
AdL Triple Acquisition Driver Board Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
19 Aug 2009 |
T1200518-v1 |
Leak localization of the Y arm beamtube at LLO |
Michael Meyer et al. |
System Test
Vacuum
|
06 Jul 2020 |
G0900436-v1 |
eLIGO: So how's it turning out? |
Michael Zucker et al. |
Commissioning
Detector
Installation
Meeting
Integration
System Test
Upgrades
|
30 Jul 2019 |
T0900291-v1 |
PUM Driver Board Test Plan |
Ron Cutler |
System Test
|
12 Oct 2018 |
E1200702-v1 |
ITM04 Transmission |
Liyuan Zhang et al. |
System Test
Core Optics
|
12 Jun 2018 |
E1700190-v1 |
ITM01 Integrated Scatter |
Liyuan Zhang et al. |
System Test
Core Optics
|
12 Jun 2018 |
M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
Operations
Installation
System Test
Fabrication
Integration
System Engineering
Final Design
Subsystem Test
Policies
Detector
Requirements
Conceptual Design
Commissioning
|
07 Jun 2018 |
M1600168-v1 |
Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: |
Carl Adams et al. |
System Test
|
01 Jun 2016 |
G1501546-v3 |
aLIGO OFI Summary of the requirements, specifications, and test results |
Koji Arai |
Installation
Auxiliary Optics
Fabrication
System Test
Requirements
|
28 Jan 2016 |
E1000722-x0 |
PSL Testing: High-Power-Laser (HPL) |
Benno Willke |
System Test
Laser Systems
|
08 Apr 2015 |
T0900301-v1 |
PSI Actuator Test Plan |
Fabrice Matichard |
System Test
|
03 Apr 2015 |
T1100291-v2 |
aLIGO ISC Whitening Chassis Test Procedure |
Rich Abbott et al. |
System Test
Sensing and Control
|
16 Mar 2015 |
G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
Assembly
Requirements
Commissioning
Integration
System Test
Installation
Suspensions
Subsystem Test
|
08 Mar 2015 |
P1000018-v1 |
[Thesis] Length Sensing and Control of an Advanced Prototype Interferometric Gravitational Wave Detector |
Robert Ward |
Stochastic
Sensing and Control
System Test
|
09 Sep 2014 |
G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
System Test
Integration
Installation
Suspensions
Subsystem Test
Assembly
Requirements
Commissioning
|
22 Aug 2014 |
Q1300010-v1 |
dcc Release 3.1.0 test doc |
Cleveland Mak et al. |
Temporary Test Document
Upgrades
System Test
|
22 Aug 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Suspensions
Final Design
System Engineering
Data Acquisition System
Seismic Isolation
System Test
Integration
Installation
|
10 Jul 2014 |
E1300789-v2 |
ECR for 135MHz signal chain (REFLAIR-B on ISCT6) |
Rich Abbott |
Sensing and Control
System Test
|
19 Jun 2014 |
E1300788-v1 |
ECR: add baffle to PR3 Suspensions to prevent wire heating |
Dennis Coyne |
System Test
Auxiliary Optics
Change Control
Suspensions
|
19 Jun 2014 |
E1100991-x0 |
aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) |
Fabrice Matichard |
System Test
Seismic Isolation
|
18 Jun 2014 |
G1400671-v1 |
DAQ Acceptance Testing |
Rolf Bork |
Data Acquisition System
System Test
|
16 Jun 2014 |
T1400403-v1 |
Scatter measurement of small aLIGO Lenses |
GariLynn Billingsley et al. |
System Test
Input Optics
|
13 Jun 2014 |
D1300749-v1 |
testing the public view setting bug |
Cleveland Mak |
Temporary Test Document
Upgrades
System Test
|
11 Mar 2014 |
T1200415-v1 |
aLIGO LHO Resonances |
Mark Barton |
Subsystem Test
System Test
|
03 Mar 2014 |
T980121-v1 |
Preliminary results from Livingston VE vibration & acoustic testing |
Michael Zucker |
Vacuum
System Test
|
19 Feb 2014 |
E1200844-v2 |
aLIGO SUS Acceptance Criteria and Deliverables |
Jeffrey Kissel et al. |
System Test
Suspensions
|
11 Dec 2013 |
E1200639-v1 |
aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System |
Aidan Brooks et al. |
Integration
Auxiliary Optics
System Test
Installation
Subsystem Test
System Engineering
|
22 Nov 2013 |
L1300208-v4 |
the testing of BUGS 339, 340 and 341 and now 347 & 348 too! |
Cleveland Mak |
Temporary Test Document
System Test
|
20 Nov 2013 |
E1300766-v3 |
the testing of BuGS 339, 340 and 341 plus other items on IE |
Cleveland Mak et al. |
Temporary Test Document
System Test
Upgrades
|
12 Nov 2013 |
G1301146-v2 |
the testing of BUGS 339, 340 and 341 plus other items on chrome |
Cleveland Mak |
Temporary Test Document
System Test
|
14 Oct 2013 |
T1300854-v2 |
3.1.0 patch test document abc |
Cleveland Mak et al. |
Temporary Test Document
System Test
|
11 Oct 2013 |
E1300746-v2 |
3.1.0 patch test doc for IE |
Cleveland Mak |
System Test
Temporary Test Document
|
07 Oct 2013 |
G1300955-x0 |
dcc 3.1.0 release test document number three |
Cleveland Mak et al. |
Quality Assurance
System Test
Temporary Test Document
|
02 Oct 2013 |
G1301123-v2 |
3.1.0 patch test doc for chrome |
Cleveland Mak |
Temporary Test Document
System Test
|
02 Oct 2013 |
E1300719-v3 |
DCC release 3.1.0 test doc #2 |
Cleveland Mak et al. |
Temporary Test Document
System Test
|
21 Sep 2013 |
M1300504-v1 |
dcc release 3.1.0 test document #4 |
Cleveland Mak |
Temporary Test Document
System Test
|
18 Sep 2013 |
T080062-v2 |
UK Satellite Amplifier Test Plan |
Jay Heefner et al. |
System Test
Suspensions
|
18 Sep 2013 |
T0900080-v1 |
OMC Suspension Advanced LIGO Test Plan |
Norna Robertson et al. |
Suspensions
System Test
|
06 Sep 2013 |
T1100160-v9 |
aLIGO ISC QPD Transimpedance Amplifier Test Procedure |
Rich Abbott et al. |
Sensing and Control
System Test
|
27 Aug 2013 |
T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
Commissioning
System Test
|
18 Jun 2013 |
T1300419-v1 |
OFI 1st Article Data_hanford iLog |
Keita Kawabe |
System Test
Auxiliary Optics
|
25 Apr 2013 |
E1300299-x0 |
SLC & VP Test documents |
Michael Smith |
System Test
Auxiliary Optics
|
22 Apr 2013 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
Core Optics
Commissioning
System Engineering
Subsystem Test
Suspensions
Basic R&D
System Test
Auxiliary Optics
Fabrication
|
25 Mar 2013 |
D1201511-v2 |
aLIGO Pcal Tooling, Periscope Video Target Plate |
Craig Conley |
System Test
Auxiliary Optics
|
10 Jan 2013 |
D1200795-v1 |
Breakout Board - DB9 |
Tobin Fricke |
System Test
Subsystem Test
|
18 Jul 2012 |
T1200171-v1 |
Status of acoustic isolation of the H2 PSL enclosure |
Robert Schofield |
System Test
|
13 Apr 2012 |
D0901875-v1 |
Breakout Board - SCSI 68 |
David Kinzel |
System Test
Subsystem Test
|
02 Apr 2012 |
E080462-v1 |
Infrasonic Microphone and PEM++ |
Gabor Szeifert et al. |
Calibration
Computing/archiving
Other data analysis
Requirements
Preliminary Design
Conceptual Design
Observatory Facilities
Data and Computing
Data Acquisition System
Sensing and Control
Basic R&D
Data quality / vetoes
Fabrication
System Test
Upgrades
Integration
|
01 Apr 2012 |
T1200147-v1 |
IO Chassis Temperature Study |
Rich Abbott et al. |
System Engineering
System Test
|
22 Mar 2012 |
G1101178-v1 |
Research activities at the Caltech 40m prototype |
Koji Arai |
Commissioning
System Test
Basic R&D
Sensing and Control
|
24 Oct 2011 |
G1100831-v1 |
eTraveler Overview |
Rich Abbott |
System Engineering
System Test
|
13 Jul 2011 |
D0901351-v2 |
Universal PDH Servo |
Rich Abbott et al. |
System Test
|
23 May 2011 |
G1100439-v4 |
AOS TMS Technical Presentation for aLIGO NSF Review April 2011 |
Eric Gustafson |
Management
System Test
Auxiliary Optics
|
05 May 2011 |
T080021-v3 |
UK UIM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
11 Apr 2011 |
T0900322-v1 |
Satellite Box Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
T0900229-v2 |
Quad Monitor Board Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
T0900230-v2 |
Quad Top Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T0900237-v1 |
UIM Driver Board Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T0900292-v1 |
PUM Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T0900231-v3 |
TOP Driver Board Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
T0900236-v3 |
UIM Driver Unit Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
E0900028-v1 |
BSC ISI-Quad Modal analysis |
Fabrice Matichard |
System Test
Seismic Isolation
|
02 Aug 2010 |
T080014-v2 |
UK Top Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
12 May 2010 |
D0901871-v1 |
Breakout Board - DB37 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
D0901869-v1 |
Breakout Board - DB15 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
T0900164-v1 |
UK PUM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
26 Aug 2009 |
T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
System Test
Suspensions
|
02 Jul 2009 |
T0900190-v1 |
AdL Triple Low Current Driver Board Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
06 May 2009 |
T0900170-v1 |
UK Top Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner |
System Test
Suspensions
|
23 Apr 2009 |
T080340-v1 |
Searching for Isolated Pulsars Using Einstein@Home: Setting up S4R2 |
Alicia M Sintes et al. |
System Test
|
06 Mar 2009 |
T080111-v1 |
UK Satellite Amplifier Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
System Test
Suspensions
|
02 Mar 2009 |
T080048-v2 |
The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes |
Ken Strain et al. |
Suspensions
Final Design
System Test
|
27 Feb 2009 |
T0900014-v2 |
UK UIM Coil Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
System Test
Suspensions
|
24 Feb 2009 |