Document List by Author

New Code Deployment on DCC.

A new version of DCC code was just deployed. Our team is currently checking that nothing unexpected happened in the process.

This message will be removed shortly.

In the meantime please use the following read-only replicas:

Status message last updated at: Sun Apr 13 21:52:18 PDT 2025

Valery Frolov of LIGO - Livingston Observatory is listed as an author on the following documents:
(List events moderated by Valery Frolov)

LIGO-Number Title Author(s) Topic(s) Last Updated
G2201909-v3 A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update Jeffrey Kissel et al. Sensing and Control
Subsystem Test
Incoming Inspection
Commissioning
05 Sep 2023
G2300482-v2 Scatter Noise at LIGO Livingston Siddharth Soni et al. Detector Characterization
18 Aug 2023
G2101943-v1 September 2021 scattering mitigation and PEM update Robert Schofield et al. Auxiliary Optics
06 Sep 2021
C2100052-x0 LLO Commissioning Report Valery Frolov Commissioning
08 Mar 2021
E2000162-v1 Review Report Final ISC Design for the A+ Filter Cavity Daniel Sigg et al. Squeezer
30 Mar 2020
E1900373-v1 Review Report Preliminary ISC Design for the A+ Filter Cavity Daniel Sigg et al. Sensing and Control
09 Jan 2020
E1900223-v1 Review Report Design Requirements and Concept for the A+ ISC Filter Cavity and Relay Optics Daniel Sigg et al. A+
Sensing and Control
15 Nov 2019
T1800224-v1 Scattered Light in the LIGO Livingston Arm Cavities Wenxuan Jia et al. Detector Characterization
Commissioning
26 Oct 2018
T1600302-v2 aLIGO sensitivity projections for O2 Valery Frolov et al. Commissioning
17 Sep 2018
P1500260-v15 The Sensitivity of the Advanced LIGO Detectors at the Beginning of Gravitational Wave Astronomy Denis Martynov et al. Commissioning
10 Feb 2018
E1700072-v6 Timeline for the aLIGO squeezing upgrade at LLO Lisa Barsotti et al. Upgrades
26 Sep 2017
T1500012-v1 L1 OMC Controls Adam Mullavey et al. Sensing and Control
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Integration
Basic R&D
Sensing and Control
05 Mar 2015
T1400371-v2 Installation and Alignment procedure for the ISC components in HAM3 Valery Frolov et al. Sensing and Control
Installation
11 Feb 2015
P1400234-v3 In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances Chris Mueller et al. Commissioning
Sensing and Control
09 Feb 2015
T1200040-v3 L1 HAM3 Gouy Telescope Preparation Valery Frolov et al. Subsystem Test
Installation
Integration
Fabrication
Sensing and Control
21 Jan 2015
G1400531-v1 L1 TransMon IR QPD sleds tuning (both EX and EY) Valery Frolov et al. Installation
Sensing and Control
21 Jan 2015
G1400530-v1 L1 TransMon GREEN QPD sleds tuning (both EX and EY) Adam Mullavey et al. Installation
Sensing and Control
21 Jan 2015
T1400588-v1 HAM6 Alignment procedure Koji Arai et al. Installation
Sensing and Control
22 Dec 2014
P1400198-v2 Loss Dependence on Beam Position in the Arm Cavities of aLIGO Leo Tsukada et al. Core Optics
07 Nov 2014
L1400119-v1 Documentation of Two Hour Lock Milestone for L1 Peter Fritschel et al. Integration
30 Jul 2014
E1300803-x0 Changes Resulting from the L1 DRMI Testing Peter Fritschel et al. Integration
Commissioning
20 Jun 2014
E1300628-x0 aLIGO, Integration Testing, Input Mode Cleaner Test Daniel Sigg et al. Integration
19 Jun 2014
T1300126-v1 IMC Autolocker Adam Mullavey et al. Sensing and Control
Commissioning
18 Jun 2014
E1300495-v3 LLO DRMI In-air Check List Valery Frolov Commissioning
Integration
18 Jun 2014
T1300991-v1 PRMI Locking Procedure Ryan DeRosa et al. Integration
Commissioning
18 Jun 2014
T1100201-v4 Commissioning the Advanced LIGO L1 Input Mode Cleaner Peter Fritschel et al. Input Optics
Integration
18 Jun 2014
T1400368-v1 Advanced LIGO Operations Commissioning Plan Peter Fritschel et al. Commissioning
11 Jun 2014
T1300161-v1 ALS/POP beam path alignment in WHAM3/1 Keita Kawabe et al. Installation
Sensing and Control
Input Optics
30 May 2014
T1400053-v2 Integration testing report for the L1 DRMI Peter Fritschel et al. Integration
19 May 2014
T1200437-v3 Advanced LIGO Interferometer Integration Peter Fritschel et al. Integration
Commissioning
11 Dec 2013
T1300558-v1 L1 DRMI Measurements: a checklist Peter Fritschel et al. System Test
Commissioning
18 Jun 2013
L1300018-v2 Summary of the L1 Input Mode Cleaner Testing Peter Fritschel et al. Integration
16 Feb 2013
T1000298-v2 Advanced LIGO Length Sensing and Control Final Design Guido Mueller et al. Final Design
Sensing and Control
09 Apr 2012
D1101223-v1 eLIGO PSL Diagram Joseph Iafrate et al. Detector
Data Analysis
Detector Characterization
28 Jun 2011
G1100445-v3 Plenary 5 Integration Planning - NSF 2011 Valery Frolov et al. Sensing and Control
05 May 2011
P070125-x0 dc readout experiment at the Caltech 40m prototype interferometer Robert Ward et al. Public relations
Document Migration
19 Oct 2009
P070044-x0 Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity Brian O'Reilly et al. Public relations
Document Migration
14 Oct 2009
T070247-v1 AdvLIGO Interferometer Sensing and Control Conceptual Design Peter Fritschel Conceptual Design
Sensing and Control
14 Sep 2009
T080100-x0 Report of the 40M TAC 17th April 2008 Valery Frolov Document Migration
07 May 2008
G060488-x0 Status of LIGO Valery Frolov Document Migration
06 Nov 2006
T060104-x0 Study of Nonparaxiality Using the LIGO Livingston Detector Erika D'ambrosio et al. Document Migration
22 May 2006
G060021-x0 Coil driver linearity measurements K Franzen et al. Document Migration
15 Mar 2006
T050251-x0 Measuring the Long-Term Drift of the Mode Cleaner Length Ian Duke et al. Document Migration
15 Nov 2005
T050064-x0 Thermal Compensation System Description Stefan Ballmer et al. Document Migration
10 May 2005
G050228-x0 The Search for a Stochastic Gravitational Wave Background Valery Frolov Document Migration
27 Apr 2005
G050106-x0 Commissioning Progress and Plans, Livingston Observatory - LSC Meeting, March 20-23, 2005, Livingston LA Valery Frolov Document Migration
22 Mar 2005
T050040-x0 Fields in the Recycling Cavity at LIGO Livingston Observatory Erika D'ambrosio et al. Document Migration
10 Mar 2005
G040381-x0 The LIGO Experiment: Status and First Results Valery Frolov Document Migration
03 Nov 2004
T040120-x0 Measurement of the Laser Intensity Noise Coupling to the Interferometer Output Rana Adhikari et al. Document Migration
03 Jun 2004
G040016-x0 Update on IFO Power Increase at Livingston Valery Frolov et al. Document Migration
29 Jan 2004
G030524-x0 Poster - LIGO Detector Commissioning Valery Frolov Document Migration
06 Nov 2003
T030236-x0 Modification of the IFO Input Laser Power Control Rich Abbott et al. Document Migration
07 Oct 2003
G030254-x0 Mode Cleaner Wavefront Servo: Feeding Back to Mode Cleaner Mirrors Valery Frolov et al. Document Migration
18 Sep 2003

Number of documents found: 54


DCC Version 3.5.1, contact DCC Help