LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G2302098-v21 |
LIGO-Virgo-KAGRA Cumulative Detection plot - O1-O4b |
Brian Lantz et al. |
Public Talk / Colloquium
Education, Outreach
Public relations
|
23 Oct 2024 |
G2302381-v1 |
LIGO: Megascience in India |
Brian O'Reilly et al. |
Public relations
|
14 Dec 2023 |
P2000318-v11 |
GWTC-3: Compact Binary Coalescences Observed by LIGO and Virgo During the Second Part of the Third Observing Run |
Christopher Berry et al. |
Compact Binaries
|
05 Dec 2023 |
G2102395-v1 |
LIGO-Virgo-KAGRA Cumulative Detection plot |
LIGO Scientific Collaboration et al. |
Public relations
|
19 Oct 2023 |
G2001862-v4 |
LIGO-Virgo Cumulative Event Rate Plot O1-O3b |
LIGO Scientific Collaboration et al. |
Public relations
|
19 Oct 2023 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Calibration
Commissioning
|
23 Jun 2023 |
G2300834-v2 |
Engineering Run - ER15 |
Brian O'Reilly et al. |
Operations
|
13 Apr 2023 |
M1700183-v3 |
LSC Activities Program |
David Shoemaker |
Collaboration
|
12 Mar 2019 |
T2200381-v2 |
The LSC-Virgo-KAGRA Operations White Paper (2022-2023 Edition) |
Brian O'Reilly et al. |
Data quality / vetoes
Operations
Calibration
Detector Characterization
Computing/archiving
Astrophysics / Multi-messenger
Detector
|
01 Mar 2023 |
G2300149-v1 |
Update on LIGO instruments |
Brian O'Reilly et al. |
Detector
|
25 Jan 2023 |
T2200043-v3 |
Noise Curves for use in simulations pre-O4 |
Michael Coughlin et al. |
Astrophysics / Multi-messenger
Operations
Public relations
|
15 Dec 2022 |
G2201968-v1 |
Instrument Status for LVEM Town Hall meeting October 27, 2022 |
Fiodor Sorrentino et al. |
Detector
|
27 Oct 2022 |
G1901322-v25 |
LIGO-Virgo Cumulative Event/Candidate Rate Plot O1-O3 |
David Reitze et al. |
Compact Binaries
Data Analysis
|
21 Sep 2022 |
P1200087-v58 |
Prospects for Observing and Localizing Gravitational-Wave Transients with Advanced LIGO, Advanced Virgo and KAGRA |
LIGO Scientific Collaboration et al. |
Compact Binaries
Astrophysics / Multi-messenger
Commissioning
GW Bursts
|
01 Aug 2022 |
G2201198-v1 |
Recordings of openLVEM call July 21, 2022 |
Takahiro Sawada et al. |
Astrophysics / Multi-messenger
Public relations
|
21 Jul 2022 |
G2201173-v10 |
O4 run plans, risks, and data release |
Brian O'Reilly et al. |
Reports
|
21 Jul 2022 |
T2000012-v2 |
Noise curves used for Simulations in the update of the Observing Scenarios Paper |
Brian O'Reilly et al. |
Astrophysics / Multi-messenger
|
06 Apr 2022 |
T2100430-v3 |
Operations White Paper (Summer 2021 Edition) - Public Version |
Brian O'Reilly et al. |
Calibration
Detector Characterization
Operations
Data quality / vetoes
Detector
Astrophysics / Multi-messenger
Computing/archiving
|
22 Oct 2021 |
T2000294-v4 |
LSC-Virgo Operations White Paper (Summer 2020 edition) |
Nicolas Arnaud et al. |
Detector Characterization
Calibration
Data quality / vetoes
Operations
Commissioning
Computing/archiving
Data and Computing
Astrophysics / Multi-messenger
External Collaboration
|
21 Apr 2021 |
T1600014-v1 |
Report of the Detection Committee |
Frederique Marion et al. |
Data quality / vetoes
Compact Binaries
Detector Characterization
GW Bursts
|
10 Aug 2020 |
G1501317-v8 |
How we know GW150914 was NOT an injection |
Matthew Evans |
Data quality / vetoes
|
10 Aug 2020 |
G1901531-v3 |
Current O3 Schedule |
Brian O'Reilly et al. |
Astrophysics / Multi-messenger
Public Talk / Colloquium
|
16 Apr 2020 |
G2000497-v2 |
O3 LIGO-Virgo-KAGRA Update, April 2020 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
Public Talk / Colloquium
Operations
|
02 Apr 2020 |
G2000259-v1 |
Recordings of openLVEM call January 16, 2020 |
Brian O'Reilly et al. |
Public relations
Astrophysics / Multi-messenger
|
20 Feb 2020 |
G2000258-v1 |
Recordings of openLVEM call February 20, 2020 |
Brian O'Reilly et al. |
Astrophysics / Multi-messenger
Public relations
|
20 Feb 2020 |
G2000246-v4 |
O3 LIGO-Virgo-KAGRA Update, February 2020 |
Nicolas Arnaud et al. |
Public Talk / Colloquium
Public relations
Astrophysics / Multi-messenger
Detector
|
20 Feb 2020 |
G2000062-v5 |
O3 LIGO-Virgo-KAGRA Update, January 2020 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
Public Talk / Colloquium
Public relations
|
16 Jan 2020 |
G1902213-v4 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Astrophysics / Multi-messenger
Detector
|
21 Nov 2019 |
P1800307-v8 |
GWTC-1: A Gravitational-Wave Transient Catalog of Compact Binary Mergers Observed by LIGO and Virgo during the First and Second Observing Runs |
LIGO Scientific Collaboration et al. |
Compact Binaries
Astrophysics / Multi-messenger
|
07 Nov 2019 |
G1902055-v2 |
O3 commissioning break update |
Keita Kawabe et al. |
Commissioning
Detector
Astrophysics / Multi-messenger
|
23 Oct 2019 |
M1800303-v1 |
Support for LIGO Scientific Collaboration core functions in the era of gravitational-wave observations |
Brian O'Reilly et al. |
NSF
|
02 Oct 2019 |
G1901910-v1 |
Recordings of openLVEM call September 26 2019 |
Brian O'Reilly et al. |
Public relations
Astrophysics / Multi-messenger
|
27 Sep 2019 |
G1901885-v2 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Detector
|
26 Sep 2019 |
G1901482-v2 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Public Talk / Colloquium
|
15 Aug 2019 |
G1901349-v4 |
O3 LIGO-Virgo-KAGRA Update, July 18 2019 |
Joseph Betzwieser et al. |
Detector
Astrophysics / Multi-messenger
Operations
|
18 Jul 2019 |
G1901130-v2 |
O3 LIGO-Virgo (and KAGRA) update, June 20 2019 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
|
19 Jun 2019 |
G1901007-v2 |
Detectors in O3 for the LV-EM meeting |
Lisa Barsotti et al. |
Astrophysics / Multi-messenger
|
23 May 2019 |
G1900994-v2 |
The Retraction of S190518bb |
Alessio Rocchi et al. |
Data quality / vetoes
Compact Binaries
Detector Characterization
|
23 May 2019 |
G1900824-v10 |
Detectors and observations in O3 for the LV-EM meeting |
Alessio Rocchi et al. |
Detector
Astrophysics / Multi-messenger
|
25 Apr 2019 |
P080118-v3 |
Precise calibration of LIGO test mass actuators using photon radiation pressure |
Daniel Sigg et al. |
Calibration
|
16 Mar 2019 |
P0900155-v6 |
Accurate calibration of test mass displacement in the LIGO interferometers |
Jeffrey Kissel et al. |
Observatory Facilities
Commissioning
Calibration
|
16 Mar 2019 |
G1900437-v2 |
Detectors and Observation in O3 |
Keita Kawabe et al. |
Astrophysics / Multi-messenger
Detector
|
14 Mar 2019 |
G1900213-v5 |
Detectors and observations in O3 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
Operations
|
14 Feb 2019 |
L1800079-v4 |
O3 coincident observation strategy |
Brian O'Reilly et al. |
Policies
|
12 Feb 2019 |
G1802174-v3 |
Status of LIGO and Virgo and timeline of ER13, ER14 and O3 |
Lisa Barsotti et al. |
Operations
|
14 Nov 2018 |
G0900676-v3 |
Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation |
Stephany Foley et al. |
Reviews
Preliminary Design
Seismic Isolation
|
20 Jun 2018 |
G1800395-v5 |
Post O2 Installation and Commissioning |
Brian O'Reilly et al. |
Public relations
Public Talk / Colloquium
|
16 Mar 2018 |
G1800400-v1 |
Response to Open Public Alerts |
Brian O'Reilly et al. |
Public Talk / Colloquium
|
16 Mar 2018 |
P080073-v1 |
Requirements for a Ground Rotation Sensor to Improve Advanced LIGO |
Robert Schofield et al. |
Requirements
Basic R&D
Seismic Isolation
|
13 Jun 2016 |
L1600062-v1 |
Review Committee Report on the Non-Magnetic Blade-spring Damper (NMBD) |
Dennis Coyne et al. |
Suspensions
System Engineering
|
08 Apr 2016 |
L1500138-v6 |
LLO, LHO site status for GW150914 |
LIGO Scientific Collaboration et al. |
Detector
Data Analysis
|
11 Feb 2016 |
L1500019-v1 |
LHO Installation Acceptance Review Report |
Michael Landry et al. |
Reviews
|
06 May 2015 |
Q1500019-v1 |
Waiver: air bake 50 barrel nuts |
Brian O'Reilly |
System Engineering
Quality Assurance
Seismic Isolation
Vacuum
|
11 Mar 2015 |
Q1500018-v1 |
Waiver: air bake 4 dowel pins for HAM-ISI actuator assy |
Brian O'Reilly |
Seismic Isolation
Vacuum
System Engineering
Quality Assurance
|
11 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Basic R&D
Sensing and Control
Integration
|
05 Mar 2015 |
E1400459-v11 |
aLIGO LHO Installation Acceptance "Punch List" |
Michael Landry et al. |
Detector
Reviews
Installation
|
12 Feb 2015 |
G080571-v1 |
aLIGO HAM-ISI PDR: Part 3 - Production |
Brian O'Reilly |
Seismic Isolation
Preliminary Design
Reviews
|
29 Jan 2015 |
D1002834-v2 |
aLIGO Installation, LLO Y-End Station, Cartridge & Cleanroom, Layout |
Brian O'Reilly et al. |
Installation
Conceptual Design
Observatory Facilities
|
14 Jan 2015 |
E1300847-v8 |
aLIGO Installation Acceptance Document for LBSC2 |
Stuart Aston et al. |
Installation
|
20 Sep 2014 |
E1400216-v1 |
aLIGO Installation Acceptance Document for L1 DAQ |
Brian O'Reilly et al. |
Installation
|
21 Jun 2014 |
E1400202-v3 |
aLIGO Installation Acceptance Document for LHAM6 |
Brian O'Reilly |
Installation
|
21 Jun 2014 |
E1400201-v1 |
aLIGO Installation Acceptance Document for LHAM1 |
Brian O'Reilly |
Installation
|
21 Jun 2014 |
E1400082-v4 |
aLIGO Installation Acceptance Document for LBSC5 (Y) |
Stuart Aston et al. |
Installation
|
21 Jun 2014 |
E1400185-v6 |
aLIGO Installation Acceptance Document for LBSC4 (X) |
Dennis Coyne et al. |
Installation
|
21 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Seismic Isolation
Installation
Subsystem Test
Incoming Inspection
|
18 Jun 2014 |
T0900564-v2 |
aLIGO Large Actuator Test Results from Qinetiq |
Brian O'Reilly |
Incoming Inspection
Seismic Isolation
|
18 Jun 2014 |
T1100234-v2 |
aLIGO Small Actuator Test Results from Qinetiq |
Brian O'Reilly |
Seismic Isolation
|
18 Jun 2014 |
E1200483-x0 |
aLIGO, INS |
Michael Landry et al. |
Installation
Detector
|
03 Apr 2014 |
D1002842-v1 |
aLIGO Installation, LLO X-End Station, Cartridge & Cleanroom, Layout |
Brian O'Reilly et al. |
Observatory Facilities
Installation
|
18 Dec 2012 |
|
|
|
None
|
|
E0900006-v1 |
Review of HAM-ISI "Watchdog" safety software |
Sam Waldman et al. |
System Engineering
Data and Computing
Suspensions
Safety
Seismic Isolation
Data Acquisition System
|
01 Apr 2012 |
G1100511-v5 |
Plenary 4 aLIGO Installation Status, April 2011 |
Brian O'Reilly et al. |
Reviews
|
05 May 2011 |
L0900118-v8 |
Advanced LIGO Preliminary Design Review of the BSC ISI system |
Fabrice Matichard et al. |
Seismic Isolation
Reviews
Preliminary Design
|
04 May 2011 |
M1000142-v2 |
Advanced LIGO Review Committee Report: Test Mass Optical Lever PDR |
Hugh Radkins et al. |
Reviews
Auxiliary Optics
|
24 Sep 2010 |
T1000227-v1 |
Summary of S5 Calibration Models and Uncertainties |
Keita Kawabe et al. |
Calibration
Detector
|
09 Aug 2010 |
|
|
|
None
|
|
|
|
|
None
|
|
|
|
|
None
|
|
|
|
|
None
|
|
P080072-x0 |
Accurate measurement of the time delay in the response of the LIGO gravitational wave detectors |
Daniel Sigg et al. |
Public relations
Document Migration
|
26 Oct 2009 |
P070044-x0 |
Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity |
Brian O'Reilly et al. |
Document Migration
Public relations
|
14 Oct 2009 |
G0900519-v1 |
Accurate measurement of the time delay in the response of the LIGO gravitational wave detectors |
Daniel Sigg et al. |
Calibration
|
30 Jun 2009 |
M080034-v1 |
Magnet Swap Review for Enhanced LIGO |
Norna Robertson |
Suspensions
Reviews
Upgrades
|
13 Mar 2009 |
T080317-x0 |
Impact of Seismic Survey using Explosive Charges on the LIGO LIvingston Interferometer |
Jan Harms et al. |
Document Migration
|
05 Nov 2008 |
T080254-x0 |
HAM ISI List of "Gotchas", Needs and Reminders |
Joe Hanson et al. |
Document Migration
|
07 Oct 2008 |
T080262-x0 |
Cleaning and Assembly Procedure for ISI Sensor Pods |
Joe Hanson et al. |
Document Migration
|
07 Oct 2008 |
E080078-x0 |
Process Traveler - Large Trim Mass for HAM-ISI |
Brian O'Reilly |
Document Migration
|
12 May 2008 |
E080080-x0 |
Process Traveler - Miscellaneous 1/4-20 bolts to secure balance weights on HAM-ISI at LLO |
Brian O'Reilly |
Document Migration
|
12 May 2008 |
E080054-x0 |
Process Traveler - Four GS-13 chambers and four baseplates |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E080011-x0 |
Process Traveler - GS-13 CHAMBER AND BASEPLATE |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E080061-x0 |
Process Traveler - Bellows for HAM-ISI at LLO |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E080055-x0 |
Process Traveler - Silver Plated Hardware for LLO HAM-ISI |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E080010-x0 |
Process Traveler - 3/8-16x1-3/4" Silver Plated bolts for HAM-ISI |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E080018-x0 |
Process Traveler - GS-13 pod and baseplate |
Brian O'Reilly |
Document Migration
|
25 Apr 2008 |
E070299-x0 |
Process Traveler - HAM SEI spare parts |
Brian O'Reilly |
Document Migration
|
24 Apr 2008 |
G080136-x0 |
S5 Calibration Status - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Brian O'Reilly |
Document Migration
|
04 Apr 2008 |
G080216-x0 |
Investigation of Discrepancies Between Photon Calibrator, VCO and Official (Coil) Calibration Techniques - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Justin Garofoli et al. |
Document Migration
|
04 Apr 2008 |
E070308-x0 |
Process Traveler - GS-13 pod parts |
Brian O'Reilly |
Document Migration
|
11 Mar 2008 |
E070300-x0 |
Process Traveler - GS-13 Seismometer pod assembly and associated hardware |
Brian O'Reilly |
Document Migration
|
11 Mar 2008 |
E080017-x0 |
Process Traveler -1/2-13x2" and 3/8-16x2.5" SHCS-Silver Plated Hardware |
Brian O'Reilly |
Document Migration
|
11 Mar 2008 |
E070296-x0 |
Process Traveler - HAM flexure cup cleaning |
Brian O'Reilly |
Document Migration
|
06 Feb 2008 |
E070295-x0 |
Process Traveler - HAM actuator plate cleaning |
Brian O'Reilly |
Document Migration
|
10 Dec 2007 |
G060601-x0 |
All-Sky Search for Gravitational Wave Bursts during the 5th LIGO Science Run - GWDAW 11, Potsdam, Germany, December 18-21, 2006 |
Brian O'Reilly |
Document Migration
|
22 Dec 2006 |
G060645-x0 |
Status of LIGO - GWDAW 11, Potsdam, Germany, December 18-21, 2006 |
Brian O'Reilly |
Document Migration
|
22 Dec 2006 |
G060584-x0 |
Staus of LIGO |
Brian O'Reilly |
Document Migration
|
17 Nov 2006 |
T050059-x0 |
Calibration of the LIGO detectors for the S3 |
Gabriela Gonzalez et al. |
Document Migration
|
11 Sep 2006 |
G060454-x0 |
S5 Calibration Status - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Brian O'Reilly |
Document Migration
|
16 Aug 2006 |
G060121-x0 |
S4/S5 Calibration Status - LSC Meeting, March 19-22, 2006, Hanford WA |
Brian O'Reilly |
Document Migration
|
05 Jun 2006 |
T060104-x0 |
Study of Nonparaxiality Using the LIGO Livingston Detector |
Erika D'ambrosio et al. |
Document Migration
|
22 May 2006 |
G060117-x0 |
S5 calibration: time dependent coefficients - LSC Meeting, March 19-22, 2006, Hanford WA |
Gabriela Gonzalez et al. |
Document Migration
|
14 Apr 2006 |
T040175-x0 |
Specification for Storing Calibration Data for LIGO |
Duncan Brown et al. |
Document Migration
|
05 Jan 2006 |
G050554-x0 |
Status and Recent Results from the LIGO Experiment |
Brian O'Reilly |
Document Migration
|
26 Oct 2005 |
G050387-x0 |
Spectral Line Catalogue Status - LSC Meeting, August 14th - 17th, Hanford WA |
Philip Charlton et al. |
Document Migration
|
18 Aug 2005 |
G050238-x0 |
Recent Progress at LIGO |
Brian O'Reilly |
Document Migration
|
27 Apr 2005 |
G050237-x0 |
Recent Progress at LIGO |
Brian O'Reilly |
Document Migration
|
27 Apr 2005 |
G050242-x0 |
Gravitational radiation from known radio pulsars using LIGO data. |
Brian O'Reilly |
Document Migration
|
27 Apr 2005 |
T040060-x0 |
Calibration of the LIGO Detectors for S2 |
Gabriela Gonzalez et al. |
Document Migration
|
21 Apr 2005 |
T050040-x0 |
Fields in the Recycling Cavity at LIGO Livingston Observatory |
Erika D'ambrosio et al. |
Document Migration
|
10 Mar 2005 |
G040327-x0 |
Status of StochMon, a DMT monitor for stochasic sensitivity - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Marc Cenac et al. |
Document Migration
|
19 Aug 2004 |
T030298-x0 |
Transfer Function Measurements and Fits for the Revision C8 Dewhitening Filters |
Brian O'Reilly |
Document Migration
|
16 Jul 2004 |
G040176-x0 |
Time Domain Calibration: Making h(t) for LIGO - LSC Meeting, March 15 - 18th, Livingston, LA |
Bruce Allen et al. |
Document Migration
|
19 Mar 2004 |
G040152-x0 |
Storing Time-Domain Calibration Information in Frame Files - LSC Meeting, March 15 - 18th, Livingston, LA |
Gabriela Gonzalez et al. |
Document Migration
|
18 Mar 2004 |
G040143-x0 |
S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
18 Mar 2004 |
G040050-x0 |
LIGO: Current Status and Some Initial Results |
Brian O'Reilly |
Document Migration
|
27 Feb 2004 |
G030605-x0 |
Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Nov 2003 |
G030426-x0 |
S2 Calibration |
Rana Adhikari et al. |
Document Migration
|
14 Oct 2003 |
G030297-x0 |
Measurements of Environmental Coupling to the Gravitational Wave Channel (PEM Injections) |
Aleksandr Ageyev et al. |
Document Migration
|
09 Jul 2003 |
T030097-x0 |
Calibration of the LIGO detectors for the First LIGO Scientific Run |
Rana Adhikari et al. |
Document Migration
|
28 May 2003 |
G030093-x0 |
Calibration Testing - LSC Meeting, March 17th - 20th, Livingston, LA |
Gabriela Gonzalez et al. |
Document Migration
|
23 Apr 2003 |
G030105-x0 |
Background to the Calibration - LSC Meeting, March 17th - 20th, Livingston, LA |
Brian O'Reilly |
Document Migration
|
19 Mar 2003 |