LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1100187-v3 |
LHO Vertical Survey Mons & Local to Global Offsets |
Hugh Radkins |
Installation
|
21 Mar 2012 |
P1800038-v4 |
Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. |
Krishna Venkateswara et al. |
Seismic Isolation
Basic R&D
|
12 Mar 2020 |
G2000112-v1 |
Impact of the Wind Fences |
Brian Lantz et al. |
Commissioning
Seismic Isolation
Observatory Facilities
|
14 Feb 2020 |
T1900768-v4 |
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO |
Brian Lantz et al. |
Seismic Isolation
|
26 Dec 2019 |
E1900023-v2 |
aLIGO, SEI, HAM ISI Large Actuator Bobbin Assembly Procedure |
Don Griffith et al. |
A+
|
12 Dec 2019 |
G1800399-v1 |
Seismic Control during Earthquakes: Review of new technique |
Brian Lantz et al. |
Seismic Isolation
Integration
|
14 Dec 2018 |
E1800261-v1 |
Technical Information supporting Bidders Walk Through, LHO Wind Fence |
Stephen Appert et al. |
Conceptual Design
Seismic Isolation
Proposals
|
14 Nov 2018 |
P1200011-v6 |
Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement |
Fabrice Matichard et al. |
Basic R&D
Seismic Isolation
|
20 Jun 2018 |
T1100537-v3 |
HEPI Pump Servo VFD controls |
Eric Allwine et al. |
Reports
Subsystem Test
Seismic Isolation
|
05 Feb 2018 |
D020214-x0 |
Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram |
Dennis Coyne |
Document Migration
|
11 Apr 2003 |
P1700149-v7 |
Tilt Seismology |
Michael Ross et al. |
Seismic Isolation
|
11 Jul 2017 |
P1500278-v4 |
Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor |
Krishna Venkateswara et al. |
Seismic Isolation
Basic R&D
|
14 Dec 2016 |
E1101149-v19 |
HEPI Pier Components - LHO |
Eric Allwine et al. |
Seismic Isolation
Commissioning
|
21 Oct 2015 |
Q1200009-v1 |
HEPI KAMAN INDUCTIVE POSITION SENSOR (IPS) CALIBRATION SHEETS |
Eric Allwine et al. |
Seismic Isolation
Assembly
|
14 Oct 2015 |
E040339-v3 |
LLO PUMP STATION MAINTENANCE MANUAL |
Ken Mailand et al. |
Document Migration
|
21 Aug 2015 |
E1000486-v6 |
aLIGO BSC-ISI Testing Procedure, Phase I: Assembly Validation |
Vincent Lhuillier et al. |
Seismic Isolation
Subsystem Test
|
16 Mar 2015 |
E1000487-v8 |
aLIGO BSC-ISI Testing Procedure, Phase II : Integration process |
Fabrice Matichard et al. |
Seismic Isolation
Subsystem Test
|
16 Mar 2015 |
E1300823-v4 |
aLIGO HEPI H1 HAM1 Assembly Validation Report |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
10 Mar 2015 |
E0900426-v5 |
HEPI Kaman Sensor Receiving Analysis |
Hugh Radkins et al. |
Incoming Inspection
Seismic Isolation
|
10 Mar 2015 |
E1200507-v5 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1200506-v4 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1300838-v1 |
aLIGO HEPI H1 ITMX Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
12 Feb 2015 |
E1300839-v1 |
aLIGO HEPI H1 BS Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
11 Feb 2015 |
E1300840-v1 |
aLIGO HEPI H1 ITMY Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
11 Feb 2015 |
E1300841-v2 |
aLIGO HEPI H1 ETMY Assembly Validation Report |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
09 Feb 2015 |
E1300830-v1 |
aLIGO HEPI H1 HAM4 Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
05 Feb 2015 |
E1300831-v1 |
aLIGO HEPI H1 HAM5 Assembly Validation Report |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
04 Feb 2015 |
E1300832-v1 |
aLIGO HEPI H1 HAM6 Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
03 Feb 2015 |
E1200344-v4 |
All BSC, Install Completed Cartridge Into Chamber Procedure, aLIGO |
Sam Barnum et al. |
Seismic Isolation
Installation
Core Optics
Suspensions
|
18 Dec 2014 |
E1300829-v2 |
aLIGO HEPI H1 HAM3 Assembly Validation Report |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
16 Jul 2014 |
E1300828-v2 |
aLIGO HEPI H1 HAM2 Assembly Validation Report |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
16 Jul 2014 |
E1300837-v1 |
aLIGO HEPI H1 ETMX Assembly Validation Report |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1000324-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
D0902612-v2 |
Lateral Trim Mass 4.3/12 Lbs, Stage 1, aLIGO BSC ISI |
Michael Hillard et al. |
Seismic Isolation
Final Design
|
04 Jun 2014 |
E1000323-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
05 Nov 2013 |
E1000311-v9 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 |
Hugo Paris et al. |
Final Design
Seismic Isolation
|
26 Jun 2013 |
E1000314-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000313-v2 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
24 May 2012 |
E1000310-v7 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
26 Apr 2012 |
E0900025-v1 |
ALIGO BSC HEPI PreStorage Assembly Procedure |
Hugh Radkins |
Seismic Isolation
Installation
|
01 Apr 2012 |
D970210-v2 |
ASC Monument Locations-Washington Site |
Hugh Radkins et al. |
Observatory Facilities
System Engineering
Installation
|
21 Mar 2012 |
E020247-v1 |
Document Change Notice for D980400 |
Hugh Radkins et al. |
Document Migration
Laser Systems
|
08 May 2011 |
D020008-v2 |
CROSSBEAM ATTACHMENT PLATE, aLIGO HEPI BSC |
Hugh Radkins et al. |
Seismic Isolation
Final Design
|
05 Apr 2011 |
D1002314-v2 |
BSC ISI Stage 0 Plate Flip Bracket |
Hugh Radkins et al. |
Seismic Isolation
Assembly
|
10 Mar 2011 |
M1000142-v2 |
Advanced LIGO Review Committee Report: Test Mass Optical Lever PDR |
Hugh Radkins et al. |
Reviews
Auxiliary Optics
|
24 Sep 2010 |
E1000102-v2 |
LHO LABO FTIR Sample Record HR202 |
Hugh Radkins |
Seismic Isolation
Incoming Inspection
|
08 Apr 2010 |
D080497-v1 |
HEPI Pump Station Filter Braket Support Gusset |
Hugh Radkins et al. |
Final Design
Seismic Isolation
|
02 Apr 2009 |
D080498-v1 |
HEPI Pump Station Valve to Filter Assembly |
Hugh Radkins |
Final Design
Seismic Isolation
|
06 Mar 2009 |
D080519-v1 |
HEPI Pump Station Filter Bracket Assembly |
Hugh Radkins et al. |
Final Design
Seismic Isolation
|
23 Jan 2009 |
E080102-x0 |
Process Traveler - LHO ISI Upper Riser |
Hugh Radkins |
Document Migration
|
22 Nov 2008 |
E080168-x0 |
Process Traveler - LHO HAM6 ISI Sensor Target Posts |
Hugh Radkins |
Document Migration
|
22 Nov 2008 |
E080106-x0 |
Process Traveler - LHO HAM6 ISI Ag SS 3/8-16x2.5" SHCS |
Hugh Radkins |
Document Migration
|
14 Mar 2008 |
T040060-x0 |
Calibration of the LIGO Detectors for S2 |
Gabriela Gonzalez et al. |
Document Migration
|
21 Apr 2005 |
G050217-x0 |
S4 Environmental Disturbances - LSC Meeting, March 20-23, 2005, Livingston LA |
Douglas Cook et al. |
Document Migration
|
28 Mar 2005 |
G040143-x0 |
S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
18 Mar 2004 |
G030660-x0 |
Losses in LHO HR Surfaces - LSC Meeting, November 10th - 13th, Hanford WA |
David Barker et al. |
Document Migration
|
19 Nov 2003 |
G030605-x0 |
Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Nov 2003 |
G030426-x0 |
S2 Calibration |
Rana Adhikari et al. |
Document Migration
|
14 Oct 2003 |
T030097-x0 |
Calibration of the LIGO detectors for the First LIGO Scientific Run |
Rana Adhikari et al. |
Document Migration
|
28 May 2003 |
T980132-x0 |
Lab Notes from Ham Shell/Support Table Interference Checks |
Hugh Radkins |
Document Migration
|
08 Oct 2002 |
G020059-x0 |
Tidal Compensation Update - LSC Meeting, March 20 - 23, Livingston LA |
Fred Raab et al. |
Document Migration
|
21 Mar 2002 |
G010106-x0 |
E2 Investigation: Tidal Model - LSC Meeting March 14 -17 2001 Livingston, LA |
Fred Raab et al. |
Document Migration
|
23 Mar 2001 |
T000005-x0 |
2k FMy Pendulum Q |
Betsy Weaver et al. |
Document Migration
|
29 Sep 2000 |
G000262-x0 |
Source and Propagation of Predominant 1-50 HZ Seismic Signal from Off-Site at LIGO-Hanford - LSC Meeting at Hanford, August 15-17, 2000 |
Gabriela Gonzalez et al. |
Document Migration
|
20 Sep 2000 |
E990129-x0 |
SEI BSC Installation Procedure |
Hugh Radkins |
Document Migration
|
03 Jun 1999 |