LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1300430-v1 |
aLIGO Front-end Computer BIOS Settings |
Keith Thorne et al. |
Installation
Data Acquisition System
|
26 Apr 2013 |
E1400144-x0 |
aLIGO,DAQ,PEM |
Robert Schofield et al. |
Data Acquisition System
Integration
|
19 May 2023 |
D1201372-v2 |
MSR Rack MSR-01 |
David Kinzel et al. |
Installation
|
08 Jan 2015 |
D1201085-v8 |
CERX Rack DAQ-XC1 |
David Kinzel et al. |
Installation
|
04 Sep 2015 |
D1201092-v7 |
CERY Rack DAQ-YC1 |
David Kinzel et al. |
Installation
|
04 Sep 2015 |
G1501317-v8 |
How we know GW150914 was NOT an injection |
Matthew Evans |
Data quality / vetoes
|
10 Aug 2020 |
P2000107-v6 |
advligorts: The Advanced LIGO Real-Time Digital Control and Data Acquisition System |
Jameson Graef Rollins et al. |
Sensing and Control
Data Acquisition System
Data and Computing
|
31 Mar 2020 |
P1600285-v21 |
Validating gravitational-wave detections: The Advanced LIGO hardware injection system |
Christopher Biwer et al. |
Detector
|
20 Feb 2017 |
T1500115-v5 |
Real-Time Code Generator (RCG) SDF Software |
Rolf Bork et al. |
Data Acquisition System
|
09 Nov 2016 |
T1600055-v7 |
Real-Time Code Generator (RCG) Version 3.0 Release Notes |
Rolf Bork et al. |
Data Acquisition System
Upgrades
|
09 Nov 2016 |
T1400570-v7 |
RCG Version 2.9 Release Notes |
Rolf Bork et al. |
Upgrades
Data Acquisition System
|
09 Nov 2016 |
T1500405-v1 |
Hardware Watchdog Chassis Analysis and Review |
Rich Abbott et al. |
System Engineering
|
30 Jul 2015 |
D070478-x0 |
OBSOLETE: LHO Output Mode Cleaner (OMC) Computing MSR Test Stand Wiring Drawing |
David Barker |
Document Migration
|
16 Oct 2014 |
D070152-x0 |
OBSOLETE: LHO MSR UPS |
David Barker |
Document Migration
|
16 Oct 2014 |
D990636-x0 |
OBSOLETE: Hanford Rack Layout - MSR-5 Chassis Layouts (Mass Storage Room) |
David Barker |
Document Migration
|
15 Oct 2014 |
D990635-x0 |
OBSOLETE: Hanford Rack Layout - MSR-4 Chassis Layout (Mass Storage Room) |
David Barker |
Document Migration
|
15 Oct 2014 |
D990634-x0 |
OBSOLETE: Hanford Rack Layout - MSR-3 Chassis Layout (Mass Storage Room) |
David Barker |
Document Migration
|
15 Oct 2014 |
D990633-x0 |
OBSOLETE: Hanford Rack Layout - MSR-2 Chassis Layout (Mass Storage Room) |
David Barker |
Document Migration
|
15 Oct 2014 |
D990632-x0 |
OBSOLETE: Hanford Rack Layout - MSR-1 |
David Barker |
Document Migration
|
15 Oct 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Final Design
Integration
System Test
Suspensions
Data Acquisition System
Installation
System Engineering
Seismic Isolation
|
10 Jul 2014 |
G990056-x0 |
CDS Installation at Hanford - PAC6 Meeting Presentation, 20-21 May 1999 |
David Barker |
Document Migration
|
16 May 2014 |
D990637-x0 |
Hanford Controls Video System Overview |
David Barker |
Document Migration
|
07 May 2014 |
G960274-x0 |
DAQ Prototype Plan for 40m - Science & Integration Meeting, 12-13 December 1996 |
David Barker et al. |
Document Migration
|
14 Mar 2014 |
R1300030-v1 |
Vacuum Control System Upgrade Change Request |
Richard McCarthy et al. |
Operations
Vacuum
Operations Liens List
Upgrades
|
18 Dec 2013 |
D070125-v3 |
LHO CDS Lans and Gateways |
David Barker |
Installation
Observatory Facilities
|
29 Nov 2011 |
T080058-x0 |
Universal Computing Authentication and Authorization for Ligo-Virgo Community |
Stuart Anderson et al. |
Document Migration
|
29 Aug 2008 |
D080346-x0 |
eLIGO DAQ LHO |
David Barker |
Document Migration
|
07 Jul 2008 |
D070151-x0 |
LHO CDS H1 Wire Protection EPICS Sequencer Flow Diagram |
David Barker |
Document Migration
|
07 Nov 2007 |
D070144-x0 |
LHO CDS Projection of the AS_Q Figure Of Merit Image for S5 |
David Barker |
Document Migration
|
07 Nov 2007 |
T990110-x0 |
Calculating the Trend Data |
David Barker et al. |
Document Migration
|
17 May 2007 |
D980354-x0 |
Hanford Timing System Cable Diagram |
David Barker et al. |
Document Migration
|
06 Nov 2006 |
G030660-x0 |
Losses in LHO HR Surfaces - LSC Meeting, November 10th - 13th, Hanford WA |
David Barker et al. |
Document Migration
|
19 Nov 2003 |
G030614-x0 |
On detector timing: the dawn of S3 - LSC Meeting, November 10th - 13th, Hanford WA |
David Barker et al. |
Document Migration
|
14 Nov 2003 |
T980037-x0 |
LIGO Time Standard |
David Barker et al. |
Document Migration
|
01 May 2003 |
G020463-x0 |
Web - Epics Interfaces at LIGO |
David Barker et al. |
Document Migration
|
14 Nov 2002 |
D020528-x0 |
LIGO Hanford CDS-LDAS Hardware Interface |
David Barker |
Document Migration
|
14 Nov 2002 |
D970583-x0 |
Hanford Control & Monitoring Network (Overview) |
David Barker et al. |
Document Migration
|
25 Feb 2000 |
D990015-x0 |
Hanford CDS Rack Layout - 2x3, Chassis Layouts |
David Barker et al. |
Document Migration
|
05 May 1999 |
T980020-x0 |
GDS Reflective Memory Organization, Rev. A |
David Barker et al. |
Document Migration
|
26 Apr 1999 |
T980026-x0 |
LIGO Data Acquisition System Final Design |
David Barker et al. |
Document Migration
|
29 Apr 1998 |
E970162-x0 |
Hanford EPICS Vacuum Controls 2500 l/s Ion Pump Test Specifications |
David Barker |
Document Migration
|
23 Dec 1997 |
E970158-x0 |
Hanford EPICS Vacuum Controls, Vacuum Gauge Pair (Pirani and Cold Cathode) Test Specifications |
David Barker et al. |
Document Migration
|
23 Dec 1997 |
T970185-x0 |
How to Build a Hanford Right End Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
E970160-x0 |
Hanford EPICS Vacuum Controls Pneumatic Gate ValveTest Specification |
David Barker et al. |
Document Migration
|
23 Dec 1997 |
T970179-x0 |
How to Build the Hanford Left End Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
T970184-x0 |
How to Build a Hanford Right Mid Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
T970180-x0 |
How to Build a Hanford Left Mid Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
T970183-x0 |
How to Build a Hanford Mechanical Room Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
T970182-x0 |
How to Build a Hanford Right LVEA-X Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
T970181-x0 |
How to Build a Hanford Left LVEA-Y Station EPICS Vacuum Controls System |
David Barker |
Document Migration
|
23 Dec 1997 |
E970161-x0 |
Hanford EPICS Vacuum Controls, Cryogenic Pump Test Specification |
David Barker et al. |
Document Migration
|
23 Dec 1997 |
E970163-x0 |
Hanford EPICS Vacuum Controls 75 l/s Ion Pump Test Specifications |
David Barker et al. |
Document Migration
|
23 Dec 1997 |
E970159-x0 |
Hanford EPICS Vacuum Controls Electric Gate Valve Test Specification |
David Barker et al. |
Document Migration
|
23 Dec 1997 |
T970136-x0 |
CDS Data Acquisition Preliminary Design |
David Barker et al. |
Document Migration
|
11 Aug 1997 |
T960136-x0 |
CDS Data Acquisition Preliminary Design |
David Barker et al. |
Document Migration
|
03 Aug 1997 |
T950120-x0 |
CDS Control and Monitoring Conceptual Design |
David Barker et al. |
Document Migration
|
02 Oct 1996 |
T960010-x0 |
CDS Data Acquisition System Conceptual Design |
David Barker et al. |
Document Migration
|
17 Jul 1996 |