LIGO Document E1000487-v8

aLIGO BSC-ISI Testing Procedure, Phase II : Integration process

Document #:
LIGO-E1000487-v8
Document type:
E - Engineering documents
Other Versions:
LIGO-E1000487-v7
23 Apr 2013, 13:49
Abstract:
This document describes the testing process related to:

- Integration with Optics and other sub-systems
- Insertion in the chamber.

This phase finishes when the chamber is closed for pump-down.

Files in Document:
  • pdf (E1000487-v8 aLIGO BSC-ISI Testing Procedure, Phase II ...pdf, 162.8 kB)
Other Files:
  • doc (E1000487-v8 aLIGO BSC-ISI Testing Procedure, Phase II ...doc, 547.5 kB)
Notes and Changes:
Updated/Corrected Range of Motion Criteria on Page 8-HR

DCC Version 3.5.0, contact DCC Help