LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T2200025-v2 |
Update to the BLRMS Code: Custom BLRMS, Transposed Direct Form 2, and Reduced DC Order |
Nathan Holland et al. |
Seismic Isolation
|
08 Aug 2022 |
T2100269-v1 |
Comparing Wind-Driven Motion at LHO’s Corner and End Stations Between O3a and O3b |
Andrew Gao et al. |
Seismic Isolation
Observatory Facilities
|
12 Jul 2021 |
P1800038-v4 |
Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. |
Krishna Venkateswara et al. |
Basic R&D
Seismic Isolation
|
12 Mar 2020 |
T1900768-v4 |
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO |
Brian Lantz et al. |
Seismic Isolation
|
26 Dec 2019 |
T1900777-v1 |
Reducing differential motion using CPS sensors |
Chiara DiFronzo et al. |
Seismic Isolation
|
20 Nov 2019 |
T1900107-v1 |
Some thoughts on Controlling SRCL |
Sam Cooper et al. |
Seismic Isolation
Sensing and Control
Suspensions
|
19 Nov 2019 |
T1800066-v2 |
typical motion of HAM Suspension points in O2 |
Brian Lantz et al. |
Installation
Seismic Isolation
|
17 Dec 2018 |
G1800399-v1 |
Seismic Control during Earthquakes: Review of new technique |
Brian Lantz et al. |
Seismic Isolation
Integration
|
14 Dec 2018 |
P1700149-v7 |
Tilt Seismology |
Michael Ross et al. |
Seismic Isolation
|
11 Jul 2017 |
P1500278-v4 |
Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor |
Krishna Venkateswara et al. |
Seismic Isolation
Basic R&D
|
14 Dec 2016 |
E1000486-v6 |
aLIGO BSC-ISI Testing Procedure, Phase I: Assembly Validation |
Vincent Lhuillier et al. |
Seismic Isolation
Subsystem Test
|
16 Mar 2015 |
E1000487-v8 |
aLIGO BSC-ISI Testing Procedure, Phase II : Integration process |
Fabrice Matichard et al. |
Seismic Isolation
Subsystem Test
|
16 Mar 2015 |
E1200509-v1 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 5 (Unit #6) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1200508-v1 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 4 (Unit #7) |
Jim Warner |
Subsystem Test
Seismic Isolation
|
17 Feb 2015 |
E1200507-v5 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1200506-v4 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1100303-v1 |
aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #10 |
Vincent Lhuillier et al. |
Subsystem Test
Seismic Isolation
|
09 Feb 2015 |
E1100847-v1 |
aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #3 BSC2 BS |
Jim Warner |
Seismic Isolation
Subsystem Test
|
28 Jan 2015 |
D1001797-v2 |
aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout |
Dennis Coyne |
Installation
|
14 Jan 2015 |
E1100302-v2 |
aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #9 |
Jim Warner |
Seismic Isolation
Subsystem Test
|
19 Nov 2014 |
E1100849-v3 |
aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #5 - BSC9 - ETMX |
Jim Warner et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100848-v8 |
aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #4 - BSC3 - ITMX |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100299-v4 |
aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #6 |
Jim Warner |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
G1201026-v1 |
LHO HAM ISI Operator Training Session |
Hugo Paris et al. |
Seismic Isolation
Operations
|
18 Jun 2014 |
E1000324-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1000323-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
05 Nov 2013 |
E1000311-v9 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 |
Hugo Paris et al. |
Seismic Isolation
Final Design
|
26 Jun 2013 |
D070107-v2 |
HAM6 Septum Plate for ELIGO |
Jim Warner |
Final Design
Vacuum
|
10 Jun 2013 |
E1000314-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
28 Jun 2012 |
E1000313-v2 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
28 Jun 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
24 May 2012 |
E1000310-v7 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
26 Apr 2012 |
D1002314-v2 |
BSC ISI Stage 0 Plate Flip Bracket |
Hugh Radkins et al. |
Assembly
Seismic Isolation
|
10 Mar 2011 |
D0900946-v4 |
D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
Final Design
System Engineering
Vacuum
|
23 Aug 2010 |
D1000188-v1 |
44 5/8" Grooved and slotted flange |
John Worden et al. |
Vacuum
|
11 May 2010 |
D1000245-v1 |
IO Tubes CORNER STATION LAYOUT |
John Worden et al. |
Vacuum
|
02 Feb 2010 |
D0902724-v2 |
84.25 IN Flange - Flat Faced (PSI Ref. V0494127) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Integration
System Engineering
Vacuum
|
11 Jan 2010 |