LIGO-E1000310-v4
07 Feb 2012, 18:39 |
Particularities:
------------------
-Test GS13 were used. Production GS13s have to be installed, and tested, before in-chamber installation of the unit.
-No L4C
Complementary inquiry:
--------------------------------
-Investigation of the effect of the top mass’s boundary conditions on the TF of HAM-ISIs.
Minor issues that don’t imply further work:
----------------------------------------------------------
-CPS gap measurement with a jig was waived to avoid scratching targets
-Stage 0 level is out of requirements
-Blade #1 spring profile slightly out of requirements
-Adjustment of locker D is borderline
-Excessive STD measured on CPSs is associated to ground motion
Minor issues that imply further work:
---------------------------------------------------
-Actuators linearity is within requirement. However the average slope deviation is out of spec. It seems to correlate with the cable+actuator resistance measurements. This observation needs to be correlated with the final measurements made with the in-field cables.
-Damping loops implementation and testing were waived and need to be performed during the next phase of testing.