LIGO Document T1100201-v4

Commissioning the Advanced LIGO L1 Input Mode Cleaner

Document #:
LIGO-T1100201-v4
Document type:
T - Technical notes
Other Versions:
Abstract:
The first integration phase for the Advanced LIGO L1 interferometer is the commissioning of the Input Mode Cleaner (IMC), the Faraday Isolator (FI), the auxiliary input optics (IO), and the power recycling cavity optics located in the HAM2 and 3 vacuum chambers, using the light beam from the Pre-Stabilized Laser (PSL). The integrated testing of the PSL/IMC/IO is expected to begin in mid December of 2011. This document describes the plans and goals of this phase.
Files in Document:
Related Documents:

DCC Version 3.4.2, contact Document Database Administrators