LIGO Document T1200040-v3
- We prepared the HAM3 ISC QPD sled for installation. This note includes the measured distances, beam parameters, and calculated Gouy phases for an input test beam similar to (but not identical to) the L1 POP beam.
-
- [PDF] File (L1_HAM3_Gouy_Telescope_Preparation.pdf, 48.0 kB)
- Other Files:
DCC Version 3.5.0, contact
DCC Help