Document List by Author

Michael Vargas of LIGO - Livingston Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
G1100507-v2 aLIGO SEI Testing Presentation, HAM-ISI, LLO Unit 3 Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
20 Jun 2018
T1400160-v8 Optical Lever Inspection and Hanford Thomas Vo et al. Auxiliary Optics
Installation
16 May 2017
T1400593-v2 Optical Lever Fermion II Internal Optimization Procedure Suresh Doravari Subsystem Test
Auxiliary Optics
10 May 2017
E1300577-v7 SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document Michael Smith et al. Auxiliary Optics
Installation
Assembly
10 May 2017
E1200103-v3 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 4 (Unit #4) James Thomas et al. Seismic Isolation
Subsystem Test
17 Feb 2015
T1400393-v5 LLO Optical Lever Commissioning and Testing Report Thomas Vo et al. Subsystem Test
12 Dec 2014
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Seismic Isolation
Subsystem Test
05 Nov 2014
E1000331-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 Fabrice Matichard et al. Seismic Isolation
Subsystem Test
26 Oct 2014
E1200105-v4 aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 Fabrice Matichard et al. Seismic Isolation
18 Jun 2014
E1101141-v1 Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 6 Michael Vargas et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1101140-v1 Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 8 Michael Vargas et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100396-v1 aLIGO Seismometer Pods Neon Leak Test Results Michael Vargas Subsystem Test
Seismic Isolation
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Subsystem Test
Requirements
Seismic Isolation
Assembly
18 Jun 2014
E1100395-v1 aLIGO GS-13 Post Modification testing results Jeffrey Kissel et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100393-v2 aLIGO GS-13 as received testing results Jeffrey Kissel et al. Seismic Isolation
Subsystem Test
18 Jun 2014
D1400191-x0 FI2 635S Micro Laser Fermion II Michael Vargas Commissioning
Subsystem Test
18 Jun 2014
T1300733-v1 Relative-intensity noise in optical levers and radiation pressure on the test masses Eric Black et al. Subsystem Test
Auxiliary Optics
13 Sep 2013

Number of documents found: 17


DCC Version 3.5.0, contact DCC Help