LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G1100507-v2 |
aLIGO SEI Testing Presentation, HAM-ISI, LLO Unit 3 |
Vincent Lhuillier et al. |
Subsystem Test
Seismic Isolation
|
20 Jun 2018 |
T1400160-v8 |
Optical Lever Inspection and Hanford |
Thomas Vo et al. |
Auxiliary Optics
Installation
|
16 May 2017 |
T1400593-v2 |
Optical Lever Fermion II Internal Optimization Procedure |
Suresh Doravari |
Subsystem Test
Auxiliary Optics
|
10 May 2017 |
E1300577-v7 |
SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document |
Michael Smith et al. |
Auxiliary Optics
Installation
Assembly
|
10 May 2017 |
E1200103-v3 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 4 (Unit #4) |
James Thomas et al. |
Seismic Isolation
Subsystem Test
|
17 Feb 2015 |
T1400393-v5 |
LLO Optical Lever Commissioning and Testing Report |
Thomas Vo et al. |
Subsystem Test
|
12 Dec 2014 |
E1100427-v4 |
aLIGO SEI Testing, HAM-ISI, Results Compilation |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
05 Nov 2014 |
E1000331-v3 |
aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 |
Fabrice Matichard et al. |
Seismic Isolation
Subsystem Test
|
26 Oct 2014 |
E1200105-v4 |
aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 |
Fabrice Matichard et al. |
Seismic Isolation
|
18 Jun 2014 |
E1101141-v1 |
Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 6 |
Michael Vargas et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1101140-v1 |
Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 8 |
Michael Vargas et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1100396-v1 |
aLIGO Seismometer Pods Neon Leak Test Results |
Michael Vargas |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
Q1100073-v32 |
Seismometer and Pod Issue Tracking |
Michael Vargas et al. |
Subsystem Test
Requirements
Seismic Isolation
Assembly
|
18 Jun 2014 |
E1100395-v1 |
aLIGO GS-13 Post Modification testing results |
Jeffrey Kissel et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100393-v2 |
aLIGO GS-13 as received testing results |
Jeffrey Kissel et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
D1400191-x0 |
FI2 635S Micro Laser Fermion II |
Michael Vargas |
Commissioning
Subsystem Test
|
18 Jun 2014 |
T1300733-v1 |
Relative-intensity noise in optical levers and radiation pressure on the test masses |
Eric Black et al. |
Subsystem Test
Auxiliary Optics
|
13 Sep 2013 |