LIGO Document T1400393-v5
- This document will describe the in-situ testing of the optical levers as they are installed at LLO. This is a working document until all optical levers are full installed per the FDR.
- V3 - Added PR3 and SR3.
V4 - Added Beam Profiles for ETMY, ITMX, ITMY, PR3, SR3. Telescope adjustment is needed for: ETMX, ITMX, ITMY.
V5 - Added Summary entry for ease of use.
DCC Version 3.5.0, contact
DCC Help