LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1003029-v1 |
Work Platform Example Drawing |
Sam Barnum et al. |
Requirements
Observatory Facilities
|
26 Oct 2023 |
E1000654-v5 |
Specification for LIGO BSC Work Platforms |
John Worden et al. |
Installation
|
19 Oct 2023 |
E1000046-v1 |
Vacuum System Viton O-ring Procurement Specification |
John Worden et al. |
Vacuum
|
02 Mar 2023 |
D990684-v1 |
Final "As-built" Vacuum Equipment Documents & Drawings for Initial LIGO |
John Worden et al. |
Vacuum
|
05 Jan 2021 |
C960962-x0 |
LIGO Vacuum Equipment, Final Design Report, Revision 2 - Project Management Plan, Volume 1 (CDRL 03) |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
C960967-x0 |
LIGO Vacuum Equipment, Final Design Report - Installation/Commissioning, Volume IV, Revision 3 (CDRL 03) |
Psi Psi et al. |
Document Migration
|
16 Sep 2020 |
C960964-x0 |
LIGO Vacuum Equipment, Final Design Report - Calculations, Volume 2 - Attachment 1-4, Revision 1 (CDRL 03) |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
C960966-x0 |
LIGO Vacuum Equipment, Final Design Report - Fabrication, Volume 3, Revision 1 (CDRL 03) |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
C960965-x0 |
LIGO Vacuum Equipment, Final Design Report - Specifications, Volume 2 - Attachment 5 (CDRL 03) |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
E0900402-v1 |
Specification for SS Plate |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
E960127-x0 |
Operating Procedure for the 80K Pump of the LIGO Vacuum Equipment - Livingston and Hanford, Rev. 02 |
Psi Psi et al. |
Document Migration
|
16 Sep 2020 |
E970036-x0 |
Specification for Structural Carbon Steel Fabrication and Painting for LIGO Vacuum Equipment |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
E960132-x0 |
Fabrication Plan for Horizontal Access Modules (HAM), LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
E960133-x0 |
Fabrication Plan for 80K Cryopumps, LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
D1100112-v1 |
Adapter A-18 |
Jodi Fauver et al. |
Installation
|
16 Sep 2020 |
D1100110-v1 |
Adapter A-16 |
John Worden et al. |
Installation
|
16 Sep 2020 |
E970172-x0 |
O-Ring Installation and Flange Assembly Procedure for LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley et al. |
Document Migration
|
16 Sep 2020 |
E0900406-v1 |
Specification for SS Rolling and Machining. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
E0900405-v1 |
Specification for SS Flange Forgings. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
D0902635-v1 |
Annulus Piping Detail. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
E960003-x0 |
Specification for Bakeout Blanket System for the Vacuum Equipment |
Richard Bagley et al. |
Document Migration
|
16 Sep 2020 |
E960004-x0 |
Specification for Roughing Pump Carts for the Vacuum Equipment, Revision 2 |
Richard Bagley |
Document Migration
|
16 Sep 2020 |
E950120-x0 |
Specifications for Stainless Steel Flange Forgings for LIGO Vacuum Equipment, Hanford and Livingston, Rev. 03 |
Psi Psi et al. |
Document Migration
|
16 Sep 2020 |
C961940-x0 |
Cambridge Acoustical Associates (CAA) Preliminary Report on 80K Pump Bubble Noise and Technical Article |
Richard Bagley |
Document Migration
|
27 Jul 2018 |
C962160-x0 |
80K Pump Test Data |
Richard Bagley |
Document Migration
|
27 Jul 2018 |
C962452-x0 |
Prototype BSC Data Review Package - CDRL 11 |
Richard Bagley |
Document Migration
|
27 Jul 2018 |
C962713-x0 |
Cambridge Acoustical Associates Data for the Prototype Vessel Data Review |
Richard Bagley |
Document Migration
|
26 Jul 2018 |
C982423-x0 |
Washington Corner Station Acceptance Test Report |
Richard Bagley |
Document Migration
|
27 Mar 2018 |
C982419-x0 |
Washington Corner Station Documentation Package: Vertex Section, Volumes 1 through 3 |
Richard Bagley |
Document Migration
|
27 Mar 2018 |
C981626-x0 |
Washington Site - Left Arm Stations, Acceptance Test Review Data Package (CDRL 07-1) |
Richard Bagley |
Document Migration
|
27 Mar 2018 |
C990033-x0 |
LIGO Vacuum Equipment, Louisiana Site - Installation & Alignment Documentation Package |
Richard Bagley |
Document Migration
|
14 Mar 2018 |
C960963-x0 |
LIGO Vacuum Equipment, Final Design Report, - Design, Volume 2, Revision 1 (CDRL 03) |
Richard Bagley |
Document Migration
|
18 Jan 2018 |
C970091-x0 |
Measurement and Analysis of LIGO Vacuum System Shock Vibration, and Acoustic Noise, Rev. 2 - Prepared by Cambridge Acoustical Associates |
Richard Bagley |
Document Migration
|
06 Apr 2017 |
D970451-x0 |
25 Annulus Tubing ISO, 44" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 |
Richard Bagley et al. |
Document Migration
|
21 Apr 2014 |
D970449-x0 |
25 Annulus Tubing ISO, 44" Gate Valve Type 1, LIGO Vacuum Equipment, Rev. 02 |
Richard Bagley et al. |
Document Migration
|
21 Apr 2014 |
D970417-x0 |
25 Annulus Tubing ISO, 48" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 |
Richard Bagley et al. |
Document Migration
|
21 Apr 2014 |
D970415-x0 |
25 Annulus Tubing ISO, 48" Gate Valve Type I, LIGO Vacuum Equipment, Rev. 02 |
Richard Bagley et al. |
Document Migration
|
21 Apr 2014 |
D070107-v2 |
HAM6 Septum Plate for ELIGO |
Jim Warner |
Vacuum
Final Design
|
10 Jun 2013 |
E980091-x0 |
Procedure for Backfill/Pumpdown Demonstration and LN2 Consumption Test - LIGO Vacuum Equipment, Hanford and Livingston |
Richard Bagley |
Document Migration
|
19 Jun 2012 |
E970176-x0 |
Specification for Booster Pump Skid for LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
19 Jun 2012 |
E970174-x0 |
Washington Site Redesign of Equipment Anchorage for Extended Grout Pads |
Richard Bagley |
Document Migration
|
19 Jun 2012 |
E970173-x0 |
Support Design for Adapters LB-1A & LB-1C |
Richard Bagley |
Document Migration
|
19 Jun 2012 |
E970171-x0 |
Systems Acceptance Test Procedure, LIGO Vacuum Equipment - End Stations, Hanford & Livingston, Rev. 04 |
Psi Psi et al. |
Document Migration
|
19 Jun 2012 |
E970170-x0 |
Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Mid Stations, Hanford & Livingston, Rev. 04 |
Psi Psi et al. |
Document Migration
|
19 Jun 2012 |
E970169-x0 |
Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Corner Stations, Hanford & Livingston, Rev. 04 |
Psi Psi et al. |
Document Migration
|
19 Jun 2012 |
E970168-x0 |
Acceptance Test Procedure for Bakeout System Blankets and Carts for LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley et al. |
Document Migration
|
19 Jun 2012 |
E970002-x0 |
Specification for Leak Check Plan for LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960134-x0 |
Fabrication Plan for Spools and Beam Tubes, LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960131-x0 |
Fabrication Plan for Beam Splitter Chamber (BSC), LIGO Vacuum Equipment - Hanford & Livingston |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960008-x0 |
Specification for Piping Design and Material for LIGO Vacuum Equipment - Hanford & Livingston, Rev. 07 |
Psi Psi et al. |
Document Migration
|
14 Jun 2012 |
E960007-x0 |
Specification for General Equipment Requirements for the Vacuum Equipment, Revision 2 |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960006-x0 |
Specification for Auxilliary Turbomolecular Carts for the Vacuum Equipment, Revision 2 |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960005-x0 |
Specification for Main Turbomolecular Carts for the Vacuum Equipment, Revision 3 |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960002-x0 |
Specification for Portable Soft-Walled Cleanroom, Revision 0 |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E960001-x0 |
Specification for Clean Air Supply Systems, Revision 0 |
Richard Bagley |
Document Migration
|
14 Jun 2012 |
E950118-x0 |
Bill of Material for BSC Prototype |
Richard Bagley |
Document Migration
|
12 Jun 2012 |
E950095-x0 |
Specification for 112 and 122 CM Gate Valves for LIGO Vacuum Equipment |
Richard Bagley et al. |
Document Migration
|
12 Jun 2012 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Integration
Fabrication
Cleaning
Vacuum
Procurements
|
17 Aug 2011 |
D1002926-v2 |
Module-E, BSC Cartridge installation, aLIGO |
Sam Barnum et al. |
Observatory Facilities
Installation
|
15 Jun 2011 |
E1000711-v3 |
ALIGO LA Corner Station VE Installation Specification |
John Worden et al. |
Installation
|
11 Apr 2011 |
E1000712-v3 |
Anchor Bolt Installation |
John Worden et al. |
Installation
|
06 Apr 2011 |
E1000708-v1 |
WA Corner Station Installation |
Jodi Fauver et al. |
Installation
|
29 Mar 2011 |
E0900410-v4 |
Vacuum Component List |
John Worden et al. |
Vacuum
|
21 Mar 2011 |
E1000718-v1 |
Specification for Vacuum/Clean Air Piping |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000717-v1 |
Specification for Piping Thermal Insulation |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000713-v1 |
Specification for Piping Design and Material |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000715-v1 |
Specification for Pipe Cleaning |
John Worden et al. |
Installation
|
03 Mar 2011 |
D1003179-v2 |
aLIGO Installation, LHO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
28 Feb 2011 |
D1003180-v2 |
aLIGO Installation, LLO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
24 Feb 2011 |
E1000707-v5 |
WA Mid/End VE Installation |
John Worden et al. |
Installation
|
04 Feb 2011 |
D1100113-v1 |
Mid-Station Spool-LHO |
John Worden et al. |
Installation
|
21 Jan 2011 |
D1100111-v1 |
Adapter A-17 |
John Worden et al. |
Installation
|
21 Jan 2011 |
E1000716-v1 |
Component Alignment Procedure |
John Worden et al. |
Installation
|
20 Jan 2011 |
E1000719-v1 |
Contamination Control for Adv. LIGO Vacuum Equipment Installation |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003175-v2 |
aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003176-v2 |
aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003178-v1 |
aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
D1003177-v1 |
aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
E1000714-x0 |
Vacuum Valves |
John Worden et al. |
Installation
|
16 Nov 2010 |
C1001836-v1 |
Specification for De-Installation - Washington site. |
John Worden et al. |
Observatory Facilities
Installation
Procurements
|
11 Nov 2010 |
|
|
|
None
|
|
D0900946-v4 |
D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
Final Design
System Engineering
Vacuum
|
23 Aug 2010 |
D0900947-v4 |
Adapter A-17, 44 5/8" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
System Engineering
Vacuum
Final Design
|
06 Jul 2010 |
D0902632-v7 |
MCA Spool |
John Worden et al. |
Vacuum
|
18 May 2010 |
D0902631-v5 |
MCB Spool |
John Worden et al. |
Vacuum
|
18 May 2010 |
D0900948-v3 |
Adapter A-18, 60 1/2" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
Final Design
Vacuum
System Engineering
|
18 May 2010 |
D1000188-v1 |
44 5/8" Grooved and slotted flange |
John Worden et al. |
Vacuum
|
11 May 2010 |
E0900411-v4 |
Specification for Vacuum Equipment Design and Fabrication |
John Worden et al. |
Vacuum
|
08 Apr 2010 |
D1000245-v1 |
IO Tubes CORNER STATION LAYOUT |
John Worden et al. |
Vacuum
|
02 Feb 2010 |
E960085-v2 |
Specification for O-Ring Procurement |
John Worden et al. |
Fabrication
Vacuum
|
22 Jan 2010 |
E0900439-v1 |
Specification for SS Bellows |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900431-v1 |
Specification for O-Ring Installation |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900430-v1 |
Specification for Cleanliness Testing |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900429-v1 |
Specification for Raw Material Handling |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900428-v1 |
Specification for Welding Repairs |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902728-v1 |
Tie Rod assembly 1 1/4 inch |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902687-v3 |
External Loads at Mid Station Spool |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
G0901032-v1 |
Photos of LIGO Facility |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0902724-v2 |
84.25 IN Flange - Flat Faced (PSI Ref. V0494127) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Vacuum
System Engineering
Integration
|
11 Jan 2010 |
D0902729-v1 |
Sample 60 inch Vacuum Test Cover |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0902727-v1 |
Tie Rod assembly 1 inch |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961105-v1 |
Grooved flange 84.25 inch (Ref V0494021) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961104-v1 |
Flange Grooved 72.25 inch (Ref V0494020 ) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961111-v1 |
Flange 60.5 inch Grooved and Slotted |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D970409-v1 |
Flange flat faced 60.5 inch (Ref V0494097) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
E0900408-v1 |
Specification for Welding Inspection. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900404-v1 |
Specification for Vacuum component leak checking. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900407-v2 |
Specification for Vacuum component Bake-Out |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900409-v1 |
Specification for Black Light Inspection. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
E0900403-v2 |
Specification for Vacuum component cleaning. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
D0900954-v1 |
Flat Faced Flange, 45.19" I.D. x 80" O.D., LIGO VE |
Dennis Coyne et al. |
Final Design
Vacuum
|
09 Dec 2009 |
D0902630-v1 |
Mid Station Spool |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0902633-v1 |
Sample drawing package |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0900953-v1 |
Grooved and Slotted Flange, 44.25" I.D., LIGO VE |
Dennis Coyne et al. |
Final Design
Vacuum
|
07 Dec 2009 |
D0900963-v1 |
Flat Faced Flange, 44 5/8" ID, LIGO VE |
Dennis Coyne et al. |
Vacuum
Final Design
|
07 Dec 2009 |
D0900961-v1 |
Flat Faced Flange, 45.19" ID x 68.25" OD, LIGO VE |
Dennis Coyne et al. |
Final Design
Vacuum
|
07 Dec 2009 |
D0902636-v1 |
Shipping Cover Air Purification System |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
E960046-v1 |
Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) |
Dennis Coyne |
Vacuum
Fabrication
|
09 Jul 2009 |
T960205-x0 |
Edwards High Vacuum Pump Instruction Manual for the EXC Turbomolecular Pump Controllers |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
T960201-x0 |
Edwards High Vacuum Pump Instruction Manual for the STP-H 2000C Turbo Molecular Pump |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
T960202-x0 |
Edwards High Vacuum Pump Instruction Manual for the Drystar EDP200 and EDP300 Chemical Dry Vacuum Pumps |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
T960204-x0 |
Edwards High Vacuum Pump Instruction Manual for the QDP Drystar Vacuum Pump |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
T960206-x0 |
Edwards High Vacuum Pump Instruction Manual for the EXT Turbomolecular Pumps |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
T960203-x0 |
Edwards High Vacuum Pump Instruction Manual for the EH Mechanical Booster Pumps |
Richard Bagley |
Document Migration
|
16 Aug 1999 |
E960034-x0 |
Specification for Ion Pumps for Vacuum Equipment - Hanford and Livingston |
Richard Bagley et al. |
Document Migration
|
02 Apr 1996 |
D960030-x0 |
LIGO Vacuum Equipment Issued to LIGO for Information - Equipment Arrangement, Right End Station, Washington/Louisiana Sites |
Richard Bagley |
Document Migration
|
20 Feb 1996 |