Document List by Author

New Code Deployment on DCC.

A new version of DCC code was just deployed. Our team is currently checking that nothing unexpected happened in the process.

This message will be removed shortly.

In the meantime please use the following read-only replicas:

Status message last updated at: Sun Apr 27 20:09:52 PDT 2025

Richard Bagley of LIGO - Hanford Observatory is listed as an author on the following documents:
(List events moderated by Richard Bagley)

LIGO-Number Title Author(s) Topic(s) Last Updated
D1003029-v1 Work Platform Example Drawing Sam Barnum et al. Requirements
Observatory Facilities
26 Oct 2023
E1000654-v5 Specification for LIGO BSC Work Platforms John Worden et al. Installation
19 Oct 2023
E1000046-v1 Vacuum System Viton O-ring Procurement Specification John Worden et al. Vacuum
02 Mar 2023
D990684-v1 Final "As-built" Vacuum Equipment Documents & Drawings for Initial LIGO John Worden et al. Vacuum
05 Jan 2021
C960962-x0 LIGO Vacuum Equipment, Final Design Report, Revision 2 - Project Management Plan, Volume 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960967-x0 LIGO Vacuum Equipment, Final Design Report - Installation/Commissioning, Volume IV, Revision 3 (CDRL 03) Psi Psi et al. Document Migration
16 Sep 2020
C960964-x0 LIGO Vacuum Equipment, Final Design Report - Calculations, Volume 2 - Attachment 1-4, Revision 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960966-x0 LIGO Vacuum Equipment, Final Design Report - Fabrication, Volume 3, Revision 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960965-x0 LIGO Vacuum Equipment, Final Design Report - Specifications, Volume 2 - Attachment 5 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
E0900402-v1 Specification for SS Plate John Worden et al. Vacuum
16 Sep 2020
E960127-x0 Operating Procedure for the 80K Pump of the LIGO Vacuum Equipment - Livingston and Hanford, Rev. 02 Psi Psi et al. Document Migration
16 Sep 2020
E970036-x0 Specification for Structural Carbon Steel Fabrication and Painting for LIGO Vacuum Equipment Richard Bagley Document Migration
16 Sep 2020
E960132-x0 Fabrication Plan for Horizontal Access Modules (HAM), LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
16 Sep 2020
E960133-x0 Fabrication Plan for 80K Cryopumps, LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
16 Sep 2020
D1100112-v1 Adapter A-18 Jodi Fauver et al. Installation
16 Sep 2020
D1100110-v1 Adapter A-16 John Worden et al. Installation
16 Sep 2020
E970172-x0 O-Ring Installation and Flange Assembly Procedure for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley et al. Document Migration
16 Sep 2020
E0900406-v1 Specification for SS Rolling and Machining. John Worden et al. Vacuum
16 Sep 2020
E0900405-v1 Specification for SS Flange Forgings. John Worden et al. Vacuum
16 Sep 2020
D0902635-v1 Annulus Piping Detail. John Worden et al. Vacuum
16 Sep 2020
E960003-x0 Specification for Bakeout Blanket System for the Vacuum Equipment Richard Bagley et al. Document Migration
16 Sep 2020
E960004-x0 Specification for Roughing Pump Carts for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
16 Sep 2020
E950120-x0 Specifications for Stainless Steel Flange Forgings for LIGO Vacuum Equipment, Hanford and Livingston, Rev. 03 Psi Psi et al. Document Migration
16 Sep 2020
C961940-x0 Cambridge Acoustical Associates (CAA) Preliminary Report on 80K Pump Bubble Noise and Technical Article Richard Bagley Document Migration
27 Jul 2018
C962160-x0 80K Pump Test Data Richard Bagley Document Migration
27 Jul 2018
C962452-x0 Prototype BSC Data Review Package - CDRL 11 Richard Bagley Document Migration
27 Jul 2018
C962713-x0 Cambridge Acoustical Associates Data for the Prototype Vessel Data Review Richard Bagley Document Migration
26 Jul 2018
C982423-x0 Washington Corner Station Acceptance Test Report Richard Bagley Document Migration
27 Mar 2018
C982419-x0 Washington Corner Station Documentation Package: Vertex Section, Volumes 1 through 3 Richard Bagley Document Migration
27 Mar 2018
C981626-x0 Washington Site - Left Arm Stations, Acceptance Test Review Data Package (CDRL 07-1) Richard Bagley Document Migration
27 Mar 2018
C990033-x0 LIGO Vacuum Equipment, Louisiana Site - Installation & Alignment Documentation Package Richard Bagley Document Migration
14 Mar 2018
C960963-x0 LIGO Vacuum Equipment, Final Design Report, - Design, Volume 2, Revision 1 (CDRL 03) Richard Bagley Document Migration
18 Jan 2018
C970091-x0 Measurement and Analysis of LIGO Vacuum System Shock Vibration, and Acoustic Noise, Rev. 2 - Prepared by Cambridge Acoustical Associates Richard Bagley Document Migration
06 Apr 2017
D970451-x0 25 Annulus Tubing ISO, 44" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970449-x0 25 Annulus Tubing ISO, 44" Gate Valve Type 1, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970417-x0 25 Annulus Tubing ISO, 48" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970415-x0 25 Annulus Tubing ISO, 48" Gate Valve Type I, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D070107-v2 HAM6 Septum Plate for ELIGO Jim Warner Vacuum
Final Design
10 Jun 2013
E980091-x0 Procedure for Backfill/Pumpdown Demonstration and LN2 Consumption Test - LIGO Vacuum Equipment, Hanford and Livingston Richard Bagley Document Migration
19 Jun 2012
E970176-x0 Specification for Booster Pump Skid for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
19 Jun 2012
E970174-x0 Washington Site Redesign of Equipment Anchorage for Extended Grout Pads Richard Bagley Document Migration
19 Jun 2012
E970173-x0 Support Design for Adapters LB-1A & LB-1C Richard Bagley Document Migration
19 Jun 2012
E970171-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - End Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970170-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Mid Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970169-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Corner Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970168-x0 Acceptance Test Procedure for Bakeout System Blankets and Carts for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley et al. Document Migration
19 Jun 2012
E970002-x0 Specification for Leak Check Plan for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960134-x0 Fabrication Plan for Spools and Beam Tubes, LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960131-x0 Fabrication Plan for Beam Splitter Chamber (BSC), LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960008-x0 Specification for Piping Design and Material for LIGO Vacuum Equipment - Hanford & Livingston, Rev. 07 Psi Psi et al. Document Migration
14 Jun 2012
E960007-x0 Specification for General Equipment Requirements for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
14 Jun 2012
E960006-x0 Specification for Auxilliary Turbomolecular Carts for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
14 Jun 2012
E960005-x0 Specification for Main Turbomolecular Carts for the Vacuum Equipment, Revision 3 Richard Bagley Document Migration
14 Jun 2012
E960002-x0 Specification for Portable Soft-Walled Cleanroom, Revision 0 Richard Bagley Document Migration
14 Jun 2012
E960001-x0 Specification for Clean Air Supply Systems, Revision 0 Richard Bagley Document Migration
14 Jun 2012
E950118-x0 Bill of Material for BSC Prototype Richard Bagley Document Migration
12 Jun 2012
E950095-x0 Specification for 112 and 122 CM Gate Valves for LIGO Vacuum Equipment Richard Bagley et al. Document Migration
12 Jun 2012
C1105429-v3 SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay Richard Bagley et al. Procurements
Integration
Vacuum
Cleaning
Fabrication
17 Aug 2011
D1002926-v2 Module-E, BSC Cartridge installation, aLIGO Sam Barnum et al. Installation
Observatory Facilities
15 Jun 2011
E1000711-v3 ALIGO LA Corner Station VE Installation Specification John Worden et al. Installation
11 Apr 2011
E1000712-v3 Anchor Bolt Installation John Worden et al. Installation
06 Apr 2011
E1000708-v1 WA Corner Station Installation Jodi Fauver et al. Installation
29 Mar 2011
E0900410-v4 Vacuum Component List John Worden et al. Vacuum
21 Mar 2011
E1000718-v1 Specification for Vacuum/Clean Air Piping John Worden et al. Installation
03 Mar 2011
E1000717-v1 Specification for Piping Thermal Insulation John Worden et al. Installation
03 Mar 2011
E1000713-v1 Specification for Piping Design and Material John Worden et al. Installation
03 Mar 2011
E1000715-v1 Specification for Pipe Cleaning John Worden et al. Installation
03 Mar 2011
D1003179-v2 aLIGO Installation, LHO Corner Station Vacuum Equipment Layout John Worden et al. Installation
28 Feb 2011
D1003180-v2 aLIGO Installation, LLO Corner Station Vacuum Equipment Layout John Worden et al. Installation
24 Feb 2011
E1000707-v5 WA Mid/End VE Installation John Worden et al. Installation
04 Feb 2011
D1100113-v1 Mid-Station Spool-LHO John Worden et al. Installation
21 Jan 2011
D1100111-v1 Adapter A-17 John Worden et al. Installation
21 Jan 2011
E1000716-v1 Component Alignment Procedure John Worden et al. Installation
20 Jan 2011
E1000719-v1 Contamination Control for Adv. LIGO Vacuum Equipment Installation John Worden et al. Installation
20 Jan 2011
D1003175-v2 aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003176-v2 aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003178-v1 aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
D1003177-v1 aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
E1000714-x0 Vacuum Valves John Worden et al. Installation
16 Nov 2010
C1001836-v1 Specification for De-Installation - Washington site. John Worden et al. Observatory Facilities
Procurements
Installation
11 Nov 2010
None
D0900946-v4 D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment Dennis Coyne et al. System Engineering
Vacuum
Final Design
23 Aug 2010
D0900947-v4 Adapter A-17, 44 5/8" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment Dennis Coyne et al. Final Design
Vacuum
System Engineering
06 Jul 2010
D0902632-v7 MCA Spool John Worden et al. Vacuum
18 May 2010
D0902631-v5 MCB Spool John Worden et al. Vacuum
18 May 2010
D0900948-v3 Adapter A-18, 60 1/2" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment Dennis Coyne et al. Final Design
System Engineering
Vacuum
18 May 2010
D1000188-v1 44 5/8" Grooved and slotted flange John Worden et al. Vacuum
11 May 2010
E0900411-v4 Specification for Vacuum Equipment Design and Fabrication John Worden et al. Vacuum
08 Apr 2010
D1000245-v1 IO Tubes CORNER STATION LAYOUT John Worden et al. Vacuum
02 Feb 2010
E960085-v2 Specification for O-Ring Procurement John Worden et al. Fabrication
Vacuum
22 Jan 2010
E0900439-v1 Specification for SS Bellows John Worden et al. Vacuum
12 Jan 2010
E0900431-v1 Specification for O-Ring Installation John Worden et al. Vacuum
12 Jan 2010
E0900430-v1 Specification for Cleanliness Testing John Worden et al. Vacuum
12 Jan 2010
E0900429-v1 Specification for Raw Material Handling John Worden et al. Vacuum
12 Jan 2010
E0900428-v1 Specification for Welding Repairs John Worden et al. Vacuum
12 Jan 2010
D0902728-v1 Tie Rod assembly 1 1/4 inch John Worden et al. Vacuum
12 Jan 2010
D0902687-v3 External Loads at Mid Station Spool John Worden et al. Vacuum
11 Jan 2010
G0901032-v1 Photos of LIGO Facility John Worden et al. Vacuum
11 Jan 2010
D0902724-v2 84.25 IN Flange - Flat Faced (PSI Ref. V0494127) John Worden et al. Vacuum
11 Jan 2010
D0900928-v2 D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO John Worden et al. Integration
Vacuum
System Engineering
11 Jan 2010
D0902729-v1 Sample 60 inch Vacuum Test Cover John Worden et al. Vacuum
11 Jan 2010
D0902727-v1 Tie Rod assembly 1 inch John Worden et al. Vacuum
11 Jan 2010
D961105-v1 Grooved flange 84.25 inch (Ref V0494021) John Worden et al. Vacuum
11 Jan 2010
D961104-v1 Flange Grooved 72.25 inch (Ref V0494020 ) John Worden et al. Vacuum
11 Jan 2010
D961111-v1 Flange 60.5 inch Grooved and Slotted John Worden et al. Vacuum
11 Jan 2010
D970409-v1 Flange flat faced 60.5 inch (Ref V0494097) John Worden et al. Vacuum
11 Jan 2010
E0900408-v1 Specification for Welding Inspection. John Worden et al. Vacuum
05 Jan 2010
E0900404-v1 Specification for Vacuum component leak checking. John Worden et al. Vacuum
05 Jan 2010
E0900407-v2 Specification for Vacuum component Bake-Out John Worden et al. Vacuum
05 Jan 2010
E0900409-v1 Specification for Black Light Inspection. John Worden et al. Vacuum
29 Dec 2009
E0900403-v2 Specification for Vacuum component cleaning. John Worden et al. Vacuum
29 Dec 2009
D0900954-v1 Flat Faced Flange, 45.19" I.D. x 80" O.D., LIGO VE Dennis Coyne et al. Final Design
Vacuum
09 Dec 2009
D0902630-v1 Mid Station Spool John Worden et al. Vacuum
07 Dec 2009
D0902633-v1 Sample drawing package John Worden et al. Vacuum
07 Dec 2009
D0900953-v1 Grooved and Slotted Flange, 44.25" I.D., LIGO VE Dennis Coyne et al. Vacuum
Final Design
07 Dec 2009
D0900963-v1 Flat Faced Flange, 44 5/8" ID, LIGO VE Dennis Coyne et al. Final Design
Vacuum
07 Dec 2009
D0900961-v1 Flat Faced Flange, 45.19" ID x 68.25" OD, LIGO VE Dennis Coyne et al. Final Design
Vacuum
07 Dec 2009
D0902636-v1 Shipping Cover Air Purification System John Worden et al. Vacuum
07 Dec 2009
E960046-v1 Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) Dennis Coyne Fabrication
Vacuum
09 Jul 2009
T960202-x0 Edwards High Vacuum Pump Instruction Manual for the Drystar EDP200 and EDP300 Chemical Dry Vacuum Pumps Richard Bagley Document Migration
16 Aug 1999
T960204-x0 Edwards High Vacuum Pump Instruction Manual for the QDP Drystar Vacuum Pump Richard Bagley Document Migration
16 Aug 1999
T960206-x0 Edwards High Vacuum Pump Instruction Manual for the EXT Turbomolecular Pumps Richard Bagley Document Migration
16 Aug 1999
T960201-x0 Edwards High Vacuum Pump Instruction Manual for the STP-H 2000C Turbo Molecular Pump Richard Bagley Document Migration
16 Aug 1999
T960203-x0 Edwards High Vacuum Pump Instruction Manual for the EH Mechanical Booster Pumps Richard Bagley Document Migration
16 Aug 1999
T960205-x0 Edwards High Vacuum Pump Instruction Manual for the EXC Turbomolecular Pump Controllers Richard Bagley Document Migration
16 Aug 1999
E960034-x0 Specification for Ion Pumps for Vacuum Equipment - Hanford and Livingston Richard Bagley et al. Document Migration
02 Apr 1996
D960030-x0 LIGO Vacuum Equipment Issued to LIGO for Information - Equipment Arrangement, Right End Station, Washington/Louisiana Sites Richard Bagley Document Migration
20 Feb 1996

Number of documents found: 127


DCC Version 3.5.1, contact DCC Help