Document List by Author

Richard Bagley of LIGO - Hanford Observatory is listed as an author on the following documents:
(List events moderated by Richard Bagley)

LIGO-Number Title Author(s) Topic(s) Last Updated
D1003029-v1 Work Platform Example Drawing Sam Barnum et al. Requirements
Observatory Facilities
26 Oct 2023
E1000654-v5 Specification for LIGO BSC Work Platforms John Worden et al. Installation
19 Oct 2023
E1000046-v1 Vacuum System Viton O-ring Procurement Specification John Worden et al. Vacuum
02 Mar 2023
D990684-v1 Final "As-built" Vacuum Equipment Documents & Drawings for Initial LIGO John Worden et al. Vacuum
05 Jan 2021
C960962-x0 LIGO Vacuum Equipment, Final Design Report, Revision 2 - Project Management Plan, Volume 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960967-x0 LIGO Vacuum Equipment, Final Design Report - Installation/Commissioning, Volume IV, Revision 3 (CDRL 03) Psi Psi et al. Document Migration
16 Sep 2020
C960964-x0 LIGO Vacuum Equipment, Final Design Report - Calculations, Volume 2 - Attachment 1-4, Revision 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960966-x0 LIGO Vacuum Equipment, Final Design Report - Fabrication, Volume 3, Revision 1 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
C960965-x0 LIGO Vacuum Equipment, Final Design Report - Specifications, Volume 2 - Attachment 5 (CDRL 03) Richard Bagley Document Migration
16 Sep 2020
E0900402-v1 Specification for SS Plate John Worden et al. Vacuum
16 Sep 2020
E960127-x0 Operating Procedure for the 80K Pump of the LIGO Vacuum Equipment - Livingston and Hanford, Rev. 02 Psi Psi et al. Document Migration
16 Sep 2020
E970036-x0 Specification for Structural Carbon Steel Fabrication and Painting for LIGO Vacuum Equipment Richard Bagley Document Migration
16 Sep 2020
E960132-x0 Fabrication Plan for Horizontal Access Modules (HAM), LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
16 Sep 2020
E960133-x0 Fabrication Plan for 80K Cryopumps, LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
16 Sep 2020
D1100112-v1 Adapter A-18 Jodi Fauver et al. Installation
16 Sep 2020
D1100110-v1 Adapter A-16 John Worden et al. Installation
16 Sep 2020
E970172-x0 O-Ring Installation and Flange Assembly Procedure for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley et al. Document Migration
16 Sep 2020
E0900406-v1 Specification for SS Rolling and Machining. John Worden et al. Vacuum
16 Sep 2020
E0900405-v1 Specification for SS Flange Forgings. John Worden et al. Vacuum
16 Sep 2020
D0902635-v1 Annulus Piping Detail. John Worden et al. Vacuum
16 Sep 2020
E960003-x0 Specification for Bakeout Blanket System for the Vacuum Equipment Richard Bagley et al. Document Migration
16 Sep 2020
E960004-x0 Specification for Roughing Pump Carts for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
16 Sep 2020
E950120-x0 Specifications for Stainless Steel Flange Forgings for LIGO Vacuum Equipment, Hanford and Livingston, Rev. 03 Psi Psi et al. Document Migration
16 Sep 2020
C961940-x0 Cambridge Acoustical Associates (CAA) Preliminary Report on 80K Pump Bubble Noise and Technical Article Richard Bagley Document Migration
27 Jul 2018
C962160-x0 80K Pump Test Data Richard Bagley Document Migration
27 Jul 2018
C962452-x0 Prototype BSC Data Review Package - CDRL 11 Richard Bagley Document Migration
27 Jul 2018
C962713-x0 Cambridge Acoustical Associates Data for the Prototype Vessel Data Review Richard Bagley Document Migration
26 Jul 2018
C982423-x0 Washington Corner Station Acceptance Test Report Richard Bagley Document Migration
27 Mar 2018
C982419-x0 Washington Corner Station Documentation Package: Vertex Section, Volumes 1 through 3 Richard Bagley Document Migration
27 Mar 2018
C981626-x0 Washington Site - Left Arm Stations, Acceptance Test Review Data Package (CDRL 07-1) Richard Bagley Document Migration
27 Mar 2018
C990033-x0 LIGO Vacuum Equipment, Louisiana Site - Installation & Alignment Documentation Package Richard Bagley Document Migration
14 Mar 2018
C960963-x0 LIGO Vacuum Equipment, Final Design Report, - Design, Volume 2, Revision 1 (CDRL 03) Richard Bagley Document Migration
18 Jan 2018
C970091-x0 Measurement and Analysis of LIGO Vacuum System Shock Vibration, and Acoustic Noise, Rev. 2 - Prepared by Cambridge Acoustical Associates Richard Bagley Document Migration
06 Apr 2017
D970451-x0 25 Annulus Tubing ISO, 44" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970449-x0 25 Annulus Tubing ISO, 44" Gate Valve Type 1, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970417-x0 25 Annulus Tubing ISO, 48" Gate Valve Type II, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D970415-x0 25 Annulus Tubing ISO, 48" Gate Valve Type I, LIGO Vacuum Equipment, Rev. 02 Richard Bagley et al. Document Migration
21 Apr 2014
D070107-v2 HAM6 Septum Plate for ELIGO Jim Warner Vacuum
Final Design
10 Jun 2013
E980091-x0 Procedure for Backfill/Pumpdown Demonstration and LN2 Consumption Test - LIGO Vacuum Equipment, Hanford and Livingston Richard Bagley Document Migration
19 Jun 2012
E970176-x0 Specification for Booster Pump Skid for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
19 Jun 2012
E970174-x0 Washington Site Redesign of Equipment Anchorage for Extended Grout Pads Richard Bagley Document Migration
19 Jun 2012
E970173-x0 Support Design for Adapters LB-1A & LB-1C Richard Bagley Document Migration
19 Jun 2012
E970171-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - End Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970170-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Mid Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970169-x0 Systems Acceptance Test Procedure, LIGO Vacuum Equipment - Corner Stations, Hanford & Livingston, Rev. 04 Psi Psi et al. Document Migration
19 Jun 2012
E970168-x0 Acceptance Test Procedure for Bakeout System Blankets and Carts for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley et al. Document Migration
19 Jun 2012
E970002-x0 Specification for Leak Check Plan for LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960134-x0 Fabrication Plan for Spools and Beam Tubes, LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960131-x0 Fabrication Plan for Beam Splitter Chamber (BSC), LIGO Vacuum Equipment - Hanford & Livingston Richard Bagley Document Migration
14 Jun 2012
E960008-x0 Specification for Piping Design and Material for LIGO Vacuum Equipment - Hanford & Livingston, Rev. 07 Psi Psi et al. Document Migration
14 Jun 2012
E960007-x0 Specification for General Equipment Requirements for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
14 Jun 2012
E960006-x0 Specification for Auxilliary Turbomolecular Carts for the Vacuum Equipment, Revision 2 Richard Bagley Document Migration
14 Jun 2012
E960005-x0 Specification for Main Turbomolecular Carts for the Vacuum Equipment, Revision 3 Richard Bagley Document Migration
14 Jun 2012
E960002-x0 Specification for Portable Soft-Walled Cleanroom, Revision 0 Richard Bagley Document Migration
14 Jun 2012
E960001-x0 Specification for Clean Air Supply Systems, Revision 0 Richard Bagley Document Migration
14 Jun 2012
E950118-x0 Bill of Material for BSC Prototype Richard Bagley Document Migration
12 Jun 2012
E950095-x0 Specification for 112 and 122 CM Gate Valves for LIGO Vacuum Equipment Richard Bagley et al. Document Migration
12 Jun 2012
C1105429-v3 SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay Richard Bagley et al. Integration
Fabrication
Cleaning
Vacuum
Procurements
17 Aug 2011
D1002926-v2 Module-E, BSC Cartridge installation, aLIGO Sam Barnum et al. Observatory Facilities
Installation
15 Jun 2011
E1000711-v3 ALIGO LA Corner Station VE Installation Specification John Worden et al. Installation
11 Apr 2011
E1000712-v3 Anchor Bolt Installation John Worden et al. Installation
06 Apr 2011
E1000708-v1 WA Corner Station Installation Jodi Fauver et al. Installation
29 Mar 2011
E0900410-v4 Vacuum Component List John Worden et al. Vacuum
21 Mar 2011
E1000718-v1 Specification for Vacuum/Clean Air Piping John Worden et al. Installation
03 Mar 2011
E1000717-v1 Specification for Piping Thermal Insulation John Worden et al. Installation
03 Mar 2011
E1000713-v1 Specification for Piping Design and Material John Worden et al. Installation
03 Mar 2011
E1000715-v1 Specification for Pipe Cleaning John Worden et al. Installation
03 Mar 2011
D1003179-v2 aLIGO Installation, LHO Corner Station Vacuum Equipment Layout John Worden et al. Installation
28 Feb 2011
D1003180-v2 aLIGO Installation, LLO Corner Station Vacuum Equipment Layout John Worden et al. Installation
24 Feb 2011
E1000707-v5 WA Mid/End VE Installation John Worden et al. Installation
04 Feb 2011
D1100113-v1 Mid-Station Spool-LHO John Worden et al. Installation
21 Jan 2011
D1100111-v1 Adapter A-17 John Worden et al. Installation
21 Jan 2011
E1000716-v1 Component Alignment Procedure John Worden et al. Installation
20 Jan 2011
E1000719-v1 Contamination Control for Adv. LIGO Vacuum Equipment Installation John Worden et al. Installation
20 Jan 2011
D1003175-v2 aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003176-v2 aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003178-v1 aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
D1003177-v1 aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
E1000714-x0 Vacuum Valves John Worden et al. Installation
16 Nov 2010
C1001836-v1 Specification for De-Installation - Washington site. John Worden et al. Observatory Facilities
Installation
Procurements
11 Nov 2010
None
D0900946-v4 D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment Dennis Coyne et al. Final Design
System Engineering
Vacuum
23 Aug 2010
D0900947-v4 Adapter A-17, 44 5/8" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment Dennis Coyne et al. System Engineering
Vacuum
Final Design
06 Jul 2010
D0902632-v7 MCA Spool John Worden et al. Vacuum
18 May 2010
D0902631-v5 MCB Spool John Worden et al. Vacuum
18 May 2010
D0900948-v3 Adapter A-18, 60 1/2" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment Dennis Coyne et al. Final Design
Vacuum
System Engineering
18 May 2010
D1000188-v1 44 5/8" Grooved and slotted flange John Worden et al. Vacuum
11 May 2010
E0900411-v4 Specification for Vacuum Equipment Design and Fabrication John Worden et al. Vacuum
08 Apr 2010
D1000245-v1 IO Tubes CORNER STATION LAYOUT John Worden et al. Vacuum
02 Feb 2010
E960085-v2 Specification for O-Ring Procurement John Worden et al. Fabrication
Vacuum
22 Jan 2010
E0900439-v1 Specification for SS Bellows John Worden et al. Vacuum
12 Jan 2010
E0900431-v1 Specification for O-Ring Installation John Worden et al. Vacuum
12 Jan 2010
E0900430-v1 Specification for Cleanliness Testing John Worden et al. Vacuum
12 Jan 2010
E0900429-v1 Specification for Raw Material Handling John Worden et al. Vacuum
12 Jan 2010
E0900428-v1 Specification for Welding Repairs John Worden et al. Vacuum
12 Jan 2010
D0902728-v1 Tie Rod assembly 1 1/4 inch John Worden et al. Vacuum
12 Jan 2010
D0902687-v3 External Loads at Mid Station Spool John Worden et al. Vacuum
11 Jan 2010
G0901032-v1 Photos of LIGO Facility John Worden et al. Vacuum
11 Jan 2010
D0902724-v2 84.25 IN Flange - Flat Faced (PSI Ref. V0494127) John Worden et al. Vacuum
11 Jan 2010
D0900928-v2 D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO John Worden et al. Vacuum
System Engineering
Integration
11 Jan 2010
D0902729-v1 Sample 60 inch Vacuum Test Cover John Worden et al. Vacuum
11 Jan 2010
D0902727-v1 Tie Rod assembly 1 inch John Worden et al. Vacuum
11 Jan 2010
D961105-v1 Grooved flange 84.25 inch (Ref V0494021) John Worden et al. Vacuum
11 Jan 2010
D961104-v1 Flange Grooved 72.25 inch (Ref V0494020 ) John Worden et al. Vacuum
11 Jan 2010
D961111-v1 Flange 60.5 inch Grooved and Slotted John Worden et al. Vacuum
11 Jan 2010
D970409-v1 Flange flat faced 60.5 inch (Ref V0494097) John Worden et al. Vacuum
11 Jan 2010
E0900408-v1 Specification for Welding Inspection. John Worden et al. Vacuum
05 Jan 2010
E0900404-v1 Specification for Vacuum component leak checking. John Worden et al. Vacuum
05 Jan 2010
E0900407-v2 Specification for Vacuum component Bake-Out John Worden et al. Vacuum
05 Jan 2010
E0900409-v1 Specification for Black Light Inspection. John Worden et al. Vacuum
29 Dec 2009
E0900403-v2 Specification for Vacuum component cleaning. John Worden et al. Vacuum
29 Dec 2009
D0900954-v1 Flat Faced Flange, 45.19" I.D. x 80" O.D., LIGO VE Dennis Coyne et al. Final Design
Vacuum
09 Dec 2009
D0902630-v1 Mid Station Spool John Worden et al. Vacuum
07 Dec 2009
D0902633-v1 Sample drawing package John Worden et al. Vacuum
07 Dec 2009
D0900953-v1 Grooved and Slotted Flange, 44.25" I.D., LIGO VE Dennis Coyne et al. Final Design
Vacuum
07 Dec 2009
D0900963-v1 Flat Faced Flange, 44 5/8" ID, LIGO VE Dennis Coyne et al. Vacuum
Final Design
07 Dec 2009
D0900961-v1 Flat Faced Flange, 45.19" ID x 68.25" OD, LIGO VE Dennis Coyne et al. Final Design
Vacuum
07 Dec 2009
D0902636-v1 Shipping Cover Air Purification System John Worden et al. Vacuum
07 Dec 2009
E960046-v1 Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) Dennis Coyne Vacuum
Fabrication
09 Jul 2009
T960205-x0 Edwards High Vacuum Pump Instruction Manual for the EXC Turbomolecular Pump Controllers Richard Bagley Document Migration
16 Aug 1999
T960201-x0 Edwards High Vacuum Pump Instruction Manual for the STP-H 2000C Turbo Molecular Pump Richard Bagley Document Migration
16 Aug 1999
T960202-x0 Edwards High Vacuum Pump Instruction Manual for the Drystar EDP200 and EDP300 Chemical Dry Vacuum Pumps Richard Bagley Document Migration
16 Aug 1999
T960204-x0 Edwards High Vacuum Pump Instruction Manual for the QDP Drystar Vacuum Pump Richard Bagley Document Migration
16 Aug 1999
T960206-x0 Edwards High Vacuum Pump Instruction Manual for the EXT Turbomolecular Pumps Richard Bagley Document Migration
16 Aug 1999
T960203-x0 Edwards High Vacuum Pump Instruction Manual for the EH Mechanical Booster Pumps Richard Bagley Document Migration
16 Aug 1999
E960034-x0 Specification for Ion Pumps for Vacuum Equipment - Hanford and Livingston Richard Bagley et al. Document Migration
02 Apr 1996
D960030-x0 LIGO Vacuum Equipment Issued to LIGO for Information - Equipment Arrangement, Right End Station, Washington/Louisiana Sites Richard Bagley Document Migration
20 Feb 1996

Number of documents found: 127


DCC Version 3.5.0, contact DCC Help